Loading...
HomeMy WebLinkAboutATLAS PUD - Filed CS-COMMENT SHEETS - 2003-05-27Commu v Planning and Environmental rvices Current Planning -itv of Fort Collins December 20, 1996 Bob Sutter Architectural Horizons P.O. Box 271217 Fort Collins, CO 80527-1217 Dear Bob, Staff has reviewed the revisions for the Atlas Roofing PUD, Preliminary that were submitted on November 22, 1996, and would like to offer the following comments: 1. The Light and Power Utility stated that development charges will apply for the entire lot. The applicant should contact Light and Power at 221-6700 to determine the amount of these charges. 2. Public Service Company offers the following comments: a. If natural gas service is desired for the proposed garage, a separate natural gas service line/meter will be required. b. No trees may be planted closer than 4' to any natural gas line. 3. The Natural Resources Department offers the following comments: a. Please specify that there won't be any deep excavation, since we don't want to expose any residual soil contaminants. b. The General Note #5 about storing construction materials (i.e. roofing) should be shortened to "construction materials will not be stored outside". 4. The Zoning Department offers the following comments: a. The land use designation needs to include "vehicle and material storage" for the type of business. b. Any outside storage must be screened (enclosed by an opaque fence) and designated on the Site Plan. 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 FAX (970) 221-6378 • TDD (970) 224-6002 PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: April 22, 1997 DEPT: Engineering PROJECT: #32-96A Atlas Roofing P.U.D. - Final (LDGS) PLANNER: Mike Ludwig All comments must be received at the staff review meeting: Wednesday, May 21, 1997 Site / Landscape Plan 1. The curb stops and meter pits are shown differently than they are on the utility plans. Utility Plans 2. Sheets numbered 3, 4 and the plat (assume sheet 2) were received, but sheet 1 (cover sheet) was not. A cover sheet with the general notes is needed. 3. Show the easements on the utility plans ,/4. Label the where the existing curb cut is to be replaced with curb, gutter and walk. 5. Label the chain link fence and light pole as being removed. 6. Label the trash enclosure ✓7. Provide curb, gutter and sidewalk detail, driveway detail, and additions to sidewalk detail. Date: V Signature (U {� CHECK IRE IF YOU 19STH TO RECEIVE COPIES OF REVISIONS \ Plat _ Side _ Drainage Report _ Oler Utility _ Reline Utility X Lands* City of Fort Collins Comnr� Ay Planning and Environmenta. ervices Current Planning City of Fort Collins May n. , 1997 Bob Sutter Architectural Horizons P.O. Box 271217 Fort Collins, CO 80527-1217 Dear Bob, Staff has reviewed your documents for the Atlas Roofing PUD, Final that were submitted on April 22, 1997„ and would like to offer the following comments: 1. The Light and Power Utility stated that development charges will apply for the entire lot. The applicant should contact Light and Power at 221-6700 to determine the amount of these charges. 2. The Zoning Department offers the following comments: a. Foundation plantings are needed on the north side of the garage building. b. The property is located in the residential neighborhood sign district. Therefore, the Planning and Zoning Board will review the location of the proposed wall signage. 3. The Mapping Department reminds the applicant of the new subdivision plat requirements which are in effect (specifically, item 2(y) on page 7 of the Final Plat submittal requirements). 4. The Advance Planning Department requests that Austrian Pine be substituted for Pinyon Pine on the landscape plan as additional screening of the parking lot is needed. 5. The Current Planning Department offers the following comments: Site Plan a. Please revise the "Allowed Uses" statement on the PUD Site Plan. The B-L, Limited Business Zone no longer exists. The allowed use should be "office/showroom plus enclosed vehicle and material storage". 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020 b. The Attorney's Certification is required on the Plat but not on the Site Plan. C. Please delete the notary block below the Secretary of the Planning and Zoning Board's signature block. d. Please update or delete general note #3 on the Site Plan (Spring?). e. General note #5 states that no liquid petroleum materials/products will be stored outside. Are liquid petroleum materials/products allowed anywhere on this site as it was previously contaminated? f. Please add a general note to the Site Plan which states: "All rooftop or ground mounted mechanical equipment is to be fully screened from the public view." g. Please add a general note to the Site Plan which states: "All trash dumpsters are to be enclosed and gated. Materials and colors shall be the same or compatible with the main office/showroom building." h. Please add a general note to the Site Plan which states: "Bike rack shall be permanently mounted to concrete, and shall not interfere with pedestrian access." i. Please label Laporte Avenue, W. Mulberry, W. Elizabeth, and S. Shields Street on the Vicinity Map. j. The proposed curb stops and meter pits shown on the Site Plan must be moved west of the future R.O.W. line. k. Please add a legend to the Site Plan which includes symbols for the handicap parking stall and bike rack. Please label the proposed driveway and parking material (concrete or asphalt?). M. The zoning districts indicated on the Site Plan no longer exist. Please revise these districts to reflect the CityPlan zoning District designations (North - LMN, South - RL, West - LMN, East - LMN). Landscape Plan n. Section 29-526 G(4)(c)[1]c page 102 of the LDGS states: "proposed plant materials should be indicated at 10 years of maturity and in appropriate relation to scale." Please revise the landscape plan accordingly. o. The proposed symbols on the landscape schedule are very similar and are difficult to distinguish from one another. Please revise accordingly. P. Please clarify that the size caliper of the trees on the landscape schedule are in inches. It appears that they are in feet. q. The Tam Juniper must be 5 gallon in size, not 3 gallon. Building_ Elevations A condition of the Planning and Zoning Board's Preliminary PUD approval was that the wood fence be framed, not a standard picket fence. Please provide a detail of the wood fence on the Elevation sheet. S. The trash enclosure detail references an "opening". The opening must be gated. Please label the front elevation of the existing building as the east elevation. U. Please label the end elevation of the existing building as the south elevation. V. Please provide north and west elevations of the existing building. W. The south elevation of the proposed garage building is incorrectly labeled as the west elevation. Please revise. X. Please label the side elevation of the proposed garage building as the east and west elevations. Y. Please provide a north elevation for the proposed garage building. Z. Please provide a paint schedule on the elevation sheet which provides detailed paint colors and product names and stock numbers. Samples of building colors should be provided with plan revisions. 6. The Transportation Planning Department requests that a bike rack be added to the Site Plan. 7. Comments; and redline plans from the Engineering Department are attached. Please return the redline plans to Mike Ludwig with plan revisions. 8. Comments and redline plans from the Water and Wastewater Utility are attached. Please return the redline plans to Mike Ludwig with plan revisions. 10. Comments and redline plans from the Stormwater Utility are attached. Please return the redline plans to Mike Ludwig with plan revisions. This completes the review comments at this time. Additional comments may be forthcoming as the various departments and reviewing agencies continue to review this request. As you are aware, the City is implementing a new development review process. Plan revisions may now be submitted at any time. Planning and Zoning Board dates will be assigned by City Staff when all issues have been addressed. Please contact me for the number of folded revisions required for each document prior to the submittal of plan revisions. Please contact me at 221-6206 if you have any questions or concerns related to these comments. I would like to schedule a meeting with you as soon as possible, if necessary, to discuss these comments. Sincerely, �e-al�e4- Michael Ludwig Project Planner xc: Sheri Wamhoff Stormwater Utility file/Project Planner REVISION COMMENT SHEET DATE: June 17, 1997 DEPT: Engineering PROJECT: #32-96A Atlas Roofing P.U.D. - Final (LDGS) PLANNER: Mike Ludwig All comments must be recieved no later than the staff review meeting: Wednesday, July 2, 1997 A .Y�rl�-� lS -D C-. lJJ C, Ot t r 9 Date: Z / �} Signature•-L� CHECK HERE IF YOU VISH TO RECEIVE COPIES OF REVISIONS _ Plat _ Sitc; _ Drainage Repot _ Oler _ Utility _ Maine Utility _ Landseape City of Fort Collins TST Michael Ludwig, Project Planner Current Planning City of Fort Collins P.O. Box 580 Fort Collins, CO 80522-0580 Re: Atlas Roofing P. U.D. Project No. 10-868-001 Dear Mike: July 11, 1997 We have reviewed the City's comments concerning the Atlas Roofing P.U.D. and have addressed the issues as follow: Mapnin� The errors in the legal description have been corrected. 2. At thiis time, we are unaware of any need for utility easements along the north and west sides of the project. 3. The additional R.O.W. is not required at this time. As per Engineering's comments of March 3, 1997, this R.O.W. does not need to be dedicated until there is future development of the site. Please see the included copy of their comments. En6neerin� We have identified on the plat that Dr. S.A. Patterson is the holder of the irrigation ditch easement as requested by the engineering department. Water/Wastewater The concern of the hose bib in the garage freezing has been noted. Per a conversation with Roger Buffington on July 11, 1997, this issue can be addressed at time of building permit. Therefore, no further action is being taken at this time. 2. The manhole on the plans that has been questioned as a sanitary sewer manhole has been determined to be related to the previous operations of the site and not the sanitary sewer. The exact location of the possible private sanitary sewer manhole adjacent to the west fence is unknown at this time, if it does actually exist. After conferring with Roger Buffington on July 11, 1997, he is satisfied with this conclusion. No additional action is needed at this time. TST INC. Consullin".; E11,611L. is TST Storm Water 1. A copy of the improvement location certificate is being resubmitted as documentation of the historic impervious area. 2. The comments noted on the plans have been addressed. The ditch owner's signature will be provided when submitting mylars. If there are any questions or additional information required concerning this submittal please contact me. Sincerely, TST, INC. CONSULTING ENGINEERS Eric M. Fuhrman PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: November 27, 1996 DEPT: Engineering -c- PROJECT: #32-96 Atlas Roofing PUD - Preliminary PLANNER: Mike Ludwig All comments must be received by: Monday, December 16, 1996 Atlas Roofing Pud - Preliminary review Dec 17, 1996 Site Plan - 1. The first two parking spaces need to be eliminated (one each side). The standard is 50 feet from the flowline, eliminating one space on each side does not meet this but will allow enough space for a car to sit waiting to get onto Taft Hill without blocking any of the parking spaces. 2. A half Row of 57.5 feet will not be required at this time if you are not plating, but it should tie planned for. The future building envelope needs to be behind this line. Alsc additional parking spaces will be lost at that time. 3. These plans show a future building envelope and indicate a future employee parking lot. What is being taken to the board for approval at this time? If you are wanting to get approval for those items at this time then they need to be addressed in the utility plans. Landscape Plan - 4. The trees being put in out along Taft Hill need to be planted in what will be the future parkway strip. Utility Plans - 5. The first two parking spaces need to be eliminated. (Continued on next page) Date: g Si nature CHECK: IF YOU WISH TO RECEIVE d LAT COPIES OF REVISIONS SITE H�LANDSCAPE r5l""UTILI Atlas Roofing Pud - Preliminary review (page 2 of 2) Dec 17, 1996 6. A copy of the existing plat needs to be provided as the second page of utility plan set. This needs to be a copy of the recorded plat not an improvement plat as was included with the submittal. If a plat is to be done with this project that plat would be the second page of the utility plan set. 7. Is there an easement for the ditch? The ditch company will need to sign off on the plans and on the plat if the property is being replatted. 8. If the future building and employee parking are to be approved with this project they need to be shown on the utility plan as the impervious surface effects stormwater calculations. C. One handicap parking space is required. It must be the closest space to the building if a 12' wide space is intended. Indicate this space on the Site Plan with a "H" and a ramp to the sidewalk. d. Any proposed signage must comply with the Residential Neighborhood Sign District of the City Sign Code. e. No parking may occur on "rock mulch" future parking areas. f. The west property line where "new driveway" is to be constructed will require landscaping, including trees. g. The General Landscape notes indicates two #9's. h. Please provide a plant list which includes species names, common names, quantities and sizes. Foundation plantings are needed around the buildings. 5. The Building Inspections Department offers the following comments: a. The site shall be accessible to persons with disabilities in accordance with Uniform Building Code Section 3103 and UBC Appendix Section 3106. Provide a designated and marked "accessible route of travel" between all the buildings on the site and building exits and entrances and the public way (public sidewalk). Accessible routes shall comply with ANSI A117.1-1992 with running slopes no greater than 1:20 and cross slopes no steeper than 1:50. Where routes cross lanes for vehicle traffic they shall be designated and marked as a cross walk. Provide parking and signs per Appendix Section 3107. Parking and access aisles shall comply with ANSI A117.1- 1992 with slopes no greater than 1:50 in any direction. b. Storage or use of hazardous materials must be in compliance with the Fire Code and Chapter 9 of the 1991 Uniform Building Code as adopted by the City of Fort Collins. A list of such materials with quantities and classifications is required as per All -Development Criteria A-2.18 "Hazardous Materials". Please submit four copies with revisions. 6. The Advance Planning Department stated that landscaping (trees and shrubs) are needed along the north and west property lines for to screen the site from adjacent residential uses. 7. The Water and Wastewater Utility offers the following comments: a. Please coordinate the Landscape Plan with civil design. Show water and sewer services on the Landscape Plan and provide required landscape separations (10 feet separation for trees from any mains or services, 4 feet separation for shrubs from any mains or services). b. Separate water and sewer services must be provided for each building. C. Please show the location of curb stops and meter pits. Curb stops and meter pits must be located in landscaped areas. d. Please refer to the redlined Landscape Plan which is attached for additional revisions that are needed. Please return the redlined plan with plan revisions. 8. The Mapping Department will need to see the Final Plat when a Final PUD is submitted. 9. Comments from the Engineering Department are attached. 10. Comments from the Stormwater Utility are attached. 11. The Current Planning Department offers the following comments: a. Please indicate all proposed building materials and colors. b. The Vicinity Map is not oriented correctly. Please turn so that north on the Vicinity Map is towards the top of the page. C. Please change the year from 1996 to 1997 on all Certification signature blocks. d. The Site Plan must show all adjacent roads and land uses (buildings, zoning, etc.) within 150' of the property lines of the subject property. e. The words "Signs" and "grantor" are spelled incorrectly in General Note #2 on the Site Plan. f. The words "expected" and "anticipated" are spelled incorrectly in General Note #3. g. The word "access" is spelled incorrectly in General Note #4. h. The word "existing" is spelled incorrectly three times in two notes on the Site Plan. The word "wood" is spelled incorrectly on the note pertaining to the 8' fence at the west property line. Please dimension the width of the sidewalk along Taft Hill Road. k. Please label the square footage of each addition on each building on the Site Plan and the Phase which it is proposed. The Land Use Breakdown data is confusing, please clarify. M. In order for Preliminary consideration to occur on a phase two expansion, the building footprint, area, and elevations must be provided at this time. Currently, only the building envelope is being shown. n. The Title Block on all sheets should reference the "Atlas Roofing PUD". o. Please number the Site Plan as "Sheet 1 of 3"; the Landscape Plan as "Sheet 2 of 3"; and the Building Elevations as "Sheet 3 of 3". P. Please designate existing and proposed landscaping on the plan. q. The word "Deciduous" is spelled incorrectly on the Landscape Plan. r. The word "edging" is spelled incorrectly in Note #4 on the Landscape Plan. S. The word "noted" is spelled incorrectly in Note #6 on the Landscape Plan. t. The word "separation" is spelled incorrectly twice in Note #8 on the Landscape Plan. U. The word "shall" is spelled incorrectly in the first Note #9 on the Landscape Plan. V. Please re -number the second Note #9 on the Landscape Plan revise it to react as follows: "All landscaping must be installed or secured with an irrevocable letter of credit, escrow, or performance bond for 125% of the valuation of the landscaping and installation as indicated on this plan prior to the issuance of a certificate of occupancy." W. The words "areas" and "reseeding" are spelled incorrectly in Landscape note 10. Please re -number this note. In addition, this note references adjacent areas. Does this mean off -site? If so, off -site easements must be provided. X. Note 7 on the Landscape Plan indicates that an irrigation system is not required. Who determined that this is not required? y. Please provide elevations of the proposed phase two expansion, including dimensions, building materials and colors. Z. Please provide dimensions, colors and materials of all elevations. aa. Please provide a bike rack near the entrance to the building for employees and/or customers. bb. Please provide a trash enclosure for a dumpster and recycling bin. cc. Criterion "a" of the Business Service Uses Point Chart is not applicable as explained on page 71 of the LDGS (project is less than 25,000 square feet, less than 25 employees). dd. Points are requested for Criterion "g" on the Business Service Uses Point Chart. However, no documentation supporting this request was submitted. The City's Model Energy Code has been updated. Method 2 as currently stated in the LDGS has not been updated to reflect this new energy code. City Staff will not award points for Energy Conservation unless the applicant exceeds provisions of the Model Energy Code as adopted by the City. Therefore, points will not be awarded under Method 2 of the LDGS. In order to gain points for energy conservation, the applicant must provide Certification by a professional engineer licensed in the State of Colorado that the annual energy consumption will be a certain percentage, less than the same building just meeting the minimum standard as defined in the Model Energy Code (Method 1, page 120 of the LDGS). Note: Without these points, the project fails to achieve 50% of the maximum applicable points on the Business Service Uses Point Chart. Failure to do so is grounds for recommendation of denial. Please either clarify or submit a variance request to the Business Service Uses Point Chart based upon the Variance Criteria of Section K (page 108) of the LDGS. ee. Please provide Planning Objectives which reference the specific policy number of the Land Use Policies Plan, Goals and Objectives, etc. This completes the review comments at this time. Additional comments may be forthcoming as the various departments and reviewing agencies continue to review this request. Please be aware of the following dates and deadlines to assure your ability to stay on schedule for the January 27, 1997 Planning and Zoning Board hearing: Plan revisions are due by 12:00 noon on January 8, 1997. Please contact me for the number of folded revisions required for each document. No revisions will be reviewed after the above deadline. If revisions are not received by this date, the, item will either go to the Planning and Zoning Board with a staff recommendation based on the originally submitted documents or the applicant will have the option -to continue the item to the next month's P&Z agenda. PMT's, renderings, and 8 folded copies of final revisions are due by 12:00 noon on January 21, 1997. **************************************************************************************************** Please contact me at 221-6206 if you have any questions or concerns related to these comments. I would like to schedule a meeting with you as soon as possible, if necessary, to discuss these comments. Sincerely, Michael Ludwig Project Planner xc: Sheri Wamhoff Stormwater Utility file/Project Planner PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: February 6, 1997 DEPT: Engineering PROJECT: REVISIONS #32-96 Atlas Roofing - Preliminary PLANNER: Mike Ludwig A11 comments must be received by: Atlas Roofing Pud - Preliminary review Plat - March 3, 1997 1. The additional Row (A half Row of 57.5 feet to meet current standards) will not be required at this time. Any future development on this site will require the dedication of the Row to current standards. Although we are not requiring it at this time you are welcome to dedicate it if you like. 2. Need to show the ditch easement and any other easements that may be needed. The ditch company will need to sign off on the plat. Utility Plans - 3 The site plan shows it but the utility plan does not show where the curb and gutter is to be replaced and new walk put in. This needs to be indicated on the plans. 4. Indicate the driveway width and it's location in relation to the property line. Label the sidewalk width from the street up to the building. ' �-J' Signature Date: �_: CHECK IF YOU WISH TO RECEIVE PLAT COPIES OF REVISIONS „❑ SITE ❑ , LANDSCAPE 0 UTILITY PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: February 6, 1997 DEPT: Engineering PROJECT: REVISIONS #32-96 Atlas Roofing - Preliminary PLANNER: Mike Ludwig All comments must be received by: Atlas Roofing Pud - Preliminary review Plat - March 3, 1997 1. The additional Row (A half Row of 57.5 feet to meet current standards) will not be required at this time. Any future development on this site will require the dedication of the Row to current standards. Although we are not requiring it at this time you are welcome to dedicate it if you like. 2. Need to show the ditch easement and any other easements that may be needed. The ditch company will need to sign off on the plat. Utility Plans - 3. The site plan shows it but the utility plan does not show where the curb and gutter is to be replaced and new walk put in. This needs to be indicated on the plans. 4. Indicate the driveway width and it's location in relation to the property line. 5. Label the sidewalk width from the street up to the building. Date: Signature L✓�-���� CHECK IF YOU WISH TO RECEIVE PLAT COPIES OF REVISIONS SITE ❑ LANDSCAPE UTILITY PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: April 22, 1997 DEPT: Engineering PROJECT: #32-96A Atlas Roofing P.U.D. - Final (LDGS) PLANNER: Mike Ludwig All comments must be received at the staff review meeting: Wednesday, May 21, 1997 Site / Landscape Plan 1. The curb stops and meter pits are shown differently than they are on the utility plans. Utility Plans 2. Sheets numbered 3, 4 and the plat (assume sheet 2) were received, but sheet 1 (cover sheet) was not. A cover sheet with the general notes is needed. 3. Show the easements on the utility plans 4. Label the where the existing curb cut is to be replaced with curb, gutter and walk. 5. Label the chain link fence and light pole as being removed. 6. Label the trash enclosure 7. Provide curb, gutter and sidewalk detail, driveway detail, and additions to sidewalk detail. Date: CHECK HERE IF YOU INISTH TO RECEIVE Plat _ Site hI Utility _Reline Utility COPIES OF REVISIONS _ Dra We Report Xl,an _ Oler mhr, xis City of Fort Collins