Loading...
HomeMy WebLinkAboutBLEVINS - Filed CS-COMMENT SHEETS - 2003-05-28Develop: nt Services Planning Department City of Fort Collins October 18, 1991 Robert K. Glover 2101 Lindenmeier Rd. Fort Collins, CO 80524 Dear Robert, City Staff has reviewed your submittal for the Blevins Court Lot 9 PUD and offers the following comments: 1. Please indicate on the site plan the proposed setbacks to all lot lines. 2. Relocate the north arrow and scale of the site plan so it doesn't get lost on the site plan and also, indicate a separate scale for the vicinity map. Place the title (BLEVINS COURT, LOT 9 PUD) in large letters across the top and center of the Site/Landscape Plan. The plan should be labeled as a Site and Landscape Plan, since you have combined the two on one plan„ 3. Indicate on the site plan, what the existing use is for lots 5, 6, 7, 11, 14, as well as the two large lots to the north and west of this property. What is the existing use of the property directly to the west of this lot, is it a yard for the existing house? 4. A fire hydrant must be provided within 400' of the lot. Please show on the site plan and Utility plan where the closest hydrant/s are located. 5. Any damaged curb, gutter, and sidewalk must be repaired in conjunction with this request. 6. Electric service to the building will be underground. 7. The Utility Plan has a note that existing overhead electric (and phone) will be placed underground. This will not happen at this time, as far as electric is concerned. Contact Doug Martine at Light and Power, if you have questions about this. Contact US West for information on their schedule for undergrounding existing phone lines. 8. Staff encourages you to coordinate installation of the electric system with Light and Power. There will be development charges from Light and Power, contact Doug Martine for more details. 281 North College Avemie • P.O. Boy 580 • Fort Collins, CO 80322-0;80 • (301) �" 1-n-;tl PROJECT City of ns COMMENT SHEET DATE: 3 Mar 92 DEPARTMENT: ITEM: 42-91B BLEVINS COURT PUD, Lot 9 - Final Please respond to this project by Friday, March 13, 1992 Planner: Kirsten Whetstone No Problems Problems or Concerns (see below) ;7 �q,e Date: �/ Signature: CHECK IF REVISIONS REQUIRED: ❑ LA)ilvllp-�' Ll PLAT SITE LANDSCAPE UTILITY PLANNING DEPARTMENT 281 NORTH COLLEGE P.O.BOX 580 FORT COLLINS, COLORADO 80522-0580 (303)221-6750 PROJECT City of Fort Collins COMMENT SHEET DATE: 7 Jan 92 DEPARTMENT: ij , J, ; ITEM: 42-91A BLEVINS COURT PUD, Lot 9 - Prel. Please respond to this project by Friday, January 17, 1992 Planner: Kirsten Whetstone No Problems Problems or Concerns (see below) Date: p,,� Signature: CHECK IF REVISIONS REQUIRED: ❑ El El �ativ'1 1�1n9„k PLAT SITE LANDSCAPE UTILITY PLANNING DEPARTMENT 281 NORTH COLLEGE P.O.BOX 580 FORT COLLINS, COLORADO 80522-0580 (303)221-6750 PROJECT COMMENT SHEET City of Fort Col-lins DATE: 7 Jan 92 DEPARTMENT: C2', TV ITEM: 42-91A BLEVINS COURT PUD, Lot 9 - Prel. Please respond to this project by Friday, January 17, 1992 Planner: Kirsten Whetstone No Problems xx Problems or Concerns (see below) The only concern that Columbine CableVision has with this project would be to have the building prewired for Cable T.V. in a home run system with cable to our standards. We would be willing to advise the builder in order to accomplish this. Date: J r3/z Signature:, CHECK IF REVISIONS REQUIRED: ❑ PLAT ❑ SITE ❑ LANDSCAPE ❑ UTILITY PLANNING DEPARTMENT 281 NORTH COLLEGE P.O.BOS 580 FORT COLLINS, COLORADO 80522-0580 (303)221-6750 C� rk PROJECT City o«rtCol�, y COMMENT SHEET DATE: 7 Jan 92 DEPARTMENT: ITEM: .42-91A BLEVINS COURT PUD, Lot 9 - Prel. Please respond to this project by Friday, January 17, 1992 Planner: Kirsten Whetstone No Problems —A--0 Problems or Concerns (see below) Date: 0//0/ 9� Signature• T• "�"�— S1�'5 am r. � 3 CHECK IF REVISIONS REQUIRED: ❑ PLAT ❑ SITE ❑ LANDSCAPE ❑ UTILITY PLANNING DEPARTMENT 281 NORTII COLLEGE P.O.BOX 580 FORT COLLINS, COLORADO 80522-0580 (303)221-6750 0 A City of Fort Collins PROJECT COMMENT SHEET DATE: 7 Jan 92 DEPARTMENT: LS v�e4 ITEM: 42-91A BLEVINS COURT PUD, Lot 9 - Prel. Please respond to this project by Friday, January 17, 1992 Planner: Kirsten Whetstone No Problems Problems or Concerns (see below) Dat ?� Signatur6p"Z� CHECK IF REVISIONS REQUIRED: ❑ PLAT ❑ SITE ❑ LANDSCAPE ❑ UTILITY PLANING DEPARTMENT 281 NORTH COLLEGE P.O-BOX 580 FORT COLLINS, COLORADO 80522-0580 (303)221-6750 PROJECT AIN City af�,��ll,,,= COMMENT SHEET DATE: 1 oar 91 DEPARTMENT: 9 ITEM: #42-91 BLEVINS COURT PUD, Lot 9 Preliminary & Final Please respond to this project by Friday, October 11, 1991 Project Planner: Kirsten Whetstone No Problems Problems or Concerns (see below) Afrr��rv�-fie •fu ol-nVe , u1 4, � , Ae+7�1 I,-;, Date: t 2A Signature: CHECK IF REVISIONS REQUIRED: ❑ atpzj� gd��J- PLAT SITE LANDSCAPE UTILITY DEVELOPMENT SERVICES 281 NORTH COLLEGE P.O.BOX 580 FORT COLLINS, COLORADO 80522-0580 (303)221-6750 PLANNING DEPARTMENT 9. The City Water Utilities Department will install a 6-inch water main in Blevins Ct. next spring (Spring of 1992). The water service for lot 9 will be tapped to this main. Coordinate with Mark Taylor at 221-6681 on the timing of your water service. 10. A sanitary sewer main exists along the southern boundary of this lot. A 15-foot utility easement must be provided north of this existing sewer main, measured from the center line of the main, 15 feet to the north. The sewer service for this lot will be tapped to this sewer main. Please coordinate with Kerrie Ashbeck at 221-6750 for information on how to record that utility easement. Since the lot is already platted, you would need to describe the easement and file a legal description of it as a separate document. Please provide this information to the Planning/Engineering Department and show the easement on the site plan and Utility Plans. 11. A final planting list describing the proposed species and sizes should be shown on the site/landscape plan. This should include a listing for existing trees and shrubs as well. I have enclosed a photo copy of typical notes and planting schedules; and details which we request for landscape plans, please add these to the final site/landscape plan. If you propose to remove existing vegetation, have you first considered relocating it? Staff would discourage the removal of any existing significant vegetation. 12. The primary concern from the Stormwater Department is that the drainage report is a preliminary report and if this project is going as a preliminary/final PUD to the Planning and Zoning Board, then the drainage report needs to be upgraded to a final, with final details. 13. Off -site flows are a major concern with this project. This type of in -fill project typically has potential to cut-off flows that have been routed to a vacant piece of land, especially in older developments where todays City standards for drainage control have not been met. The report is good for a preliminary report but lacks the final detail needed for final approval. Please see the redlined report and plans for detailed comments and return them to Glen Schlueter with revisions,. If you have questions about the drainage report please contact Glen at 221-6589. 14. An erosion control plan for construction should be submitted with the final drainage plan. 15. The Utility Plans are preliminary in nature. If you intend to present this project to the Planning and Zoning Board as a preliminary/final PUD there are many loose ends that need to be addressed. Please coordinate with Kerrie Ashbeck or Mike Herzig at 221-6750 as soon as possible to ensure that you know what Utility Plan revisions are required. Engineering will need to review and approve the plan revisions prior to the November 18th Planning and Zoning Board Hearing. Please do not delay in getting them the revisions to review. 16. If you are not prepared to spend the time and money for final Utility Plans prior to a land use decision (concerning number of units, bedrooms, parking spaces, landscaping, fencing) from the P&Z Board, you have the option of taking this project to the Board as a preliminary PUD in November and as a final PUD on December 16th. 17. The site plan is labeled as a preliminary site plan which has caused some additional confusion. Please let me know whether this is a preliminary or a preliminary and final PUD (you have paid for the later, so if you decided to split -it up, you would not have additional planning fees). 18. Please label Prospect Road on the plans. 19. The orientation of the units and general configuration of the site plan is well done and shows good sensitivity to the surrounding residential lots. Planning Staff has questions though, about the amount of parking on the site and feels that this large amount of parking is cramping the setbacks, open landscaped areas, and landscaped buffers. 20. The trash enclosure should be relocated to the southeast corner of: the lot where it will be less visible from the road and the other homes. The two southern most parking spaces will be difficult to back out of in the configuration shown. If the eastern space is converted for the trash enclosure, it would allow an automobile exiting the western space to have sufficient room to back up before exiting the lot in forward. Staff would recommend moving the motorcycle parking spaces to another area (south end of parking lot?) and converting the area to landscaping. Staff would encourage more landscaping of the front yard area, to be more compatible with the neighborhood. 21. Staff would like to see the landscaped buffer area, on the east property line, increased to at least 7'or 81. This would then allow a 14-15' separation between the existing house to the east and a parked car in this lot. 22. Staff agrees that the fence needs to be broken up as you have indicated, rather than having it a solid wall which would only separate this use from the neighborhood rather than integrate it. The fence should not extend beyond the front corner of the existing house to the north to preserve the openness of the front yards. The privacy fence on the north property should extend to a point somewhere between the two trees. If you still wanted it to turn east at right angles for a short stretch for added privacy, that would be fine, but watch out that it doesn't cut up the open areas too much. 23. The privacy fence on the east property line should probably extend as far as any parking. It would be better to relocate the handicapped parking space and extend the landscaped area into than space. The fence could then be brought back about 15' which would help preserve the openness of the front yards on Blevins Court. 24. By now you have probably noticed that we have suggested that you eliminate 3 parking spaces to make room for buffer and landscaped areas. Making these changes will make it possible to address the absolute criteria #26, #27 and #28, which ask whether the site is organized in an efficient, functional, and cohesive manner; whether the elements of the site plan are arranged so that activities are integrated with the organization scheme of the neighborhood; and whether the design and elements of the site plan allows a favorable relationship between the buildings, open space, circulation, and landscaping. 26. The project meets the City requirements for parking, without the three spaces mentioned above. It may not meet the neighborhood concern or reality of each bedroom being occupied by an automobile owner and each unit having one guest every night. If this is the parking scenario that you anticipate, then it appears that a reduction in the number of units, or bedrooms is necessary. 27. Reflecting on the neighborhood's concerns about the density of this project, from a bedroom per lot perspective, the Planning Staff highly recommends that you consider a maximum of 6 bedrooms on this site. These 6 bedrooms could be in any kind of configuration, from 3- duplexes to 2- triplexes or even a one bedroom, a two bedroom and a three bedroom unit. With any of these configurations, you would only need to provide 9 parking spaces, using your anticipated parking scenario of one per bedroom plus one additional per unit. 28. From a neighborhood compatibility point of view, the people density of 6 bedrooms is much more in line with the existing character of the neighborhood, than it is with 9 bedrooms. 29. Additional landscaping should be added to soften and screen the east wall of the building; perhaps a few larger deciduous trees with some lower foundation shrubs would work there. 30. The other major issue on this project is the Residential Density :Point Chart. Staff does not have any problems with Criteria B, C, D, F, G, and J. Criteria E has not been justified with a letter from the school saying that the school does meet all of the requirements of the compulsory education laws of 'the State of Colorado. It is your responsibility to provide us with this information and certification, as we normally use only public schools for this criteria. We will not contact the school. Without certification, we cannot count the 10 points. 31. If you were to propose 2 units, you would need 70-80 points. Without criteria E the project achieves 95 points, thus meeting the Residential Density Chart. 32. Please provide information about the grocery store at the Choice Center Shopping Center if you choose to use points from Criteria A. Is it a full -line grocery? what is the square footage? What are hours of operation? Also include a list of what other shops and services are available in the center. 33. Does the! existing neighborhood have protective covenants recorded at the Court House? It would be a good idea to check this out, some single family neighborhoods have covenants which prohibit the use of a lot for any use other than single family houses. This concludes staff comments at this time. In order to stay on schedule for the November 18, 1991 Planning and Zoning Board hearing, please note the following deadlines: Plan revisions are due October 30, 1991 by 12:00 noon. PMT's, colored renderings, 10 prints are due Nov. 11, 1991. Final signed mylars and other documents are due Nov. 14, by 12:00 noon. If you have any questions about these comments or would like to schedule a time to meet to discuss them, please contact me at 221- 6750. sincerely, J j' Kirsten A. Whetstone Project Planner cc Kerrie Ashbeck David Knox Jeff Couch Janet Meisel Emily Smith- Prospect Shields Neighborhood Group Developm 11 Services Planning Department January 27, 1992 Robert K. Glover 2101 Lindenmeier Rd. Fort Collins, CO 80524 Dear Robert, City Staff has reviewed your re -submittal for the Blevins Court Lot 9 PUD and offers the following comments: 1. The City Water Utilities Department will install a 6-inch water main in Blevins Ct. next spring (Spring of 1992). The water service for lot 9 will be tapped to this main. Coordinate with Mark Taylor at 221-6681 on the timing of your water service. A building permit will not be granted until this utility construction is completed. 2. A sanitary sewer main exists along the southern boundary of this lot.. A 15-foot utility easement must be provided north of this Existing sewer main, measured from the center line of the main, 15 feet to the north. The sewer service for this lot will be tapped to this sewer main. Please coordinate with Kerrie Ashbeck at 221-6750 for information on how to record that utility easement. Since the lot is already platted, you would need to describe the easement and file a legal description of it as a separate document. Please provide this information to the Planning/Engineering Department and show the easement on the site plan and utility plans. 3. A final planting list describing the existing and proposed species and sizes of trees and shrubs should be shown on the final site/landscape plan. 4. Off -site flows are a major concern with this project. This type of in -fill project typically has potential to cut-off flows that have been routed to a vacant piece of land, especially in older developments where City standards for drainage control have not been met. The report is good for a preliminary report but lacks the final detail needed for final approval. Please see the redlined report and plans for detailed comments and return them to Glen Schlueter with revisions. If you have questions about the drainage report please contact Glen at 221-6589. 5. An erosion control plan for construction should be submitted with the final drainage plan. 28l North Colle,,e Avenue • I'.O. Bpi-\ :;80 • Fort Collins, CO 8052240580 • (303) 221-h ;0 6 . Planning Staf f has concerns about the amount of parking on the site and feels that the amount of parking that seems to be required, from the neighborhood perspective, is cramping the site, setbacks, open landscaped areas, and landscaped buffers. The parking situation seems to be a symptom of the density. 7. The grass-crete areas are a definite help in keeping the amount of hard surface to a minimum, but Staff believes that it would be difficult to enforce that area as overflow parking given the proximity to the front doors. Maintenance would likely be an on -going problem. Staff would recommend moving the turfstone area to replace the three northern most parking spaces on the east side of the property where they would be less heavily used. Six spaces would more than meet the City requirements for a duplex. 8. A motorcycle space is called out in the notes but not on the site plan. Staff would recommend that you provide a motorcycle space so potential motorcycle owners don't take up a regular size parking space. Perhaps north of the trash enclosure would be a good location. City Code requires that parking lots with 6 or more spaces provide motorcycle parking. 9. A handicapped space is also called out in the notes but not shown on the site plan. By Code, handicapped spaces are not required for parking lots with fewer than 15 spaces. If you plan to design a space to meet the dimensions of a H/C space but don't. plan to stripe it you would not have to indicate the space as H/C. You could provide a note on the site plan indicating that the space is sized as such. 10. Staff agrees that the fence needs to be broken up as you have indicated, rather than having it a solid wall which would only separate this use from the neighborhood rather than integrate it. There has been some concern from the neighbors to the south that the fence should continue across the south property line to provide privacy both for the back yards of houses on Prospect and for the residents of lot 9 on Blevins Court. The Planning Staff agrees that the south property line should be a continuous fence from the southwest corner to the trash enclosure. However, the other openings make sense. 10. Reflecting on the Planning and Zoning Board's and Prospect Shields Neighborhood Group's concerns about the density of this project, from a bedroom per lot perspective, the Planning Staff recommends that you consider a maximum of 6 bedrooms on this site. City parking requirements would be in the range of 4 to 6 spaces for most configurations of 6 bedrooms. 11. From a neighborhood compatibility point of view, the people density of a duplex is much more in line with the existing character of the neighborhood. Planning Staff feels that, at this time, they would be unable to recommend approval of a tri-plex. The feeling is that a duplex would be more in line Develop, �nt Services Plannini; Department Citv of Fort Collins March 19, 1992 Kint Glover 2101 Lindenmeier Road Fort Collins, CO 80524 Dear Mr. Glover, City Staff has reviewed your submittal for Blevins Subdivision Lot 9 PUD- Final and offers the following written comments: 1. The added architectural elements are a big improvement, they really do add interest. Please include architectural elevations for the south and west elevations. 2. The north elevation shows some upright evergreen landscaping which the landscape plan does not show. Some upright or vertical vegetation would provide color, texture, and softness to the broad side of the north elevation. 3. Staff recommends additional foundation plantings on the west and south sides of the building as well. 4. Will there be a privacy fence, or portion of fence or screen between the two units in the back? Will there be a patio area or deck? If so, these should be shown on the site plan and should be included in the building envelope. One of the All Development criteria of the Land Development Guidance System is for provision of outdoor privacy areas for residential units. Patios with a partial fence or landscaped hedge (such as a lilac hedge) separating them, would address the criteria. 5. Please indicate on the plan, the turf areas and list the seed mixture (or sod) that is proposed. 6. Will the bicycle area be paved? 7. Include a fence detail or description on the site plan. 8. Add a line for the Secretary of the Planning and Zoning Board signature, just above the "Owner's Certification". 9. Delete reference to the optional compact parking space. 10. Any installation of natural gas services must be done prior to the re -paving of Blevins Court. 11. Locate both gas meters on the north wall of the duplex. ?�I �. C��IIr��;� A\enue l'.O. B��� DSO • Iort Collins, CO S052 -0580 (�U�) 2�1-fbi:�() 12. Minor information and changes are needed to the Utility Plans. Redlined plans have been sent to Parson's and Associates. 13. Please refer to the comments on the Utility Plans for Water and Wastewater comments. 14. Please refer to the redlined Drainage Plans for Stormwater's comments. This concludes staff comments at this time. In order to stay on schedule for the April 27, 1992 Planning and Zoning Board hearing, please note the following deadlines: Plan revisions are due April 1, 1992 by 12:00 noon (no joke!) PMT1s, colored renderings, and 10 prints are due April 20th. Final mylars and other documents are due April 23rd by 12:00. If you have any questions about these comments or would like to schedule a time to meet to discuss them, please contact me at 221- 6750. Sincerely, 44- )AVW--Al Kirsten Whetstone Project Planner cc: David Knox, Architect Glen Schlueter, Stormwater Kerrie Ashbeck, Engineering file