Loading...
HomeMy WebLinkAboutBEST BUY PUD - Filed GC-GENERAL CORRESPONDENCE - 2003-05-28PLANNING OBJECTIVES Best Buy P.U.D. is located on the hb zoned 2.73 acre parcel just north of Phar•-Mor on College Avenue. At this location, the P.U.D. allows convenient access from an existing right-in/right-out on College or from Troutman Parkway. This site provides an excellent link between Fountainhead P.U.D. on the North and Marketplace P.U.D. on the South by utilizing internal pedestrian and vehicular connections. A detached walk along College Avenue, planted with street trees also improves pedestrian circulation between retail sites. The location, setbacks, landscaping, and other characteristics of this P.U.D. will be similar to that of Market Place P.U.D. It will utilize a variety of shade trees and ornamentals in a semi -formal design, with generous ground cover. Best Buy will be provided with 179 parking spaces, with bicycle and handicap parking close to the front entry. The building will be approximately 27' high, with a parapet sign on the front as a focal point of entry to the store, with excellent visibility from College Ave. Best Buy P.U.D. will help "tie together" the existing P.U.D.'s to the North and South, while maintaining it's own identity. Construction is scheduled to begin in August 1992 and completed by December. FEE-11-'00 SAT 19!25 T^! 10%13/92 13:10 IFAY elk .96 2a16 TEL NO, BEST BUY R.E- tt201 P01 Z 002 Corporate Nwdgaartom 4490 Wat 781h Street P.O. Box 9312 MlnnUPD113. MN 9544M12 812JM-ZM NYSE Symbol; BOY October 6, 1992 Mr. Dean Yost state of Colomdo Colorado Department of Transportation Post Offloc BOX $50 Greeley, Colorado 8W32-WO Re: George Holter/Best Buy Access Permit Dent Dean: This letter is intended to explain the current status of the Best Buy site in Fort COMM, Colorado. The Best Buy project was originally to be developed by George Holter with the building and site improvements to be leased by Best Buy. A need for an access permit was identified to allow for the completion of a deceleration lane to State Highway 287. This permit was applied for by George Holter in July of 199L During tho approval process, the decision was made by Best Buy to purchase tbo property from George Holter and to become the site developer. As the site developer, Best Buy will be responsible for the con_stnlction of the improvements as identified by the construction plans approved by the City of Fort Collins and as defined an the approved State Highway Access Permit issued by the State of Colorado Dcparllucut of Transportation. As you requested the access permit will be signed by George Holter since he was the permitme on the original permit applicdtiun. The access permit will also be signed by Best Buy as the new owner of the property and developer of the $its improvements. I hopo this information clear6 up sny questions you may have on this project. please feel free to contact me should you have any additional questions. Manager CC George Holter, Holter Realty Kerrie Asbbecl, C,Sty of Fort Collins RECEIVED OCT 1 4 M Builders Inc. November 3, 1992 Mr. Scott Palmer Best Buy Co., Inc. P.O. Box 9312 Minneapolis, MN 55440-9312 Re: Best Buy Store 4040 S. College Ave. Fort Collins, CO Dear Scott: 2926 E. MULBERRY ST. P.O. Box 1969 FT. COLLINS, COLORADO 80522 PHONE 493-1770 This letter is in regard to the correspondence from Parsons & Associates dated November 2, 1992, a copy of which you FAXed to me this morning. Upon review of said letter, I have the following comments: 1. The spoil material was not located where indicated on Sheet 4 of 7 of Parsons drawings, because there would have been no room to stage the job during construction; because it very quickly became evident that the area shown was going to be too small for the quantity of spoil material actually removed from your site; and because conversations with Mr. Couch led me to believe that this area would most probably be included in the future permanent built-up area on Mr. Petersen's site. 2. Mr. Petersen requested a grading plan from Mr. Couch in early September. Mr. Petersen received a very simple sketched plan on October 29, 1992 and I met with Mr. Petersen that morning to discuss how he wanted to proceed. Mr. Petersen did not feel that placing a pad at a final elevation of 5036' was appropriate as the Best Buy finish floor elevation is at 5033'. He therefore requested that I prepare an estimate to place a compacted pad at a maximum elevation of 5032.5', which I am in the process of doing at this time. 3. 1 spoke to Mr. Paul Hoffman on October 22, 1992 and told him that I understood his concerns regarding the project the Neenan Co. is doing for First Interstate and that we were waiting for a grading plan to be submitted to Mr. Petersen before we moved any material as Mr. Petersen was not interested in paying to have materials moved twice. Mr. Hoffman said he would contact Parsons & Associates. 4. 1 spoke to Mr. Glen Schlueter at the City of Fort Collins Stormwater Utility this morning and assured him that we are working to resolve this issue. He will grant a conditional Certificate of Occupancy for Best Buy. General Contractors — Construction Managers Commercial and Industrial `Since 1973 " 5. 1 have been working on having most of the spoil material removed from the site as the opportunity has presented itself and have found a contractor that can use almost all that is presently stored. They were scheduled to begin removal and trucking operations on November 2, 1992, but the snow fall that started early in the morning precluded this. Should they be able to begin removal this week the whole issue will become a moot point very soon. 6. It is not up to Best Buy to resolve this issue. 7. We will handle the coordination of the disposition of the stockpiled spoils materials with Mr. Petersen, the Neenan Co. and the other pertinent interested parties. Please do not hesitate to contact me should you have any further questions in this regard. Sincerely, 6A- live Sinnett Builders, Inc. Ted Beers enc: grading plan, Petersen Site, 10/29/92 cc: Mr. Jim Petersen Glen Schlueter, City of Ft. Collins Stormwater Utility Mike Hertzig, City of Ft. Collins Engineering Paul Hoffman, The Neenan Co. Jay Williams, Sinnett Builders Mr. Jeffrey Couch, Parsons & Associates TB/be