HomeMy WebLinkAboutATRIX LABORATORIES - Filed CS-COMMENT SHEETS - 2003-05-27June 17, 1998 Mike Ludwig Planning Department 281 North College Avenue Fort Collins, CO 80524 Re: Response to staff comments: Atriz Laboratories Building B Dear Mike, We have reviewed staff comments dated May 21, 1998, and have the following comments: 1. A note has been added to the landscape plan calling for the review and approval by the City of Fort Collins of any landscape irrigation system, prior to the issuance of a building permit. 2. a. Ok. b. Ok. C. Ok. 3. a. The building will be fire sprinklered. b. Ok. C. The building will be fire sprinklered. d. Ok. e. Ok. 4. a. Ramps have been added to each handicap accessible space. b. An additional bike rack has been placed near the front entrance of the building, just off the parking lot. C. Ramps have been added to each handicap accessible space. d. The access area to the trash dumpster and transformer location has been increased to 15' width. e. A note has been added to the landscape plan regarding a separate permit for the irrigation system. f. The mechanical equipment, which is located on the rooftop of the building, has been reduced to an enclosure that is 26' x 28' or 728 square feet. With the total square feet of the enclosure and the total third floor square feet, the rooftop equipment covers less than 5% of the allowed horizontal surface per section 3.8.17[C] of the Land Use Code. g. Building envelope dimensions have been added to the site plan. h. Wall signs have been indicated on the building elevations. i. A 5' landscaping buffer has been added along the south property line. VF RIPLEY ASSOCIATES INC. Landscape :lrchitecture Crban Desi�:n Hannine I11' Stone% Hill Drive Fort Col!ins. Colorado S0�'_= PHONE,'; 0) _24-�S_S FA.0 —4-I6n_ b. Please revise the building square footage data as noted on the redlined Site Plan. C. Please move the "Not a part of this submittal" note to beneath the words proposed addition. d. The symbol and information regarding the Colorado Blue Spruce trees was eliminated from the Plant List. Please add this information back to the Plant List as these evergreen trees are still shown on the Landscape Plan. e. The lighting isometric lines don't appear to match the lighting grid information provided. Please revise the 24" x 36" IiglZting plan to delete the lighting isometric lines and add the lighting grid information. 3. Comments and redlined utility plans from the Engineering Department are attached. Please return all redlined documents with plan revisions. 4. Comments and redlined utility plans from the Stormwater Utility are attached. Please return all redlined documents with plan revisions. 5. Comments and redlined utility plans from the Water and Wastewater Utility are attached. Please return all redlined documents with plan revisions. This completes the review comments at this time. Additional comments may be forthcoming as the various departments and reviewing agencies continue to review this request. Please contact the Current Planning Department for the required number of plan revisions prior to revision submittal. Please provide a written response to each of the above stated comments. An administrative hearing date will be assigned once all comments have been addressed and revisions have been reviewed. Please contact me at 221-6206 if you have any questions or concerns related to these comments. Sincerely, *.,M- - Michael Ludwig, AICP City Planner xc: Sheri Wamhoff Stormwater Utility Current Planning File #53-85AT Commuf_..,y Planning and Environmental Services Current Planning City of Fort Collins August 27, 1998 Linda Ripley V-F Ripley Associates, Inc. 1113 Stoney Hill Drive Fort Collins, CO 80525 Dear Linda, Staff has reviewed your revisions for the Atrix Laboratories Building B, PDP, that were submitted on July 30, 1998 and would like to offer the following comments: 1. The Current Planning Department offers the following comments: a. The plat needs to dedicate Worthington Avenue as right -of-way. The right- of-way widths for Worthington Avenue and Centre Avenue need to be labeled on the Plat. b. Please include the Atrix Laboratories Building A property with the replat so that drainage easements can be vacated and rededicated for the expanded detention pond. Then the future expansion for Building A can be processed as a Minor Amendment without any time delays associated with an easement vacation being heard by the Planning and Zoning Board. C. The applicant proposes to enlarge and regrade the existing detention pond and install a retaining wall. It appears that these improvements will impact existing trees on Lot 1 of the C.A.T. 8th Filing. Please identify the caliper and species of all existing trees and indicate whether they are to remain or be removed. Staff will need to evaluate the removal of any trees. d. Please revise the legal description on the Site Plan by adding: "Being a replat of ....." at the beginning of the description. e. Redlined sets of the Plat and PUD plans are attached. Please return all redlined documents to Current Planning with plan revisions. 2. The Zoning Department requests that trash enclosure be labeled on the building elevations. The enclosure needs to be gated. 281 North Colle -e Avenue - P.O. Box 580 - Fort Collins, CO 80522-0580 - (970) 221-6750 - FAX (970) 416-2020 3. The Building Inspections Department and the Poudre Fire Authority re -stated their comments from the May 21, 1998 revision comment letter. 4. Comments and redlined utility plans from the Engineering Department are attached. Please return all redlined documents with plan revisions. 5. Comments and redlined utility plans from the Stormwater Utility are attached. Please return all redlined documents with plan revisions. 6. Comments and redlined utility plans from the Water and Wastewater Utility are attached. Please return all redlined documents with plan revisions. This completes the review comments at this time. Additional comments may be forthcoming as the various departments and reviewing agencies continue to review this request. Please contact the Current Planning Department for the required number of plan revisions prior to revision submittal. Please provide a written response to each of the above stated comments. An administrative hearing date will be assigned once all comments have been addressed and revisions have been reviewed. Please contact me at 221-6206 if you have any questions or concerns related to these comments. Sincerely, Michael Ludwig, AICP City Planner xc: Sheri Wamhoff Stormwater Utility Current Planning File #53-85AT February 25, 2002 Mr. Steve Olt Fort Collins Planning Department 281 North College Ave Fort Collins, CO 80521 RE: Revisions / Clarifications to Staff Comments for the C.A.T. 8ch Filing Replat, Atrix Labs PDP, Type II (LUC) Dear Mr. Olt: Following are responses and clarifications to the Staff Comments for the Atrix Project Development Plan. The responses are numbered as they appear in the comment package, dated 1/16/2002. Excel Energy: To the best of our knowledge, all issues have been resolved with Len Hilderbrand. This comment was inadvertently put on this set of comments. We called Len and he said that the comment had already been addressed with the previous submittal. Engineering Department — Matt Baker: Acknowledged. Police: That emergency exit door no longer exists along the west side of the addition. There is an emergency exit on the south side of the addition, with a walk that goes out to the parking lot. The walk goes right past the enclosure for the coolers. We have placed two evergreen trees there to help screen that area. We anticipate that these evergreen trees won't obscure the emergency exit. Traffic Operations: Acknowledged. New Mercer Ditch Company: Acknowledged. Technical Services Department: 1. Noted on the plat. 2. Corrected to be a replat of a replat. 3. Subdivisions have been added. 4. Corrected. There are only 2 sheets in the plat. Engineering — Sheri Wamhoff: General: 57 Signature will be provided on the final mylars. 71 The sidewalk has been widenend. The 15- foot dimension was a mistake — the parking stalls were 17 feet deep. 72 The future bus pad has been shifted to the east. 81 We are working on obtaining a Letter of Intent from the ditch company. 82 Hopefully, the City has received a Letter of Intent from the Everitt Companies. 83 The Site Plan shows the off -site extent of construction for the sidewalk. Plat: 23 Easement to be recorded as a separate document and will be done at Final Compliance. 25 The emergency access easement has been added to the Plat. 75 Transportation Easement has been added. 76 Radius on the corner has been added. 77 No, it is not. 78 Plat has been revised to show every thing as a drainage, utility and access easement except the building envelopes, New Mercer Ditch easementand the utility easement on the northern and western edges of the property. Site Plan: 11 The existing curb, gutter, etc. has been shown in a shaded gray tone on the site plan. We have also added labels to help clarify what is being removed. 79 All sidewalks in front of parking stalls are 6 feet wide and have been labeled. Utility Plans: 14 Indemnification statement provided. 15 All applicable construction notes provided on cover and drainage plan. 73 Easement provided. 74 Signing and striping plan revised. P FA: 94 Address numerals will comply with requirements. 92 The requested 30- foot fire lane has been provided. In addition, a fire lane easement has been designated on the Plat. 95 The three-story building will be fire sprinklered. 96 The hazardous materials issue is currently being worked out between Atrix representatives and PFA. 93 Hydrant moved. Police: See above response regarding landscaping concerns. Stormwater Utility: All items on the drainage plan, grading plan, erosion control plan and drainage report have been addressed by JR Engineering. Drainage Reports and Mylars: 90 Two signed and stamped drainage reports to be submitted. Ditch Compaq Signature: 88 Acknowledged. Not sure which tree Basil is talking about, but we can show it to be removed, if necessary. Minimum 0 leninq Elevation: 91 Building MOE changed. Transportation Planning: 30 Redlines have been addressed. 84 Walk has been widened to 8 feet as requested. 85 The stripling on the west side has been added. 86 We have removed the enhanced pedestrian crosswalks from those areas. 87 Access ramps have been added. Water / Wastewater: 67 Invert of 8" sewer main matched to crown of existing 21" sewer and labeled. 68 Ten feet of separation maintained. Water service to addition provided through existing building. 69 Gas and electric are shown on the utility plan. 70 Standard sanitary sewer service detail included. Storm sewer joint encasement also provided instead of total pipe encasement when crossing water line. Zoning: 5 The landscape plan now has plant label with symbols indicating species. Sorry about the confusion. 6 We have added additional trees in the landscape islands. 7 The existing Atrix building has two handicapped parking spaces in front. If those spaces aren't sufficient, then we can relocate or add two along the west side of the existing building. January 9th Staff Review Comments: Transfort 1. The bus stop has been moved to the east. Stormwater 1. See revised plans from JR Engineering. Transportation Planning: 1. The 15-foot dimension has been fixed. Engineering_ 1. The fire lane has been shown on the Plat. We have also provided Ron Gonzales a Fire Lane Plan. 2. Signature will be obtained on final mylars before submittal. 3. The proposed sidewalk is 5-feet wide and is in a new configuration. See plans. 4. See above comments regarding Letters of Intent from the Everitt Companies and the ditch company. 5. The public easement has been added to the Plat. 6. Acknowledged. 7. The 15-foot dimension was an error and has been fixed. 8. Transportation Easement has been added. 9. Signage and striping plan has been revised. 10. The existing curb, gutter, etc. has been shown in a shaded gray tone on the site plan. We have also added labels to help clarify what is being removed. Planning: 1. The Shadow Analysis has been revised to reflect the current building footprint, location and height. Site Plan: 2. The score marks are the lines that we show in the sidewalks. They could be concrete scoring lines or construction joints. The note is placed on the plans in the event that someone might try to build off of the planning documents and takes those lines literally. We like to show them for illustrative purposes. 3. Fixed. 4. Bus stop moved. 5. Sidewalk issues have been resolved. 6. We have fixed some of the end islands to better define a 17-foot deep stall. Landscape Plan: 7. The landscape identification method has been fixed. 8, 9. We have added several trees at the south end of the addition. 10. Street trees have been added. 11. We have placed a double row of shrubs along the southern property line since the sidewalk went away and the landscape buffer became 10-feet wide. The shrubs are Compact Cranberry Viburnum and Arcadia Junipers. 12. We have added additional trees and shrubs in the landscape islands. Building B Elevations: 13. This issue was resolved once we found out that mechanical screens were excluded from the building height calculation. 14. See revised building elevations. If there are any further questions, or need of further clarification, please contact me. Sincerely, CDJ u ' , Cathy Mathis, Project Planner VF Ripley Associates PROJECT COMMENT SHEET City of Fort Collins Current P DATE:April 22 ,1998 DEPT: Engineering PROJECT:# 24-98 Atrix Laboratories - Type I (LUC) PDP PLANNER: Mike Ludwig ENGINEER: Michael K. Dean, P.E. All comments must be received by: Wednesday, May 20,1998 Provide a Replat of the site which vacates the existing Public Access Easement on Worthington Avenue and dedicate it as R.O.W.- Drive access off of Worthington Avenue should align on centerline with the drive access across the street. Date: MAC 2O r 99 Signature: CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _✓Plat _✓Site _Drainage Report _Other ✓6tility ✓Redline Utility v4�andscape PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE:Apri122 ,1998 DEPT: Engineering PROJECT:, 24-98 Atrix Laboratories - Type I (LUC) PDP PLANNER: Mike Ludwig ENGINEER: Michael K. Dean, P.E. All comments must be received by: Wednesday, May 20,1998 Provide a Replat of the site which vacates the existing Public Access Easement on Worthington Avenue and dedicate it as R.O.W.. Drive access, off of Worthington Avenue should align on centerline with the drive access across the street. Date: W ,0 1 Signature: CHECK HERE IF )(OU WISH TO RECEIVE COPIES OF REVISIONS _✓Plat _✓Site _Drainage Report _Other ✓fJtility ✓Redline Utility �andscape VF Ripley Associates, Inc. Response to Staff Comments Atrix Laboratories Page 2 RI Ok- a. A tree has been added to the south side of the building. b. Two street trees have been added to the landscape plan. C. The plant list has been revised in order to limit no more than 25% of the total trees to be of any one species. d. Four ornamental trees have been added along the west parking lot area in between the parking lot and Worthington Avenue. e. An additional 17 isanti dogwoods have been added on the west side of the parking lot in between Worthington Avenue and the parking area. f. An additional bike rack has been placed near the front entrance of the building, just off the parking lot. g. The lighting plan has been clarified so that is it legible. h. A parking lot island has been added to the western row of parking. i. Colored patterned crosswalks have been added to the site, as indicated on the redlined drawings. j. A note has been added to the site plan in regards to light pole height being 12 1/2' and that all fixtures must be down directional, sharp cut-off and high pressure sodium. k. Sidewalk widths, drive aisle widths, and parking setbacks have been dimensioned on the site as indicated on the redlined set of drawings. 1. The building square footage has been revised on the site plan, as indicated on the redlined set of drawings. M. The note on the site plan referring to the addition to building A reads as follows, "Proposed Addition (not a part of this submittal). n. The legal description to the property closes. o. Zoning districts have been added to the Vicinity Map. p. Street names have been added to the Vicinity Map. q. Plant note #5 has been revised to reference the cost for installation. r. There is no existing vegetation on the proposed site, therefore the plant protection notes have been removed. Landscaping that exists on the Building A site has been added to the landscape plan. S. Elevations for the trash enclosure have been provided. t. Building colors have been indicated on the building elevations. U. The mechanical equipment, which is located on the rooftop of the building, has been reduced to an enclosure that is 26' x 28' or 728 square feet. With the total square feet of the enclosure and the total third floor square feet, the rooftop equipment covers less than 5% of the allowed horizontal surface per section 3.8.17[C] of the Land Use Code. 6. Ok PROJECT COMMENT SHEET City of Fort Collins Current P DATE:Apri122 ,1998 DEPT: Engineering PROJECT:# 24-98 Atrix Laboratories - Type I (LUC) PDP PLANNER: Mike Ludwig ENGINEER: Michael K. Dean, P.E. All comments must be received by: Wednesday, May 20,1998 Provide a Replat of the site which vacates the existing Public Access Easement on Worthington Avenue and dedicate it as R.O.W.. Drive access off of Worthington Avenue should align on centerline with the drive access across the street. Date: MAC Z0 I9g6 Signature: CI ECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat _✓Site Drainage Report _Other ✓6tility ✓Redline Utility �andscape City of Fort Collins Current Planning DATE: July 15,1998 REVISIONS COMMENT SHEET DEPT: Engineering PROJECT:# 24-98 Atrix Laboratories --Type I (LUC) PDP PLANNER: Mike Ludwig ENGINEER: Michael K. Dean, P.E. All comments must be received by: Wednesday, July 15,1998 Provide a Replat of the site which vacates the existing Public Access Easement on Worthington Avenue and dedicate it as R.O.W..(Repeat) Provide the proper forms (see attached) with the easement dedications if they are to be done by separate document. Date: Signature: CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS ✓ Plat _� ite Drainage Report _Other �tility ✓Redline Utility VTandscape City of Fort Collins Current Pl DATE: July 15,1998 REVISIONS COMMENT SHEET DEPT: Engineering PROJECT:#: 24-98 Atrix Laboratories -Type I (LUC) PDP PLANNER: Mike Ludwig ENGINEER: Michael K. Dean, P.E. All comments must be received by: Wednesday, July 15,1998 Provide a Replat of the site which vacates the existing Public Access Easement on Worthington Avenue and dedicate it as R.O.W..(Repeat) Provide the proper forms (see attached) with the easement dedications if they are to be done by separate document. Date: j-,,,y /5 /Y�8 Signature: CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS ✓ Plat _� ite _Drainage Report _Other �tility ✓Redline Utility ✓Landscape REVISION COMMENT SHEET DATE: July 31, 1998 TO: Engineering PROJECT: #53-85AT Atrix Labs (CAT 8th Filing Bldg. B) Type I PDP All comments must be received by Mike Ludwig no later than the staff review meeting: Wednesday, August 26, 1998 Atrix Labs August 17, 1998 A minor amendment will be needed for Lot 2 prior to the Final Approval of this project. It is needed for the retaining wall, trickle pan and any changes in landscaping that are required due to these improvements. Plat • Worthington ROW needs to be dedicated. The vacation of the existing Public Access Easement and the dedication of the area as ROW can and should be done on the plat. This is the easiest and quickest way to do so. (Repeat) • Lot 2 should also be replated at this time. This will allow you to vacate the existing easement as needed for the future building and dedicate the easement needed for the dention pond on the lot. • Indicate the Row width for Centre Ave. • Show the grading; drainage easement that is south of Lot 2 and indicate that it is to be dedicated by separate document. Utility Plans • General Note 17 indicates that maintenance of all tracts shall be the responsibility of the homeowners assoc. There are no tracts indicated on the Plat - it is all one lot. (Continued on next page) Date: 61 �Signature: (5 CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat �Sk _ V Report _ Oler ,Utility ,Redline Utility elan&* City of Fort Collins Atrix Labs (page 2 of 2) August 17, 1998 • Label the sidewalk along the southern property line as a 5 foot sidewalk. • Show the existing landscaping in the detention pond - what is to remain and what is to be removed? • Label the proposed building on Lot 2 as "Future Proposed Building" Note - although this future addition is shown on the utility plans and will be approved with them. This can not be built until the building addition is approved thru the minor amendment process. If at the time this is done and the building layout changes the utility plans may also need to be modified and updated to the new layout and/or configuration. •ram` �; _ "'VISION COMMENT SHEET DATE: July 31, 1998 TO: Engineering PROJECT: #53-85AT Atrix Labs (CAT.8th Filing Bldg. B) Type I PDP All comments must be received by Mike Ludwig no later than the staff review meeting: Wednesday, August 26,1998 Atrix Labs August 17, 1998 A minor amendment will be needed for Lot 2 prior to the Final Approval of this project. It is needed for the retaining wall, trickle pan and any changes in landscaping that are required due to these improvements. G k Plat • Worthington ROW needs to be dedicated. The vacation of the existing Public Access Easement and the dedication of the area as ROW can and should be done on the plat. This is the easiest and quickest way to do so. (Repeat) °' • Lot ishould also be replated at this time. This will allow you to vacate the existing easement as needed for the i:uture building and dedicate the easement needed for the dention pond on the lot. �- CA-sc-r..&1is oY4 LaT �L 1� ar VAL'�t • Indicate the Row ,,vidth for Centre Ave. o �-- • Show the grading drainage easement that is south of Lotl and indicate that it is to be dedicated by separate document. v46a • b -•k- Utility Plans • General Note 17 indicates that maintenance of all tracts shall be the responsibility of the homeowners assoc:. There are no tracts indicated on the Plat - it is all one lot. 0! tmac (Continued on next page) Date: Al Signature: CS �a;,�tlw _zz CRECK HERE IF YOU WISII TO RECEIVE COPIES OF REVISIONS ,�PTlat site _ �D raiin�a,,ge�,Repo�t _ Ole fifi : U�}' + *a}N City of Fort Collins Atrix Labs (page 2 of 2) August 17, 1998 �• Label the sidewalk along the southern property line as a 5 foot sidewalk. k . • Show the existing landscaping in the detention pond - what is to remain and what is to be removed? '(1»: _ is 0� C* � �N • Label the proposed building on Lotl as "Future Proposed Building" Note - although this :future addition is shown on the utility plans and will be approved with them. This can not be built until the building addition is approved thru the minor amendment process. If at the time this is clone and the building layout changes the utility plans may also need to be modified and updated to the new layout and/or configuration. o k REVISION COMMENT SHEET DATE: July 31, 1998 TO: Engineering PROJECT: #53-85AT Atrix Labs (CAT 8th Filing Bldg. B) 'Type I PDP All comments must be received by Mike Ludwig no later than the staff review meeting: Wednesday, August 26,1998 Atrix Labs August 17, 1998 A minor amendment will be needed for Lot 2 prior to the Final Approval of this project. It is needed for the retaining; wall, trickle pan and any changes in landscaping that are required due to these improvements. Plat • Worthington ROW needs to be dedicated. The vacation of the existing Public Access Easement and the dedication of the area as ROW can and should be done on the plat. This is the easiest and quickest way to do so. (Repeat) • Lot 2 should also be replated at this time. This will allow you to vacate the existing easement as needed for the future building and dedicate the easement needed for the dention pond on the lot. • Indicate the Row width for Centre Ave. • Show the grading drainage easement that is south of Lot 2 and indicate that it is to be dedicated by separate document. Utility Plans • General Note 17 indicates that maintenance of all tracts shall be the responsibility of the homeowners assoc. There are no tracts indicated on the Plat - it is all one lot. (Continued on next page) Date: CS X1/1k CHECK HERE IF YOU WIM TO RECEIVE COPIES OF REVISIONS Tlat },, Site _ Drai�4�ag�e,Rqut _ Over �"�`� 2 U""'11°""7 °4"' City of Fort Collins Atrix Labs (page 2 of 2) August 17, 1998 • Label the sidewalk along the southern property line as a 5 foot sidewalk. • Show the existing landscaping in the detention pond - what is to remain and what is to be removed? • Label the proposed building on Lot 2 as "Future Proposed Building" Note - although this future addition is shown on the utility plans and will be approved with them. This can not be built until the building addition is approved thru the minor amendment process. If at the time this is done and the building layout changes the utility plans may also need to be modified and updated to the new layout and/or configuration. REVISION COMMENT SHEET DATE: September 17, 1998 TO: Engineering PROJECT: #53-85AT Atrix Labs - CAT 8th Filing - Type 1 - PDP All comments must be received by Mike Ludwig no later than the staff review meeting: Wednesday, October 14, 1998 Atrix Labs - CAT 8" Filing Have not seen a minor amendment for Lot 1 - Minor amendment is needed for: October 12, 1998 The retaining wall to be placed on the site for the detention pond. This will have to be built a this time with the detention pond. Changes to the approved landscaping. You have said there is no landscaping out in the field. 1 do not know why that is, but there is an approved landscaping plan that shows landscaping in this area. The minor amendment needs to show the changes to this plan. A letter of intent for the off site easement is needed prior to this project being scheduled for a hearing and the signed easement is needed at least two weeks prior to the signing of the mylars by the City. Date: / /'�O��- Signature: ✓j City of Fort Collins VF Ripley Associates, Inc. Response to Staff Comments Atrix Laboratories Page 3 7. Ok. 8. Ok. Ifyou have any questions regarding the revisions or these comments, please call. Sincerely, VF RIPLEY ASSOCIATES, Inc. Claudia Sampson s 3`C M REVISION r COMMENT SHEET DATE: June 22, 2001 DEPT: ENGINEERING PROJECT: Douglas Road @ Hearthfire All comments must be received by Sheri Wamhoff no later than: July 11, 2001 ❑ l�ie� Comment Problems or Concerns (see below or attached) Douglas Road interim improvements from Hearthfire Way to CRl 1 July 16, 2001 En ineering comments Need to provide elevations for the Hearthfire larO_Douglas Road intersection. How does this tie in? What are limits of pavement removal, if any. (repeat comment) - Comments on the plans idicted see the grading plan, no elevations are provided on the grading plan. Need information on how this intersection is to be built, graded and drains. Provide elevations at the x's. 2"� Add "to be" into the label on the plans indicating the pavement design — "proposed ground with 4.5" overlay overlay design to be based on final soils report" Sheets 2 - 4 �l l� (3� Need to provide the 20 foot slope easement. This easement will be dedicated to the county, since it is within the �,E t county, therefore it will need to be in county acceptable format, submitted to and accepted by the county. I will need a letter from the county indicating that this easement has been submitted and accepted by them. This is needed before the plans can be signed. Will need easements (processed as above) or letters from the property owners granting the permision to do the work as shown outside of the row to tie the driveways in. The letters would need to be from each property owner indicating that they will allow work on there property to tie the driveway in. ,_X" Provide the existing grade that is being tied into at the east end of Douglas Road past CR11. 4b"' At the Douglas Road and CR11 intersection show the following on the striping plan: On the legs that have existing striping add a note "match existing striping", Add a stop bar strip on the south leg, Add a sign on the north "pavement ends". 'As indicated in the comments above prior to being able to approve/sign the plans for this project the easement needs to be obtained and submitted to the County,, letters -for all -work shown on the driveways outside of -the row need to be obtained Date: & Signaturee , 0o'.1 Please send copies of marked revisions _Plat _Site _Utility _Landscape �-° L11 NO COMMENTS — SUBMIT MYLARS Citv of Fort Collins Project Comments Sheet City of Fort Collins Selected Departments Department: Engineering Date: November 21, 2001 Project: C.A.T. 8TH FILING REPLAT, ATRIX LABS PDP, TYPE II (LUC) All comments must be received by STEVE OLT in Current Planning no later than the staff review meeting: November 14, 2001 Mote - Please identify your redlines for future reference Issue Contact: Sheri Wamhoff Topic: General 10 The planning objectives stated that the project was going to be built in two phases. Need to show phasing an all the plan if the project is to be phased to show what is to be built with each phase. 16 The sidewalks that are in front of and abut parking spaces need to be a minimum of 6 ft in width. They are shown as 5.5 ft on the utility plans. 17 No portion of the building, foundations or walls can extend into the easements. (need to move the building to accoidate the 9 ' utility easement) 55 Need to install a type B transit stop East of Worthington on Centre. 57 Need at Ditch Co signature on the utilty plans - grading within the ditch co easement. 61 May need to provide a striping plan or other improvements to provide a left turn lane. Per the traffic study a left turn lane on Centre at Worthington is needed. Topic: Plat 22 A 9 foot utility easement needs to be provided behind the row. This is the current standard. The easement needs to be shown along all street boundaries. 23 Provide an easement along the south property line for the sidewalk connection. The sidewalk needs to be a width as per detail 7.14. Signature Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat _� Site Drainage Report Other X Utility _Redline Utility Landscape Page 1 24 Provide an easement for the detention pond and any other drainage areas. 25 Per planning objectives there is a designated firelane looping through the property. Provide an emergency access easement for that. Topic: Site Plan 11 Please show existing facilities such as curb and gutter and parking lot that exist as dashed or in a lighter shade so can tell what improvements are to be made. Topic: utility plans 12 Add the three additional notes to the cover sheet as shown 13 Provide two benchmarks, only one is currently provided. 14 Provide the Indemnification statement per 3.3.1.F 15 Provide all applicable construction notes 18 Need to show and note the pavement patch areas where the pavement will be cut to install the utilities. 19 The planning objectives indicated that the median in the north driveway was going to be removed and the driveway rebuilt to standards. The plans are not showing that being done. The driveway can be rebuilt as a high volume driveway. The driveway meets the high volume requirements when calculating the percentage of traffic that utilizes that driveway based on the traffic study numbers. 20 There is an enhanced crosswalk detail in the plans - where are these to be placed? They are not labeled anyplace. 21 Provide details: 7-20A for vert curb, 7-29B for driveway, 7-14 for sidewalk path connection, 16-1 for sidewalk construction, and 22-1 for trench detail. Page 2 Date: March 25, 2002 Project: C.A.T. 8TH FILING REPLAT, ATRIX LABS PDP, TYPE II (LUC) All comments must be received by STEVE OLT in Current Planning no later than the staff review meeting: March 20, 2002 Mote - Please identify your redlines for future reference Issue Contact: Sheri Wamhoff Topic: General 57 Need Ditch Co signature on the utility plans - grading within the ditch co easement. Obtain the Ditch Company signature on the mylars prior to submitting the mylars to the City. 72 The future bus pad needs to be shown 55 feet from the back of the crosswalk and 20 feet in length. Not yet shown this way on the signing and striping plan. Label it as a future Bus Stop/Pad on this Sheet. Topic: Plat 75 Provide the transportation easement for the future bus pad. Note that the transportation easement includes but is not limited to use as a bus stop. The Transportation easement needs to be located approximately 55 feet east of the west property line, please adjust it on the plat. Topic: Site Plan 109 Please move the tree wells 2 feet to the west in the 15 foot island between the parking stalls to provide for a 6 foot clear walking path. Please call if you have questions. Topic: utility plans 14 Provide the Indemnification statement per 3.3.1.F 15 Provide all applicable construction notes. Add 'Street Improvement Notes' 1 through 7 and `Traffic Signing and Pavement Marking Copstruetion Notes' I`thpugh 14. Signature Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report Other_ Utility_ Redline Utility Landscape Page 1 108 Show the tree grates in the 15 foot island offset to the west from center by two feet. 110 Provide a note at the end of the off -site sidewalk connection that states ' Connect new sidewalk to existing sidewalk'. 111 Show all of the off -site sidewalk that is within the Ditch Co easement on the grading plan. Since this sheet is being signed by the Ditch Co, if the sidewalk in shown within the easement and they have signed approving the sheet it will show their approval for the sidewalk to be located within their easement. 112 Once all engineering, stormwater, and water wastewater comments have been addressed utility plan mylars can be submitted. 113 Provide off -site easement for sidewalk signed and in final format with or prior to mylar submittal. Will need easement from the property owner as well as permission (signature) from the New Mercer Ditch if they have an exclusive easement. Page 2 DATE: April11, PROJECT: Cat 8' REVISION COMMENT SHEET 2002 DEPT: ENGINEERING Filing, Atrix labs — They have decided to phase the project, attached are the sheets revised to show the phasing for review. All comments must be received by Sheri Wamhoff no later than: April 18, 2002 ❑ No Comment ❑ Problems or Concerns (see below or attached) Atrix , cat 8'h filing phasing revisions April 22, 2002 1. Need to see the phase line on the site and landscape plans to know where the edge of pavement is to be. 2. Horizontal control plan — ❑ Need to label the phase line as Phase line. ❑ Parking island at the south property line, probably easiest to build the whole island rather than half of it. Cl Will need to show that you are building a paved connection out to Worthington. This connection is needed in order to provide emergency access for Phase 1. 3. Overall utility Plan — ❑ Remove the phase line from this plan. It does not do anything. Either label in which phase each piece of the utility is in or use a phase line that actually shows what is in each phase. ❑ Need to identify what to do with the ends of the pipes for the interim until phase 2 is done. I. Overall Grading Plan — ❑ Need to show the drive connection out to Worthington as a part of Phase 1. ❑ Need to show the interim Swale design and its location (this swale will be certified with phase 1 work). Date: ` 'z, �'� Signatue: l< Please send copies of marked revisions _Plat Site Utility _Landscape ❑ NO COMMENTS — SUBMIT MYLARS Ift— City of Fort Collins Communs_y Planning and Environmental S__vices Current Planning Citv of Fort Collins May 21, 1998 Linda Ripley V-F Ripley Associates, Inc. 1113 Stoney Hill Drive Fort Collins, CO 80525 Dear Linda, Staff has reviewed your documents for the Atrix Laboratories Building B, PDP, that were submitted on April 22, 1998 and would like to offer the following comments: The Water Conservation Specialist stated that the landscape plan shall contain a note calling for the review and approval by the City of Fort Collins of any landscape irrigation system, prior to the issuance of a building permit. 2. The Building Inspections Department offered the following comments: a. Accessible exterior wheelchair routes and parking facilities shall be provided with each phase of the development in accordance with Uniform Building Code Chapter 11, Appendix Chapter 11, Division 1 and the American National Standards Institute Publication A117.1-1992 titled Accessible and Usable Buildings and Facilities. Accessible parking spaces are eight feet wide with a five feet wide adjacent access aisle. Slopes for parking and access shall not exceed 1:50 in any direction. b. Buildings larger than 5000 square feet shall be equipped with an automated fire -suppression system throughout in accordance with Uniform Building Code Section 904.2.2 as amended by the City of Fort Collins. C. Buildings shall be designed to comply with the Fort Collins Energy Codes. The residential code is an amended version of the 1995 Model Energy Code and the nonresidential code is based on ASHRAE / IES (American Society of Heating, Refrigerating and Air-conditioning Engineers / Illuminating Engineering Society) 90.1-1989. 3. The Poudre Fire Authority offered the following comments: a. The proposed building exceeds 5,000 square feet for Type V construction and must be fire contained, construction type upgraded, or fire sprinklered. 'hl North Collc, e ;avenue • P.O. Box �80 • Fort Collins, CO il)� O�H(1 • (`?-(�) _�1 ���511 FAX (070) b. Fire hydrants are required with a maximum spacing of 600 feet along an approved roadway. Each hydrant must be capable of delivering 1,000 gallons of water per minute at a residual pressure of 20 psi. Hydrants shall be of an approved type as defined by the water department and the fire department. No commercial building can be greater than 300 feet from afire hydrant. C. This 3-story laboratory shall be fire sprinklered. Fire sprinklers shall be monitored by a U.L. listed Central Station. d. A knox box (key box) is required at the front door. e. Hazardous materials shall comply with Article 80 of the current Uniform Fire Code. 4. The Zoning Department offered the following comments: a. Please show ramps at the handicap accessible spaces. b. Please locate bike racks near the building entrances. A bike rack must be added at the main entrance on the south side of the building. C. Please add another handicap accessible ramp on the south side of the building at the end of the patterned walk area. d. Is there adequate access to the trash dumpster for a trash truck? e. Please add a note to the landscape plan that a separate permit is required for the irrigation system. f. A shadow analysis is required pursuant to Sections 3.5.1 [H] and 3.8.17[C] of the Land Use Code. g. Please show building / envelope dimensions and relative distances to property lines on the Site Plan. h. If wall signs are intended, please show locations on the building elevations as the site is located within the Residential Neighborhood Sign District. i. A 5' landscaping buffer is required on the south property line. 5. The Public Service Company stated that any reroute of existing PSC facilities caused by this new buildng and/or addition will be at the developer's expense. Proposed easements appear to be adequate. 6. The Current Planning Department offers the following comments: a. Please add two trees on the south side of the building as indicated on the redlined landscape plan in accordance with Section 3.2.1 [D][1 ][b] of the Land Use Code. b. Please add street trees 3 to 7 feet behind the sidewalk as indicated on the redlined landscape plan in accordance with Sections 3.2.1 [D][1 ][b] and 3.2.1I.D][2][b]• C. Please revise the tree species list on the landscape plan accordingly. No more than 25% of the total trees may be of any one species as per Section 3.2.1 [D][3] of the Land Use Code. d. Please add ornamental trees along the west (Worthington Avenue) perimeter of the parking lot in accordance with Section 3.2.1 [E][4][a] of the Land Use Code. e. Please add another 25 to 30 feet of isanti dogwoods on the west (Worthington Avenue) perimeter of the parking lot in accordance with Section 3.2.1 [E][4][b] of the Land Use Code. Please add a bike rack at the entrance on the south side of the building in accordance with Sections 3.2.2[C][3] and 3.2.2[C][4][a] of the Land Use Code. g. Compliance with Section 3.2.4 Site Lighting cannot be determined as the lighting levels are not legible on the Lighting Plan. Please clarify. h. Please add a parking lot island to the western most row of parking. Please add colored, patterned crosswalks as noted on the redlined site and landscape plans. Please add a general note to the site plan regarding the height of light poles in the parking lot. Please also note that all fixtures must be down directional, sharp cut-off and high pressure sodium. k. Please dimension all sidewalks widths, drive aisle widths, and parking setbacks as noted on the redlined site plan. Please provide clarification regarding the building square footage as noted on the redlined site plan. M. Please note on the site plan that the proposed addition to building A is not a part of this submittal. n. Please verify that the legal description of the property closes. o. Please add zoning districts to the Vicinity Map. P. Please add street names to the Vicinity Map as noted. q. Please revise Plant Note #5 to reference that letter of credit, etc. be in the amount of 125% of the cost for the materials and installation. Plant notes 7 through 13 reference the protection of existing trees. Please show all existing vegetation on the site and landscape plans (including a landscaping for Building A). Please label all existing vegetation that is to removed or retained. S. Please provide elevations for the trash enclosure. t. Please indicate building colors on the building elevations. U. It appears that the mechanical equipment (cooling tower, fume hood, screen wall, etc.) exceeds 5% of the horizontal surface area of the roof. Please submit documentation as required for special height review. Please refer to Sections 3.5.1 [H] and 3.8.17[C] of the Land Use Code. V. Additional comments are noted on the attached redlined set of the Site Plan, Landscape Plan, Building Elevations and Lighting Plan. Please return all redlined documents with plan revisions. 6. Comments and redlined utility plans from the Engineering Department are attached. Please return all redlined documents with plan revisions. 7. Comments and redlined utility plans from the Stormwater Utility are attached. Please return all redlined documents with plan revisions. 8. Comments and redlined utility plans from the Water and Wastewater Utility are attached. Please return all redlined documents with plan revisions. This completes the review comments at this time. Additional comments may be forthcoming as the various departments and reviewing agencies continue to review this request. Please contact the Current Planning Department for the required number of plan revisions prior to revision submittal. Please provide a written response to each of the above stated comments. An administrative hearing date will be assigned once all comments have been addressed and revisions have been reviewed. Please contact me at 221-6206 if you have any questions or concerns related to these comments. Sincerely, Michael Ludwig, AICP City Planner xc: Mike Dean Stormwater Utility Current Planning File #53-85AT Commut—Ev Planning and Environmental ._ervices Current Planning Citv of Fort Collins July 22, 1998 Linda Ripley V-F Ripley Associates, Inc. 1113 Stoney Hill Drive Fort Collins, CO 80525 Dear Linda, Staff has reviewed your revisions for the Atrix Laboratories Building B, PDP, that were submitted on June 18, 1998 and would like to offer the following comments: TCI of Fort Collins stated that they have no issues with the proposed Site Plan. For TCI to serve this project, the owners will need to contact the Commercial Accounts Division Executive, Reneta Santoro, about a broadband utility easement. Otherwise, TCI will make no provisions to service this project. 2. The Current Planning Department offers the following comments: a. Choosing to dedicate right-of-way and easements and to vacate easements by separate documents subjects the applicant to additional public hearings. Easement and right-of-way dedications by separate documents must be scheduled for hearing by the City Council. Easement vacations by separate documents must be scheduled for hearing by the Planning and Zoning Board. By re -platting the property, the plat (which will dedicate all on -site easements and right-of-way and vacate any unnecessary existing easements) can be processed with the Site Plan, Landscape Plan and Building Elevations through the Administrative (Type 1) Review process. Staff recommends that the Atrix Laboratories Building A property be included with the replat so that a portion of the drainage easement for the existing detention pond can be vacated for the future expansion to Building A. Then the future expansion can be processed as a Minor Amendment without any time delays associated with an easement vacation being heard by the Planning and Zoning Board. Please submit a replat of the property. ='til \i()rth Colle-e Av; ,m-it, • P.O. Box 580 • Fort Collins, CO 80522-058C • '970) 221-6750 • FAX (970) 416-2020