Loading...
HomeMy WebLinkAboutARAPAHOE FARM TOWNHOMES PUD - Filed GC-GENERAL CORRESPONDENCE - 2003-05-27J(`J��� r ,(ten.4 Jam/ 1. Arapahoe Farm Townhomes - what's the plan to reroute Harmony... Why? When? was it added later The rerouting of Harmony Road between Shields and Taft Hill to align Harmony with County Road 38E at Taft Hill, is planned to be constructed with the next phase of Woodridge development projects. The developer's engineer is designing the project now in preparation for submitting development plans this summer. We think the street construction will begin later this year or next year. Plans for rerouting Harmony have been developing over the last 14 years. Rerouted Harmony is shown on the City Master Street Plan adopted in 1981. It was also master planned 2 or 3 years ago with the Gates and Overlook at Woodridge development projects. Portions of rerouted Harmony Road have been built with the approved phases of Woodridge. The City already has most of the right of way by dedication and purchase. A bicycle and pedestrian underpass is planned for connection the area west of new Harmony for a safe route to the schools. Reasons for the rerouting of Harmony are as follows: (1) to eliminate the current dead end of Harmony at Taft Hill. (2) to eliminate a safty problem with anticipated heavy traffic using an existing intersection with steep slopes on -the approaches. (3) to align Harmony with County Road 38E, the main route to Horsetooth Reservoir, to enhance the value of Harmony Road as an arterial street. When rerouting is completed, existing Harmony Road west of the new Harmony will remain in service as a minor street. It will serve for westbound traffic wanting to go south on Taft Hill and, likewise, northbound Taft Hill Road traffic going east on Harmony. At the time property on the southeast corner of existing Harmony and Taft Hill develops, the old Harmony may be replaced with street connections through the development. The rerouting of Harmony has been planned for all along, not "added later." As mentioned above, commitments were made over the years and needed parts of new Harmony constructed with each phase. Let me know if you have any further questions. alr& a- X-%-O -. 0® S C A h E A DIVISION OF CEDAR SUPPLY FENCE & LANDSCAPE CONTRACTORS Tom and Ann Wilburton 4419 Hilburn Court Fort Collins, CO :B0524 August 11, 1994 RE: Wilburton Residence Additions to Landscaping Adjacent Bikepath. 1 . Soil Preparation; rip and till 4-6", incorporate 3 cubic yards compost per 1000 s.f. in sod area. Hand rake and match existing grade @ turf. Remove rock @ timbers. $550.00 2. Install 306 s.f. 1 " landscape rock over fabric. $235.00 3. Metal edging along fence, 110 L.F. $167.00 4,. Kentucky Bluegrass Sod, laid and fertilized, 1750 s.f. 1 112" $504.00 "; B&B, Spring Snow Crabapple, $ 220.00 ea. 89-99� j -6. Additions to irrigation system; Install 50' 1 " pvc mainline from existing manifold. Install 200' 5-strand control wire from existing controller in garage to proposed valve box. Add 3- spray zones to irrigate new sod. Rain Bird valves and spray heads. Pvc mainline and poly laterials. NOTE: Any damage due to construction will be billed extra. $1 ,040.00 7. 105' 3-rail standard privacy fence, 1 x6x6 'select' pickett. Fence tapers to 4' @ street. 105' @ $12.50. $1 ,31 3.00 TOTAL PROPOSAL: $4,689.00 + TAX EXCLUSIONS: 1 . City to provide grade to within 1 /10' 2. City to provide proper drainage away from house and to street. Respectfully Submitted, Tim Carver 7720 S. College Ave. Fort Collins, Colorado 80525 (303) 482-3717 Com- pity Planning and Environment Engineering Department City of Fort Collins August 29, 1994 TO: Jim Postle Tom and Ann Wilberton Steve and Jan Gottschalk Basil Hamdan Ted Shepard Ron Phillips Services FROM: Mike Herzig, Development Engineering Manager A*� RE: Arapahoe Farm Townhomes P.U.D. - Meeting of August 11, 1994 The attached is a summary of what I understand was agreed to by the parties at the meeting of August 11, 1994, regarding how the reconstruction of vacated Hilburn Drive would be completed by the developer. Please review the text and return your comments to me as soon as possible. If there are disagreements with my interpretation we may have to discuss these items further. In a conversation I had with Tom Wilberton last Friday, he asked for a change in how the new fence is constructed on the north side of the new walk. He would like to have the new fence constructed along the east property line of the development from the west end of the new fence north to the existing timber retaining wall (about 16 feet). In exchange he would agree to reduce the length of new fence paralleling the new walk at the east end by the same length. This would ]keep the agreed upon length of new fence to be constructed by the developer the same. If you have any questions please call me at 221-6750. 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6605 ARAPAHOE FARM TOWNHOMES P.U.D. Vacation of Hilburn Drive 8/29/94 The following is a summary of the agreements between the developer and the adjoining property owners that were made during the meeting held Thursday, August 11, 1994. 1. The fencing in the Hilburn Drive vacated area shall be installed 4 feet from each side of the new 5 foot wide walk. 2. The developer agrees to remove the existing fence on the Gottschalk property paralleling Hilburn Drive; reinstall the fence 4 feet south of the new walk and construct new fence needed to make the fence whole. The new portion of fence shall be the same as the existing fence. The fence construction will be done by a reputable fence company in Forst Collins. 3. The developer agrees to construct a new fence paralleling the new walk in vacated Hilburn Drive 4 feet north of the walk from the front of the Wilberton property, in line with the front of the house, to the rear property line bordering the east property line of the development. The fence will match the fence constructed for the Gottschalk and, also, be constructed by a reputable fence company in Forst Collins. 4. The developer agrees to grade the vacated street area to match the landscaped areas of the Wilberton and Gottschalk properties. In addition the developer shall grade onto the Gottschalk property to tie into the predominantly existing grade of the Gottschalk backyard and maintain grading out to the new fence to be "ergonomically acceptable" for usability of the backyard (bust not necessarily flat). Then the grade shall be sloped to the new walk at no more than a 4:1 slope (the maximum allowed slope for City standards). Grading on the north side of the new walk shall be done so that no ponding will be created on the existing landscaped area of 'the Wilberton property nor on the newly graded area, and, in addition, grading to add elevation to meet the grade of the developer's property shall begin, heading west, at the timber planter/retaining wall and shall not in any location top the the wall. 5. The developer agrees to install new sprinkler system in the vacated street area. The new system will tie into the Gottschalk's and Wilberton's existing systems with the new walk being the dividing line between the two systems. The tie ins shall be done professionally in a workperson like manner. 6. The developer agrees to sod all graded areas to match the existing grass areas on the Gottschalks and Wilbertons properties. 7 The developer agrees to restore any existing landscaping disturbed by the construction operation. 8. The Gottschalks and the Wilbertons will allow the developer onto their property to perform all of the above described work. hap Requirements of the developer by the City mentioned in the meeting were as follows: 1. The developer shall install the berm and the swales along the east property line of the development with the first phase of three phases in the development. 2. A swale must be formed off of the new walk in the vacated street area to direct storm runoff through a sidewal chase under the new sidewalk of Hilburn Court. Commi `y Planning and Environmental Planning Department August 30, 1994 James Postle, President James Company 2919 Valmont Road, Suite 109 Boulder, CO 80301 Dear Jim, +vices I have tried to call you at the office and on your mobile phone this morning, but have not been successful in reaching you. I wanted to discuss our response to your request with you before writing it down, but this is the next best thing. The City Engineering Department will be able to approve your final plans for the removal of the Hilburn stub street and landscaping improvements as soon as you and the adjacent property owners agree to the improvements on Hilburn Drive, RBD completes the changes in the plans and adds the required notes, and the utility plans are approved. Hopefully, this will occur this week. In addition, your signature is needed on the Development Agreement. In reference to the second reading for the vacation of Hilburn Drive, we believe it is best to schedule that for the! October 4th Council meeting. It is the opinion of the City Attorney that ownership changes upon the effective date of that ordinance, not when the documents are recorded. Furthermore, once the ordinance goes into effect, anyone can obtain a certified copy of it and record it with the County Clerk and Recorder. We feel it is important that your work on Hilburn Drive be substantially completed before the ordinance becomes effective so you will be on City owned property, not on privately owned property. We are trying to avoid any further conflicts with adjacent property owners. If the second reading; of the vacation ordinance is adopted on October 4th, the ordinance will be effective on October 14, which coincides with your estimated completion date. Building permits for Phase I could then be issued. We would suggest applying for the building permits well in advance so that the Building Department will have sufficient time to review the plans and be ready to issue the permits as soon as the street vacation is effective. ?81 North Cole e .avenue • P.O. Box 380 Fort Collins, CO 80522-0580 • (303) 221-61 FAX (303) 221-6378 TDD (303) 224-6002 James Postle page 2 August 30, 1994 I know this has been a difficult process, but hope that we are close to the culmination. Please let me know if you have further concerns. Sincerely, /~Rondall V. Phillips Planning Director cc: Paul Eckman Bob Blanchard Mike Herzig; Felix Lee Lucia Liley ARTHUR E. MARCH, JR. RAMSEY D. MYATT R O B E R T W BRANDIES, J R. RICHARD S. GAST LUCIA A. LILEY J. BRADFORD MARCH LINDA S. MILLER WILLIAM C. BEYERS JEFFREY J. JOHNSON MAIRCH & MYATT, P.C. ATTORNEYS AND COUNSELORS AT LAW 110 EAST OAK STREET FORT COLLINS, COLORADO 80524-2880 (303) 482-4322 TELECOPIER (303) 462-3038 August 29, 1994 Paul Eckman, Esq. City Attorney's Office City of Fort Collins P. O. Box 580 Fort Collins, CO 80522-0580 Mr. Ron Phillips Planning Department City of Fort Collins P. O. Box 580 Fort Collins, CO 80522-0580 RE: Arapahoe Farms PUD Dear Paul and Ron: ARTHUR E. MARCH 1909-1981 MAILING ADDRESS: P.O. BOX 469 FORT COLLINS. CO 80522-0469 VIA TELEFAX TO 221-6327 AND U. S. MAIL VIA TELEFAX TO 221-6378 AND U. S. MAIL This letter is to confirm my understanding of the process discussed by Jim Postle and Ron to enable the James Company to develop Arapahoe Farms PUD. The second reading of the vacation ordinance will be scheduled for the September 20th Council meeting. Upon approval, the vaca- tion documents will be held by the City Clerk until all improve- ments associated with the vacation are completed, at which time the documents will be recorded. Upon approval of the final utility plans by City staff, Jim will immediately begin the improvements of the vacated area and anticipates completion within 45 days. Concurrently with these improvements, but only subsequent to approval of the vacation on second reading, Jim can pull building permits and begin construction of Phase 1 improvements. If the above summary is not consistent with your understand- ing, please let me know immediately. Thanks for your assistance. Sincerely, MARCH & MYATT, P.C. By: Ludt A. L. LAL/glr cc: Jim Postle August 29, 1994 TO: Jim Postle Tom and Ann Wilberton Steve and Jan Gottschalk Basil Hamdan Ted Shepard Ron Phillips FROM: Mike Herzig, Development Engineering Manager i RE: Arapahoe Farm Townhomes P.U.D. - Meeting of August 11, 1994 The attached is a summary of what I understand was agreed to by the parties at the meeting of August 11, 1994, regarding how the reconstruction of vacated Hilburn Drive would be completed by the developer. Please review the text and return your comments to me as soon as possible. If there are disagreements with my interpretation we may have to discuss these items further. In a conversation I had with Tom Wilberton last Friday, he asked for a change in how the new fence is constructed on the north side of the new walk. He would like to have the new fence constructed along the east property line of the development from the west end of the new fence north to the existing timber retaining wall (about 16 feet). In exchange he would agree to reduce the length of new fence paralleling the new walk at the east end by the same length. This would keep the agreed upon length of new fence to be constructed by the developer the same. If you have any questions please call me at 221-6750. _?'�1 C'oile�;e Avenue • ".0. Box ;RO Fort Collins, CO H0�22 (15RO (3(13) 221-6605 MEETING AGENDA AUGUST 11, 1994 PURPOSE: To discus and resolve the issues between the developer and the affected neighbors for the Arapahoe Farms Townhomes. Determine who does what and who pays. n r t (u�l( ^i�_ 1 ��-�^ram AGENDA: * Drainage into Dean Hoag/,property - Swale adequate? - Berm necessary? c'``' ! �2--.Y . Hillbu4rive vacation - Removal of the street and fire hydrant + A— - Restoring area - Grading on Gottschalk land - Fence replaced or moved Existing landscaping restoredC o j" �- Sprinkler heads adjusted - Seeding vs sodding ��- New sprinklers L , c ,I 7-t 0J �; a Retaining waliy,(grading against the wall) - New fencing next to walk - m<� A,� - Drainage from development to Hillburn Court + Channel to center of property + Underwalk drain + Easement TIME LIMIT: 90 miniutes, then adjourn to next meeting. :13D Inc. ENGINEERING CONSULTANTS 209 South Meldrum Street Fort Collins, CO 80521 303/482-5922 FAX 482-6368 September 22, 1994 Mr. Mike Herzig Community Planning and Environmental Services City of Fort Collins Planning Department 381 North College Avenue Fort Collins, Colorado 80522-0580 Re: Arapahoe Farms Townhomes P.U.D. Street Oversizing Cost Estimate Dear Mike, The estimate of cost for street oversizing has been completed amounting to $19,668. The attached sheet shows the itemization of costs for your reference. Very Truly Yours, RBD, INC. � �Zzx�' � - ,, )-h /TerrAiCE20 nan '7 ARAPAHOE FARM TOWNHOMES FINAL PUD PROPERTY DESCRIPTION February 7, 1994 A tract of land located in the Southwest Quarter of Section 34, Township 7 North, Range 69 West of the 6th Principal Meridian, City of Fort Collins, Larimer County, Colorado, being more particularly described as follows: Considering the South line of the Southwest Quarter of said Section 34 as bearing, South 89 ° 53'42" West from a 3" Aluminum Cap in a Range Box at the South Quarter corner to a steel rod in a pipe at the Southwest corner of said Section 34 and with all bearings contained herein relative thereto: Commencing at the South Quarter corner of said Section 34; thence along the East line of said Southwest Quarter, North 00003" 8" West, 60.00 feet to the North right-of-way line of Harmony Road, said point being the POINT OF BEGINNING; thence along said North right-of- way line, South 89053'42" West, 201.76 feet to a point on a curve concave to the North having a central angle of 29058'26", a radius of 1015.00 feet and the chord of which bears North 75007'05" West, 524.96 feet; thence along said North right-of-way line and the arc of said curve 530.99 feet to a point on a curve concave to the East having a central angle of 92032'03", a radius of 11.00 feet and the chord of which bears North 13151'51" West, 15.90 feet; thence along the arc of said curve 17.77 feet to a point on the southerly right-of- way line of Seneca Street; thence along said southerly right-of-way line the following 4 courses and distances, North 32024'1 1" East, 343.39 feet to a point on a curve concave to the Southeast having a central angle of 32032'33", a radius of 508.00 feet and the chord of which bears North 48140'28" East, 284.67 feet; thence along the arc of said curve 288.53 feet; thence, North 64056'44" East, 260.20 feet to a point on a curve concave to the Northwest having a central angle of 02149'21 ", a radius of 1784.00 feet and the chord of which bears North 63032'04" East, 87.88 feet; thence along the arc of said curve 87.89 feet to a point on the East line of the Southwest Quarter of Section 34; thence along said East line, South 00003" 8" East, 777.14 feet to the Point of Beginning. The above described tract of land contains 8.510 acres and is subject to all easements and rights -of -way now on record or existing. RMINC Engineering Consultants CLIENT JC JOB NO. -0f-7I PROJECT �1 ���L�%�'�!! �/'���u s r CALCULATIONSFOR 0V?g�1e5l1 Z f &)6 CLS l S MADEBY Pl-A DATE 1-Z2"!CHECKED BY DATE SHEETOF ARAPAHOE FARMS TOWNHOMES P.U.D. PRELIMINARY OPINION OF PROBABLE COST ITEM EST. UNIT NO. DESCRIPTION QTY. UNIT COST COST ROADWAY CONSTRUCTION FOR DEVELOPERS RESPONSIBILITY Pavement Prime Coat 340 SY 0.35 $119 Tack Coat 340 SY 0.20 $68 10" Asphalt Pvmt (1 /2 Harmony Rd.) 340 SY 14.00 $4,754 Scarify and Compact Subgrade 340 SY 1.00 $340 Curb & Gutter -- Sidewalk 6" Vertical Curb w/ 2.0' Gutter 750 LF 10.00 $7,500 Median Curb w/ 1.0' Gutter (N. 1/2 of Harmony) 0 LF 7.00 $0 4' Wide Concrete Walk (4" Thick X 732' Long) 2928 SF 2.50 $7,320 SUBTOTAL 10% CONTINGENCIES TOTAL OPINION OF PROBABLE ROADWAY COST: NOTE: Because ENGINEER has no control over the cost of labor, materials, equipment or services furnished by others, or over the Contractors' methods of determining prices, or over competitive bidding or market conditions, his opinions of probable Project Cost and Construction Cost provided herein are to be made on the basis of his experience and qualifications and represent his best judgement as an experienced and qualified professional engineer, familiar with the construction industry; but ENGINEER cannot and does not guarantee that proposals, bids or actual Project or Construction Cost will not vary from opinions of probable cost prepared by him. If prior to the Bidding or Negotiating phase OWNER wishes greater assurance as to Project or Construction Cost, he should employ an independent cost estimator. Page 1 $20,100 $2,010 $22,110 22-Sep-94 ARAPAHOE FARMS TOWNHOMES P.U.D. 22-Sep-94 PRELIMINARY OPINION OF PROBABLE COST ITEM EST. UNIT NO. DESCRIPTION QTY. UNIT COST COST TOTAL ROADWAY CONSTRUCTION FOR N. 1 /2 OF HARMONY RD. Pavement Prime Coat 927 SY 0.35 $324 Tack Coat 927 SY 0.20 $185 10" Asphalt Pvrrit (1 /2 Harmony Rd.) 927 SY 14.00 $12,978 Scarify and Compact Subgrade 927 SY 1.00 $927 Curb & Gutter -- Sidewalk 6" Vertical Curb w/ 2.0' Gutter 750 LF 10.00 $7,500 Median Curb w/ 1.0' Gutter (N. 1/2 of Harmony) 465 LF 7.00 $3,255 7' Wide Concrete Walk (4" Thick x 732' Long) 5124 SF 2.50 $12,810 SUBTOTAL $37,980 10% CONTINGENCIES $3,798 TOTAL OPINION OF PROBABLE ROADWAY COST: $41,778 NOTE: Because ENGINEER has no control over the cost of labor, materials, equipment or services furnished by others, or over the Contractors' methods of determining prices, or over competitive bidding or market conditions, his opinions of probable Project Cost and Construction Cost provided herein are to be made on the basis of his experience and qualifications and represent his best judgement as an experienced and qualified professional engineer, familiar with the construction industry; but ENGINEER cannot and does not guarantee that proposals, bids or actual Project or Construction Cost will not vary from opinions of probable cost prepared by him. If prior to the Bidding or Negotiating phase OWNER wishes greater assurance as to Project or Construction Cost, he should employ an independent cost estimator. Page 2 August 29, 1994 TO: Jim Postle Tom and Ann Wilberton Steve and Jan Gottschalk Basil Hamdan Ted Shepard Ron Phillips FROM: Mike Herzig, Development Engineering Manager A RE: Arapahoe Farm Townhomes P.U.D. - Meeting of August 11, 1994 The attached is a summary of what I understand was agreed to by the parties at the meeting of August 11, 1994, regarding how the reconstruction of vacated Hilburn Drive would be completed by the developer. Please review the text and return your comments to me as soon as possible. If there are disagreements with my interpretation we may have to discuss these items further. In a conversation I had with Tom Wilberton last Friday, he asked for a change in how the new fence is constructed on the north side of the new walk. He would like to have the new fence constructed along the east property line of the development from the west end of the new fence north to the existing timber retaining wall (about 16 feet). In exchange he would agree to reduce the length of new fence paralleling the new walk at the east end by the same length. This would keep the agreed upon length of new fence to be constructed b,y the developer the same. If you have any questions please call me at 221-6750. 281 North College Avenue • F.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6605 JamesCompany 2919 Valmont Road, Suite 109 Boulder Colorado 80301 (303)443-6666 0J September 14, 1994 Mr. Michael Herzig City of Ft. Collins Engineering Department 281 North College Ave. Fort Collins, CO 80522 RE: Arapahoe Farm Townhomes - Phase 1 Foundation only Building Permits Dear Mike: I spoke with Steve Gottschalk and Ann Wilberton yesterday about any opposition they might have to The James Company beginning foundation work in the first phase of our project. I explained that the city would be issuing "Foundation Only" permits of this time ano than we would only be issued complete building permits when the work: on Hilburn Drive had. progressed to a mutually satisfactor\1 point. Both Ann and Steve agreed that th-:s would be fair as long as work started this week and moved along at a reasonable pace (as I have outlined in the attached schedule). I spoke with Connell Resources this morning and removal of the existing asphalt street section and sidewalk is beginning today. I am requesting the release of any holds you may have on our building permit applications so that the Building Department can issue "Foundation Only permits at this time. Thank you for your cooperation in this matter. Sincerely, Cra Constant Steve and Jan Gottschalk The James Company ��/eGrrlE17 F/77' cc�o� SR�'S{'AC'1oPy 7"i'o✓t aF.f,/-�f3��� D4I've w;rA;h /ocllys oP1q,,74cXe 0 S��ieoluCe. Sr9Tr'SFAe%,I/ lom,4le��o4 �. de7-cr„i 4er> b� C�re/IonS F aoTsc>7p(�'S. Tom and Ann WiIb on JamesCompany 2919 Valmont Road, Suite 109 Boulder, Colorado 80301 (303)443-6666 I�1 Michael Hertzig City of Ft. Collins Engineering Department 281 North College Avenue Fort Collins, Colorado 80522 January11, 1995 RE: ARAPAHOE FARM TOWNHOMES — HILBURN DRIVE IMPROVEMENTS Dear Mike: As the two neighbors directly affected by the vacation of the Hilburn Drive, we are satisfied that James Company has met their obligation in terms of completing the landscaping and street improvements to our satisfaction. On this basis, we would ask you that you now complete the vacation of Hilburn Drive as previously agreed. Sincerely, / ASteve4�J�anGottschalk: eanPdAZnn Wilberton .1Pmh. af D � — q Commurury Planning and Environmental Services Planning Department City of Fort Collins March 8, 1994 Mr. Jim Postle The James Company c/o Cityscape Urban Design 3555 Stanford Road, Suite 105 Fort Collins, CO 80525 RE: vacation of Hilburn Drive Dear Mr. Postle: As you are aware, the request for Arapahoe Farm Townhomes does not require the use of Hilburn Drive, west of Hilburn Court, as originally envisioned on the 0.D.P.Is for Arapahoe Farm and Regency Park. This will result in Hilburn Drive being a dead-end and not needed for public street purposes. The City of :Fort Collins will not allow the dead-end portion of Hilburn Drive to remain and thus requires the vacation of the public right-of-way. Vacation of public streets must be approved by two readings of City Council. According to City Code and state statute, vacation of a public right-of-way (54 feet) results in one-half of the affected right-of-way (27 feet) reverting back to the two adjacent property owners. The procedure for vacating a public street is outlined in the Development Manual and the consideration by City Council is coordinated by the Development Review Center. In addition to the vacation procedure, the developer of Arapahoe Farm Townhomes will be required to remove existing pavement, curb, gutter, and sidewalk. A new sidewalk, curb, and gutter will be required to be constructed in a north -south direction to connect the two ends of Hilburn Court. The developer will also be required to grade the surface and seed for erosion control. Such grading shall ensure that there are no low spots and that there is positive drainage out to Hilburn Court. All affected[ utilities must be abandon according to the specifications and procedures of the utility providers. In particular, the existing fire hydrant must be relocated in accordance with both Water and Wastewater Utility and Poudre Fire Authority. 281 .'North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750 The demolition and removal of existing improvements, and the grading, seeding, and reconstruction of improvements will be made part of the utility plans for the Arapahoe Farm Townhomes P.U.D. If you have any questions regarding vacation of Hilburn Drive., please do not hesitate to call Mike Herzig, Development Review Engineer, Development Review Center, 221-6750. Sincerely: Td..--JAZ�j Ted Shepard xc: Mike Herzig, Development Review Engineer Steve Gottschalk, 4505 Hilburn Court, Fort Collins, CO. 80526 Tom Wilberton, 4419 Hilburn Court, Fort Collins, CO. 80526. 5-17-94 Estimate Rock Brothers Fort Collins, Colorado The following is an estimate from the Rock Brothers Landscaping company in Fort Collins Colorado regarding an estimate for moving landscaping and fence, landscapinand undergrotuul sprinkling systems at 4. ()� IHIVnru Court. Tliis estimate teas made at the request of Steven Gottschalk the resident at this address and is with regard to the vacating of Hilburn Drive. adioining the. ( iottschalk property 27' to the North. fluis estimate is only relating tit the cost on the Gottschalk side Of the street and would probably double to include the Wilberton property. 100 ft New fence...................................................$1550.00 Extend the Under€;roud Sprinkler system ............ $1500.00 Plants, Landscape., Fabric materials .....................$1000.00 Gravel & Misc material ......................................... $ 500.00 1500 sq ft Grass ..................................................... $ 750.00 TOTAL $5300.00 ------ _____--------- ____= HPDesk Local Print for Mike HERZIG Start of Item 2. Message. Dated: 05/19/94 at 1352. Subject: Hilburn Court Vacation Sender: Patty HAUGHEY / CFC52/01 Contents: 2. CC: Mike HERZIG / CFC52/01 Part 1. FROM: Greg BYRNE / CFC52/01 TO: Kerrie ASHBECK / CFC52/01 CC: Gary DIEDE / CFC52/01 Joe FRANK / CFC:52 / 01 Mike HERZIG / C:FC52/01 Ron PHILLIPS / CFC52/01 Part 2. Kerrie - Please prepare a memorandum to Council before the second reading of the Hilburn Court vacation outlining what the City can do for the neighbors and what will be requi Development Agreement. Thanks, Greg End of Item 2. HPDesk Local Print for Patty HAUGHEY Start of Item 2. Message. Subject: Hilburn Court Vacation Sender: Patty HAUGHEY / CFC52/01 TO: Greg BYRNE / CFC52,/01 Part 1. FROM: Patty HAUGHEY / CFC52/01 TO: Greg BYRNE / CFC.52/01 Part 2. Part 3. TO: Patty HAUGHEY / CFC52/01 Part 4. Greg, Dated: 05/24/94 at 1142. Contents: 4. It will be a few months before the second reading of the Hillburn vacation returns to City Council. We are still reviewing the utility plans and allowing the two neighbors to review them, also. So far the plans are not detailed enough to be acceptable. Following completion of the plans, the developer will have to remove the street and construct the improvements before we complete the vacation (second reading). I have let the neighbors know that what we are able to require of the developer will not likely be as much as they want. Only if the developer has to get on the neighboring property will they gain any leverage to ask for landscaping, sprinklers and fences. We will do all that we can to make sure the developer does what he is supposed to do without trespassing or damaging the neighbors' properties. We will know better what will be done when the plans are complete. Do you want to relay this information to City Council now rather than wait for second reading of the vacation? Please let me know. Mike End of Item 2. 4418 Craig Drive Fort Collins, Co. 80526 July 21, 1994 Planning and Zoning Board City of Ft. Collins 300 LaPorte Avenue Fort Collins, Co. 80521 To the Board Members: This letter is being hand delivered because of the shortage of time before your meeting on Monday, July 25, 1994. I am writing in referral to item 19 on the Consent Agenda for this meeting. One of our residents of Regency Par after much effort, was informed that this item reading "155-87 L ARAPAHOE FARMS TOWNHOMES - REFERRAL OF AN ADMINISTRATIVE CHANGE Referral of an administrative change to modify a condition of final approval, located at the northeast corner of Harmony and Seneca, zoned rip, Low Density Planned Residential", means the developer would be issued a building permit but not the Certificate of Occupancy until the issue of Hilburn Court is resolved. He was supposed to resolve this issue BEFORE receiving a building permit! Firstly, your own definition of Consent Agenda (The Consent Agenda consists of items with no known opposition or concern) does NOT fit this particular item! It has been known by the Planning and Zoning Board, the City Council, and the Developer that there are serious objections to this situation. If the developer is allowed to leave the Hilburn Court problem unresolved now, what is to keep him from leaving it unresolved at the end of the project??? I do not live at that particular corner, but I clearly would not trust that the situation will be remedied given the past recored of non -notice to us concerning this property. (This property was rezoned without Regency Park residents being notified.) We also weren't notified about this incident and it appears someone "forgot" to call us! DO NOT allow Hilburn Court to be delayed longer. It is clear to us that we WILL be the loosers! * This is apparently not the only condition of final approval that is being changed. T •. -- ,, ... -A& % ---zr3t'c,-d `-hat ii ucvoa' iper Was to work with Regency Park and take our input in choosing roofing materials. That hasn't happened either and I'd like to request compliance with the original conditions for approval! Asphalt shingles are to be approved!?!?!? Why are developers NOT repremanded when they do things wrong? He even started moving dirt without a permit and we had to call the city (which took four days to correct the situation). We have been told people are bending over backwards to work with us, but we have followed all your guidelines and rules. It is the system which has not followed its' own rules! WE are the residents of Fort Collins, not this Boulder developer. PLEASE represent US!!! Sincerely, 9 Marth4 Scheiwe cc: Mayor Ann Azari, Mike Herzig, Jerry Horak, Chris Kneeland Nan McClurg, Ron Phillips, Ted Shepard, Anne Wilburton, and the City Attorney. 7-29-94 To: Mr. Jim Postle c/o The James Company 2919 Valmont Road, Suite 109 Boulder. Colorado 80301 From: The Gottschalks 4505 Hilburn Ct. Fort Collins, Colorado Dear Mr_ Postle, Wilbertons 4419 Hilburn Ct. 80526 Fort Collins, Colorado 80526 In spite of many assurances by the City of Fort Collins Planning, City Attorney, City Manager, etc... that you would get together with us on the question of improvements and restoration reLardiric the vacation of Hilburn Drive we have not heard from you. We are sure you are most anxious to proceed with the Arapahoe Townhome project. This matter needs to, be resolved before you will be issued a building permit and commence the project. We are also ca'ger to 'ecl, this settled as quickly as possible and would appreciate hearing from you by Aug the. 14th. At the May 17th meeting of city council Mr.Roy envisioned a mediating session between you and the neighbors affected by this vacation procedure. This would certainly give us all the chance to see what is appropriate and what agreement can be reached. Yours in good faith, Steven F. Gottschalk Resident 4505 Hilburn Ct. Fort Collins, Colorado 80526 cc: Mr. Ted Shepard Mr. Ron Phillips Mr_ Mike Herzig Mr. Roy, City Attorney Ann Wilberton Resident 4419 Hlburn Ct. Fort Collins, Colorado 80526 Mr. Bernie Strom Mr. Eldon Ward