HomeMy WebLinkAboutBIG HORN VILLAGE II - Filed DCP-DEV. CONSTRUCTION PERMIT - 2003-05-28DEVELOPMENT CONSTRUCTION PERMIT
Permit Number:t, — Issuance Date: ,� v
Project Name: Big Horn Village II
Project A. KA.:
Project Location: City Park Ave, 1/2 block south of University Ave
Permittee: Thomas Crow
City and developer contacts: See attached Exhibit "A" for names and phone numbers of all
contact persons for this project.
Fees: Permit Application Fee (paid at the time of application) $ 300.00
Construction Inspection Fee (paid prior to issuance of this permit) $ 6359.20
Total $ 6659.20
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
$ 163,090.21
Form of security deposited with the City:
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design
drawings and specifications the certification of all materials testing by an Engineer. The Permittee
shall have an Engineer prepare revised design drawings and secure City approval for all revisions
to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as
required by the City in the Development Agreement, that the improvements are constructed in
conformance with the approved Utility Plans and the standards and specifications of the City. The
Permittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance
of the constructed public improvements. (All references above to the terms "Project Engineer" and
"Engineer" shall mean a Professional Engineer licensed in Colorado.)
2. All contractors who perform work on this project must be bonded and licensed in conformance
with City requirements.
Permittee (Person who is to sign the Development Construction Permit):
Individual Name: '1-" C k AS C Cr! ct cc-;
Company Name: z S T,4 u'; M t_ Art- — C i �'Z Es 7-
Address: _ P , C o x 2- -12- l_ "1 Z � O_N -2 7
Phone number(s):
Office: el I U
Cellphone: e( 7 U 1 .-
Fax number: I? 70 �2C 7 1
Email:
Project Engineer (A Colorado licensed professional engineer who is the civil engineer, the person,
responsible for the design of this project, responsible for certification that improvements are constructed
in accordance with approved plans, responsible for making revisions to plans with City approval and for
providing as -constructed plans):
Individual Name: -► t'V k US L c�C� �i �4 ✓��
Company Name : I--vc °1 it; L A,',S v(_ . rty E-S N L ;
Address: _ k to 3 S, 6_G, L L E 6 E- A Lr o
Phone number(s):
Office: 3.1 1�0 3
Cellphone: 1 Y L4 014 2—
Fax number: yq Sq `7 3 S
Email:
Professional License Number: I C( I c( 1
Architect/Planner (The person responsible for the site design of this project)
Individual Name:0 n1 A (- C r F L E'
Company Name: (ZF-S t G � &.yt=- L-c 0A\E(\tTF C
Address: �Z� Z7 �'Dt x%�i�V �— Rc� . Srt'i �S
Phone number(s): _
Office: G c� Y.S
Cellphone: �-) 2 70 ( Lf 2-
Fax number: 2 �5 Z "1 ( Z 3
Email:
Developer (The party or parties referenced in the Development Agreement who are responsible for the
Developer's obligations contained in the Agreement —add additional names below):
Individual Name: T 1y •'-k � 4~12.Cc.�
s
Company Name : 1A < < c ter_ C__$ I 1
c,:
Address: P, (—` 1� k 7 Z Z 7 L-
Phone number(s):
Office: Lj 7C _SC>
Cellphone: 7C ,Z I_9�)_! C'
Fax number: C1 70 ,Zr✓ 7 fr &(_3
Emai I:
L);
General Contractor (The contractor in overall charge of the public infrastructure construction):
Individual Name: E E L 6k1 Dow
Company Name : c:xcR-A �- ►V
Address: _ 1.3 \ S S �1 w\. / I E w fl fZ
Phone number(s):
Office: 4 `{ tea Si j
Cellphone:
Fax number:
Emai I:
If you have no General Contractor, list all other contractors below
Grading contractor:
Individual Name:
Company Name : t
Address:
Phone number(s):
Office:
Cellphone:
Fax number:
Email:
Utility contractor:
Individual Name:
Company Name:
Address: _
Phone number(s):
Office:
Cellphone:
Fax number:
Email:
Concrete contractor for flat work:
Individual Name: Wit, `� E t-A mil? T
Company Name: E Ll E K-T- -c-U e'l S ► ,
Address: _ Cl 33 CA -
Phone number(s):
Office: L4 .Z �15
Cellphone: 0 lc, 0q
Fax number: q .2-
Emai I:
Concrete contractor for structures:
Individual Name:
Company Name:
Address: _
Phone number(s):
Office:
Cellphone:
Fax number:
Email:
Paving contractor: L� S G E
Individual Name:
Company Name : L}Al a I F7 L-L ES 01--t L
Address: t7P tfr-f 2 �vt G ry is
Phone number(s):
Office:
Cellphone:
Fax number: 2 z 3 i c( j
Emai I:
Landscape contractor:
Individual Name: C-;H+\- b
ST' R
Company Name: CD S'T�-R
L-A N -D -Sc A PC
Address: — 2 Sv.J D,A
( I AS �(Z mot✓ l� C'T ,
Phone number(s):
Office: `16 -7
SL-� `i ,
Cellphone:
Z Zl (,
Fax number: �� (�
70 (<
Email:
Other contractors and parties involved in the project:
SUBMIT THE FOLLOWING ITEMS (Required for all projects):
• 81 /2"x 1 I" copy of the Site Plan
Proposed Project Schedule
Project quantities and cost estimate for all of the public improvements to be constructed. In
addition, include all private improvements that are required to be inspected by the City
Construction Inspectors. This information must be submitted in the format shown on the
attached form titled "Project Quantities and Cost Estimate Sheet."
ADDITIONAL SUBMITTALS (Required if checked):
❑ Traffic control plan(s) for the project
❑ Proposed haul routes shown on a City map
❑ Shop drawings
❑ Other
CONSTRUCTION COORDINATION MEETING: A construction coordination meeting to discuss
plans and special requirements for your project, is required for all development projects. The people
required to attend the meeting are the Project Manager, Project Engineer, Developer, Architect/Land
Planner and General Contractor (if no General Contractor, representatives for each of the contractors
expected to work on this project)
People to Attend: List the peoples names and titles for those who will attend the pre -
construction meeting:
Name
Title
ESTIMATED COST OF INFRASTRUCTURE IMPROVEMENTS: Provide the estimated value of
all public infrastructure improvements that will be constructed and accepted by the City to own and
maintain. In addition provide the value of all private infrastructure improvements that the City will
inspect and require certification for. The estimate shall be in the same format as the attached sheet titled
"Project Quantities and Cost Estimate Sheet."
( Q ZI
Public infrastructure, estimated cost: $ 6 3 , 09 6,
Private infrastructure, estimated cost:
1 certify that the information on this permit application along with the required additional submittals are
true and correct to the best of my knowledge, and that in filing this application I am acting with the
knowledge, consent, and authority of the owners of the property (including all owners having legal or
equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common
areas legally connected to or associated with the property which is the subject of this application) without
whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said
authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if
necessary, to enter upon such property to perform work required of the applicant if the applicant were to
fail to perform the required work.
Applicant Signature: _ ?�/J �4��Date: ( —.Z 9 --C).2_
PROJECT QUANTITIES AND COST ESTIMATE SHEET
Big Horn Village II, PDP
Description:
Installation of public sanitary sewer, water service, street improvements
Description:
Units of
Measure
I Estimatedl
I Quantity
Insp. Cost
I per unit
Const.
I costlunit
Total est.
Cost
linspectionj
Fee/unit
Total
I Insp. Fee
Storm Sewer
18" RCP Cl III w/ 3/4" Rock
LF
604
$ 60.00
$ 45.25
$ 27,331.00
$ 0.60
$ 362.40
15" RCP Cl III w 3/4" Rock
LF
25
$ -
$ 44.25
$ 1,106.25
$ 0.60
$ 15.00
Trench,
LF
629
$ 60.00
na
$ -
$ 0.60
$ 377.40
Connection to exist. Type R Inlet
ea
1
$ 90.00
$ 985.00
$ 985.00
$ -
$ 90.00
4' Dia Manhole
ea
3
$ 90.00
$1,255.00
$ 3,765.00
$ -
$ 270.00
Subtotal
zP JJ, 10l .LU .p , � ,-
8" SDR-35 Main w 3/4" rock
LF
890
$ 60.00
$ 31.25
$ 27,812.50
$ 0.60
$ 534.00
Connect to exist. Main.
ea
1
$ 60.00
$1,965.00
$ 1,965.00
$ -
$ 60.00
4' Dia. Manhole
ea
4
$ 90.00
$1,255.00
$ 5,020.00
$ -
$ 360.00
8" x 6" service connection
ea
5
$ 60.00
$ 65.00
$ 325.00
$ 0.60
$ 300.00
6" SDR service
ea
5
$ 60.00
$1,045.00
$ 5,225.00
$ 0.60
$ 300.00
Trench
LF
890
$ 60.00
$ -
$ -
$ 0.60
$ 534.00
y 4U,J4/.�U .y L,VVV.VV
8" CL-52 w/ sand bedding
LF
1102
$ 60.00
$ 28.25
$ 31,131.50
$ 0.60
$ 661.20
Tapping saddle, 8"
ea
1
$ 60.00
$2,965.00
$ 2,965.00
$ -
$ 60.00
Tapping saddle, 6"
ea
1
$ 60.00
$2,485.00
$ 2,485.00
$
$ 60.00
Fire Hydrant
ea
3
$ 60.00
$2,115.00
$ 6,345.00
$
$ 180.00
6" DIP Hydrant run
LF
4&
$ 60.00
$ 24.25
$ 1,164.00
$ 0.60
$ 28-80
Valves
ea
3
$ 60.00
$ 700.00
$ 2,100.00
$ -
$ 180.00
Bend, Tee, Cross Fittings
ea
8
$ 30.00
$ 321.87
$ 2,574.96
$
$ 240.00
Meter pit
ea
1
$ 30.00
$ 345.00
$ 345.00
$
$ 30.00
1-1/2" Meter Pit w/yoke
ea
5
$ 30.00
$1,850.00
$ 9,250.00
$
$ 150.00
Trench
LF
1150
$ 60.00
$ -
$ -
$ 0.60
$ 690.90
8" x 1-1/2" service connection
I ea
5
1 $ 60.00
$ 405.00
1 $ 2,025.00
$
$ 300.00
Subtotal
Street System
remove curb/sidewalk Is 1 $ 60.00 $
remove/replace Ashpalt ton 160 $ 90.00 $
Replace sidewalk I SF 780 $ 60.00 $
zo 0u")0D.40
130.00 $ 20,800.00 $
10.00 $ 7,800.00 $
$ 29,170.00
Totals: $163,090.21
.� L, JOU. VU
0.60 $ 60.00
0.30 $ 90.00
0.80 $ 604.00
$ 754.00
$6;53B80
PROJECT QUANTITIES AND COST ESTIMATE SHEET
Big Horn Village II, PDP
Description:
Installation of public sanitary sewer, water service, street improvements
Description:
Units of
Measure
Estimated
Quantity
Insp. Cost
per unit
Const.
costlunit
Total est.
Cost
Inspectio
Fee/unit
Total
Insp. Fee
Storm Sewer
18" RCP Cl III w/ 3/4" Rock
LF
604
$ 60.00
$ 45.25
$ 27,331.00
$ 0.60
$ 362.40
15" RCP CI III w 3/4" Rock
LF
25
$ -
$ 44.25
$ 1,106.25
$ 0.60
$ 15.00
Trench,
LF
629
$ 60.00
na
$ -
$ 0.60
$ 377.40
Connection to exist. Type R Inlet
ea
1
$ 90.00
$ 985.00
$ 985.00
$ -
$ 90.00
4' Dia Manhole
ea
3
$ 90.00
$ 1,255.00
$ 3,765.00
$ -
$ 270.00
Subtotal
8" SDR-35 Main w 3/4" rock
LF
890
$ 60.00
$
31.25
$
27,812.50
$ 0.60
$
534.00
Connect to exist. Main.
ea
1
$ 60.00
$
1,965.00
$
1,965.00
$ -
$
60.00
4' Dia. Manhole
ea
4
$ 90.00
$
1,255.00
$
5,020.00
$ -
$
360.00
8" x 6" service connection
ea
5
$ 60.00
$
65.00
$
325,00
$ 0.60
$
300.00
6" SDR service
ea
5
$ 60.00
$
1,045.00
$
5,225.00
$ 0.60
$
300.00
Trench
LF
890
$ 60.00
$
-
$
-
$ 0.60
$
534.00
8" CL-52 wl sand bedding
LF
1102
$ 60.00
$ 28.25
$ 31,131.50
$ 0.60
$ 661.20
Tapping saddle, 8"
ea
1
$ 60.00
$ 2,965.00
$ 2.965.00
$ -
$ 60.00
Tapping saddle, 6"
ea
1
$ 60.00
$ 2,485.00
$ 2,485.00
$
$ 60.00
Fire Hydrant
ea
3
$ 60.00
$ 2,115.00
$ 6.345.00
$
$ 180.00
Valves
ea
3
$ 60.00
$ 700.00
$ 2,100.00
$
$ 180.00
Bend, Tee, Cross Fittings
ea
8
$ 30.00
$ 321.87
$ 2,574.96
$
$ 240.00
Meter pit
ea
1
$ 60.00
$ 345.00
$ 345.00
$
$ 60.00
1-1/2" Meter Pit w/yoke
ea
5
$ 60.00
$ 1,850.00
$ 9,250.00
$
$ 300.00
Trench
LF
1 1102
1 $ 60.00
$ -
$
$ 0.60
$ 661.20
Subtotal
Street System
remove curb/sidewalk
Is
1
$ 60.00
$
570.00
$
570.00
$ 0,60 $
60.00
remove/replace Ashpalt
ton
160
$ 90.00
$
130.00
$
20,800.00
$ 0.30 $
90.00
Replace sidewalk
SF
780
$ 60.00
$
10.00
$
7,800.00
$ 0.80 $
604.00
$
29,170.00
$
754.00
Totals: $ 159,901.21 $ 6,359.20
Development Construction Permit, Page 2/6
3. Construction time restrictions:
4. The applicant understands that additional permits may be required for this development project
and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic
study, drainage report, plat easements and any other official documents), shall be kept on the
development site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations
or Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the permit fee paid for this
permit, whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration date.
Such application shall contain information sufficient to justify the granting of the extension.
An extension may be granted for up to six months.
7. Building permits .and certificates of occupancy will only be issued when all conditions contained
in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29-
678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the
Development Agreement does not specify times for completion of public improvements, or if there
is no Development Agreement, then the improvement requirements specified in Section 24-95 of the
City Code shall apply, which provides that construction of all improvements shall be required prior
to the time of issuance of the first building permit.
8. Acceptance by the City of the public improvements shall be after (1) final inspection has been
conducted by the City; (2) punch list items from the final inspection are completed and accepted by
the City, and (3) required certifications from the licensed professional engineer that improvements
arc completed to City standards, specifications and approved Utility Plans; and the "as -constructed"
plans have been received and accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance by the City
of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional
Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use
Code, as applicable.
10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any
Development Construction Permit, Page 3/6
planned construction on this project. All required perimeter silt fencing and other erosion/sediment
control best management practices (BMP's) that can be installed prior to construction must be in
place and inspected by the City Erosion Control Inspector before any land disturbing activity begins.
11. No work (including grading) shall be started in State Highway right-of-way until a permit is
issued by the Colorado Department of Transportation to allow such work to begin.
12. Other conditions:
Permittee's acknowledgment signature:
By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of
the owners of the property (including all owners having legal or equitable interest in the real property,
as defined in Section 1-2 of the City Code; and including common areas legally connected to or
associated with the property which is the subject of this application) without whose consent and authority
the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City
officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such
property to perform work required of the applicant if the applicant were to fail to perform the required
work. I also acknowledge that I have read this permit document with all its requirements and
conditions, and I agree to all of the terms and conditions so stated in this permit.
Applicant/Project Manager's Signature: Date: 2_--4'
Approval for issuance:
City Engineer Approval: '�'�� Date: �z -
(Permit Issuance Date)
Development Construction Permit, Page 5/6
Forestry: Tim Buchanan
215 N. Mason St, Ft Collins, CO
970 221-6641
Light and Power: Doug Martine
700 Wood Street, Ft Collins, CO 80521
970 224-6152
Developer' Contact Persons:
Project Manager/Owner:
Thomas Crow
T&S Investments, LLC
PO Box 272272
Fort Collins, CO 80527
Office: 970 225 0388
Cell: 970 215 2991
Fax: 970 207 1860
Developer: Thomas Crow
Valley Crest Homes
PO Box 272272
Fort Collins, CO 80527
Office: 970 225 0388
Cell: 970 215 2991
Fax: 970 207 1860
Architect/Planner: Donald Leffler
Design Development Consultants
2627 Redwing Rd, St. 350
Fort Collins, CO
Office 226 0585
Cell: 227 0142
Fax: 282 7123
Project Engineer: James Loonan
Loonan and Associates, Inc.
1630 S. College Ave.
Fort Collins, CO
Office: 493 2808
Development Construction Permit, Page 4/6
EXHIBIT "A"
DEVELOPMENT PROJECT CONTACT PERSONS
Project Name: Big Horn Village II
City Staff Contact Persons:
Development Engineer:
Construction Inspector:
Current Planner:
Katie Moore, 281 N. College Ave., Fort Collins, CO
80522 (970) 221-6605
Joe Crabill, 281 N. College Ave., 221-6605
Bob Barkeen, 281 N. College Ave., 221-6750
Water Utilities Engineer: Roger Buffington
700 Wood Street, Ft Collins, CO 80521
970 221-6854
Stormwater Utilities Engineer: Glen Schlueter
700 Wood Street, Ft Collins, CO 80521
970 221-6065
Erosion Control Inspector: Bob Zackley
700 Wood Street, Ft Collins, CO 80521
970 224-6063
Natural Resources: Doug Moore 281 N. College Ave, 221-6750
Traffic Operations: Eric Bracke
625 Ninth Street, Ft Collins, CO 80524
970 224-6062
Street closures: Syl Mireles
625 Ninth Street, Ft Collins, CO 80524
970 224-6815
Transportation Planning: Kathleen Reavis
215 N. Mason St, Ft Collins, CO
970 224-6104
General Contractor:
Development Construction Permit, Page 6/6
Cell: 218 4042
Fax: 495 9735
Neeley Amidon
JB Excavating, Inc.
1316 S. Summitview Dr.
Office: 484 6593
Cell: 567 1601
Fax: 490 6115
Concrete contractor for flat work:
Jose Fuerte
Fuerte Construction
1933 Summit Ct
Fort Collins, Co
Office: 482 8506
Cell: 567 0901
Fax: 482 8506
Paving Contractor:
Landscape Contractor:
Trace Musgrave
Connell Resources
4305 E. Harmony Rd.
Fort Collins, CO
Office: 2233151
Fax:2233191
Chad Oster
Oster Landscape
2502 Dallas Creek Ct.
Office: 567 5296
Cell: 567 2216
Fax: 686 7061
February 6, 2002
City of Fort Collins
300 LaPorte Avenue
Fort Collins, CO 80521
Dear Sirs:
NEW FRONTIER BANK
We hereby establish, at the request and for the account of Valley Crest Homes, Inc., in
your favor as hcneficiary, our Irrevocable Letter of Credit No. 218, in the amount of
One Hundred Sixtv Three Thousand Ninetv One Dollars and No1100 (S163,091.00),
as more fully described below, effective immediately and expiring at the close of banking
business on February 6, 2003, at our offico at 1130 Main Street, Windsor, Colorado.
80550.
This Letter of Credit is intended for the funding required for the Completion of
infrastructure at City Park Avenue ("Development Project") for the assurance of the
completion o C the construction and the maintenance and repair of the public infrastructure
in connection with the aforesaid development project and its associated development
agreement and development construction permit. Funds under this Letter of Credit are
available to you_ for one or more drawings prior to the close of business on February 6,
2003 against sight drafts in an aggregate cumulative amount no to exceed S163,091.00,
dated the date of presentment, drawn on our office referred to above, referring thereon to
the numher of this Letter of Credit and accompanied by your written certificate signed by
vo,i and acknowledged as therein provided in the form of Exhibit 1 hereto.
Presentation of such draft and certificate shall be made at our office referred to above.
Upon the earlier of (1) our honoring your draft(s) totaling $163,091.00 in the aggregate
presented on or before this Letter of Credit expires pursuant to the terms herein or (ii) the
surrender to us by you of this Letter of Credit for cancellation, this Letter of Credit shall
automatically tcruninate.
It is understood that the amount of this Letter of Credit may be reduced as public
improvements are constructed and accepted by the City. As components of the
infrastructure are satisfactorily completed in accordance with approved utility plans, the
value of the completed components may be established from the Development
Construction Pcnnit worksheet for determining costs of infrastructure construction and
inspect ion fees. whereupon the amount of this Letter of Credit may be reduced by the
value of the completed component(s), upon execution of a "Request for Amendment to
Letter of Credit" in the form attached hereto as Exhibit 2.
COPY
2425 35th Avenue 9 Greeley, Colorado 80634 • 970-339-5100 • Fax 970-339-5200
This letter of credit shall be subject to the Uniform Commercial Code as in effect in the
State of Colorado, and, to the extent not inconsistent with the terms of this Letter of
Credit and the Uniform Commercial Code, the Uniform Customs and Practice for
Documentary Credits, 1993 revision, ICC publication number 500.
This Letter of Credit will be automatically extend without amendments for one year from
the present, and each future, expiration date thereof, unless Issuer delivers written notice
at least sixty (60) days prior to anv such expiration date to the City of Fort Collins of its
intent not to renew this Letter of Credit. Any such notice shall be in writing and shall be
delivered with an acknowledged receipt, either in hand or by certified mail. Any
amendments to tl-iis Letter of Credit shall be made in the form of Exhibit 2 hereto.
The Citv may at anv time request that the Bank amend this Letter of Credit by submitting
to the Bank a fully executed certificate in the form of Exhibit 2. The bank may thereafter
promptly issue an amendment to the Letter of Credit corresponding to the change or
changes requested in such certificate.
This Letter of Credit is not transferable.
This Letter of Credit sets forth in full our undertaking, and such undertaking shall not in
any way be modified, amended, amplified or limited by reference to any document,
instrument or agreement referred to herein, except only the certificate and draft(s)
referred to herein; and any such reference shall not be deemed to incorporate herein by
reference anv document, instrument or agreement except for such certificate and draft(s).
Sincerely,
0
James R Rutz
,Senior Vice President
:Te:. Frontier Bank
1130 Main Street
Windsor, CO 80550
970-674-9080
DEVELOPMENT CONSTRUCTION PERMIT
APPLICATION
(2/ 16/99)
For City use only: Application Number: h,% � pplication Date:
Permit application fee: $ 300.00
INSTRUCTIONS:
l . Complete this form (some questions may not apply to you) and attach all necessary documents and
submit to the Development Engineering Section of the City.
2. If you have any questions contact Development Engineer Katie Moore at 221-6750.
3. Submit the Application and pay the Application Fee at the fee at the Engineering counter at 281 No.
College Avenue.
PROJECT INFORMATION:
Project Name (as approved by the City):
Project A.K.A. (Marketing name if different from Project Name):
i
Project Location: iT�r ��IA 12 (< V' t-
l A
t v E-2 C_, t`St.i f-1 V
Property Owner(At the time of this permit issuance):
Individual Name: -�+o e11 PS & ,
Company Name : T z' S :5+4 V t✓`4 -r-S
Address: _ 0 , l S c3 x 2- 7 L 2- L,
Phone number(s):
Office: c( 1O — j O _.�
Cellphone: c) 2.
Fax number: G 70 :IC 1 1 Y6 G
Emai I:
Applicant/Project Manager (The primary contact person for all matters regarding this project, and the
person responsible for all matters referencing "the Developer" in the Development Agreement for this
project):
Individual Name: Tt tc 'tip /ts t�G `
Company Name: i : A-t vC-5 i i t t C- vtkTS L C- C
Address: _; B C x 2- 7 Z Z 12- %
Phone number(s):
Office: (? 7C ,2-� c S,'J'
Cellphone: `f 7y
Fax number: y7C 2 1 1 CU
Email: