HomeMy WebLinkAbout140 W MULBERRY ST - SPECIAL INSPECTIONS - 3/15/2014MAX Field Construction Office
3000 South College Ave., Suite 201
Fort Collins, CO 80526
fcgov.com/maxconstruction
Delivery by hand
March 15, 2014
City of Fort Collins 1 +0
Building Services
281 North College Avenue
Fort Collins, CO 80524 I
Subject: MAX BRT — Building Permit No. B1300301— Mulberry northbound station
Bus Stop and Station Specialty Inspections
To whom it may concern:
The MAX BRT stations and stops are nearing final completion. As such, this letter shall serve as a i.
general compliance letter to certify the project was constructed in conformance with the approved plans
and specifications and applicable building code. This work includes:
1. Utility installation including electrical, irrigation and communications
2. Subgrade preparation
3. Light pole footing/foundation installation
4. Concrete flatwork paving
5. Structural framing; structural steel, roofing, cladding and connections
6. Surface restoration including architectural concrete paver installation
7. Site amenity installation
Personnel from the City of Fort Collins Engineering Department and Ditesco have jointly inspected; the
construction work. Deficiencies identified during construction have been corrected and accepted. ,Record
drawing information has been documented and will be transferred to final drawings for City of Fort Collins
Engineering Departmental use.
If you require any further information or supporting documentation, please contact me at 970-988-8605 or
keith.meyer .ditescoservices.com.
Sincer
KeMeye , PV. S b'49
�ryO
-76
A 6+Fi.�
Cc: Erika Keeton, PE — Cii bf Fort Collins Engineering Department
Ryan Dickinson — Concrete Express, Inc.
file
Page 1 of 1
0
Magnetic Particle Examination CTL I THOMPSO1.N
p®
of Welds Report � .,
CLIENT: _ . JOB NUMBER:
PROJECT: tA.cL9oV !',)A CT. Gn�s��r % DATE:
LOCATION (' "P*OA
WELD LOCATION AND IDENTIFICATION SKETCH
Weld identification _
Material thickness �4 1-0 `y-V
Weld joint AW5 _.
Welding process 61G��✓
Quality requlrements - section no.
Remarks.—
' I _
Interpretation Repairs
Date Weld Ideliiification Area Accept Reject Accept Reject Remarks
I •
- t4 r V� J r
6
The above welds were prepared and tested in accordance with the requirements of the American Welding Society AWS D1.1
{_zg.,47 ) Structural Welding Code.
AJlanufacturer or contractor 4�,AL
fJ{el d of Inspection: �.
_ Qry ' ' Wet J Residual Continuous ❑ AC I- DC Half -wave
FIELD COPY TO TECHNICIAN
_.. _ LEVEL
WELD / BOLT INSPECTION REPORT SUMMARY
Client Dame; CH2M HILL, INC. Inspection Date: 04/22/2013
Project: MAX BUS RAPID TRANSIT
Project Number: FC05942.000
Report Number: 4
TYPE OF INSPECTION / APPLICABLE CODE
O Visual Weld
AWS 131.1-02 Table 6.1
❑ Magnetic Particle Weld
AWS 131.1-02 Sect. 6.10
❑ Liquid Dye Penetrant Weld
AWS 131.1-02 Sect. 6.10
Location and Description of Work:
WELDS
Field Rep: ALLEN BARTON
❑ Ultrasonic Weld ❑ Decking
AWS D1.1-02 Sect. 6.13 AWS 131.3-02 Sect. 4.5
❑ High Strength Bolt AISC Spec. for Structural
Joints Using ASTM A 325 or A490 Bolts, Sect. 8 & 9.
❑ Anchor Bolts
Project Specifications
We performed a -visual inspection of the welded connections for the shop -fabricated assembly Icon A60 at CDI's shop in
Denver.. We also performed a magnetic particle inspection on 10% of the A60 assembly. Please refer to the attached
Magnetic Particle Examination of Welds Report for details. Plans were prepared by SSS, project no. 1552, dated
3/14113.
BOLTS
At the time of our inspection, the items observed met the quality standards sited above unless noted below.
❑ Discrepancies were observed, please see the attached Outstanding Discrepancies list.
Specific information is presented on the following inspection reports.
351 Linden Street I Suite 1401 Fort Collins, CO 805241 Phone: 970-206-94551 Fax: 970-206-9441
Magnetic Particle Examination cTL I THOMPSON
of Welds Report
CLIENT: JOB NUMBER: l�G-C1Z���
PROJECT: /_W _ZrfX `A. �d/��Iyr_ DATE: y� u -
LOCATION:
WELD LOCATION AND IDENTIFICATION SKETCH
Weld IdentificationZO!✓
Material thickness MOMAWA
Weld joint AWS.
Welding process Forr"A
Quality requirements -section no.
Remarks _
®a■
I0
Remarks
The above welds were prepared and tested in accordance with the requirements of the American Welding Society AWS 131.1,
( LO/ B ) Structural': Welding Code.
Manufacturer or contractor
75D
od of Inspection:
ry ❑ Wet Z) Residual Continuous O AC C' OC I'7 Half -wave
FIELD COPY TO _,. _ TECHNICIAN %� I���/rB
LEVEL .. 77� _
dilesco
BUILDING INSPECTION RECORD
Mulberry NB Station
Owner:
City of Fort Collins — Engineering
Department
Contact:
Erika Keeton
Project Name:
Mason Corridor — MAX BRT
Project Number:
7332
Local Building Official:
City of Fort Collins
Building Permit No:
B1300301
Architect/Engineer:
Michael Baker
Type of Construction:
ll-B
Contractors: General:
Concrete Express, Inc.
Occupancy Classifications:
U-Occupancy
Electrical:
Sturgeon Electric
Total Bldg Area:
162 ft2
Mechanical: N/A
Plumbing:
N/A
Building General
Date
I Inspector
❑x Footings/Foundations .
Comments: Completed under separate inspection record.
5/3/13
JB/CTL
❑ Concrete Slab / Under -Floor.
Comments: N/A
N/A
N/A
•
❑x Light Gauge Framing:
Comments: Steel Studs
5/9/13
JB
x❑ Sheathing
Comments: Plywood Sheathing
5/9/13 .
JB
❑
Fire -Resistant Penetrations
Comments:
N/A
N/A
N/A
❑
Mechanical/Energy Efficiency ...
Comments:
N/A
N/A
N/A
❑x
Roofing
Comments:
Sheet Metal Roof
3/12/14
JB
Other :.
Comments:
N/A
N/A
N/A
❑
Final
Comments:
Building complete and fully accepted.
N/A
N/A
Special
Date
Inspector
❑
Bolt/Weld Inspection
Comments:
Visual weld inspection. Bolt inspection completed under separate inspection record.
5/10/13 .
CTL
❑
Special Structural Concrete.
Comments:
N/A
i
N/A
N/A
❑
Masonry.......•
Comments:
N/A
N/A
N/A
❑
Wood
Comments:
N/A
N/A
N/A
❑
Soils/Foundations .
Comments:
Building excavation completed in in -situ materials and inspected prior to installation
4/26/13
JB
❑
Spray -Applied Fireproofing
Comments•
N/A N/A N/A
❑ Control Systems .
Page 1 of 2
Comments: N/A N/A N/A
❑ Other
Comments:
Electrical
Date
Inspector
❑ Underground .
Comments: Completed under separate inspection record by City of Fort Collins. N/A N/A
❑ .Rough Walls..
Comments: Completed under separate inspection record by City of Fort Collins. N/A N/A
❑ Rough Ceilings......
Comments: Completed under separate inspection record by City of Fort Collins. N/A N/A
Final ........
Comments: Completed under separate inspection record by City of Fort Collins. N/A N/A
Plumbing I
Date
Inspector
❑ Underground ... .
Comments: N/A N/A N/A
❑ Gas
Comments: N/A N/A N/A
❑ Interior Water ....: .
Comments: N/A N/A N/A
'..Interior DWV
Comments: N/A N/A N/A
❑ Final ' .:..:;;:..:...
Comments: N/A N/A N/A
Fire Suppression and Alarm Inspection by local.jurisdiction
N/A
N/A
Elevator by local jurisdiction or special consultant
N/A
N/A
Note: See attached photographs for further installation record.
See daily reports for detailed account of construction progress.
I MG_1607
I MG_1608
IMG_1943
IMG_2575
IMG_2577
00f�flrri
3`
7 Fl y
7 �? 76
(S" Ir0 AG1G7Gi 7�G6;�R yw
Architect/Engineer Certification
The stamp affixed hereto certifies installation of
the marked items in general conformance with the
approved project technical specifications and
drawings.
Page 2 of 2
CH2M HILL, INC.
9191 S. JAMAICA STREET
ENGLEWOOD CO 80112
LETTER OF TRANSMITTAL
Date: WEDNESDAY, APRIL 24, 2013
Project: MAX BUS RAPID TRANSIT
Project No: FC05942.000
WE ARE TRANSMITTING: Weld and/or Bolt Inspection Results
COPIES MAILED TO:
0 L/C
CTL T on, Inc
o cr•;'
.�
3 3
WYN
REGI
351 Linden Street I Suite 140 1 Fort Collins, CO 80524 I Phone: 970-206-94551 Fax: 970-206-9441
fti."i'1V'C'O�Ft�P+O'iRxA Ti-E+D'.,: xs
CH2M HILL, INC.
9191 S. JAMAICA STREET
ENGLEWOOD CO 80112
Date: 0710112013
Report ID: K92718 - FC05942.000
Report of Concrete Compressive Strength Tests
Project: MAX BUS RAPID TRANSIT Supplier: MARTIN MARIETTA
MASON ST FROM SOUTH OF HARMONY RD TO CHERRY MATERIALS
Location: Caissons for the northbound Mulberry Street Station.
Cast Date: 51312013
Ticket: 49015542
Batch Time: 11:13
Concrete Mix: CD4715
In -Lab Date: 5/4/2013
Truck Number: 088
Test Time: 12:00
Specimens Made By: JUSTIN
Initial Curing Final Curing
Curing Method: Min. Temp: Max Temp: Curing Method:
Lab 68 ° F 72 OF Fog Room
Physical Properties of Concrete (ASTM C143, C231, C138, C1064)
Specified Strength (fc)
Slump Air Content
Density
Temperature
4500 psi @ 28 days
3.50 in. 6.4%
143.2 pcf.
73 deg. F
Compressive Strengths (ASTM C39)
Specimen Age in
Diameter Area Max. Load
Compressive Percent
Type of
Number Days
(inches) (sq. inches) (Ibs.)
Strength (psi) of fc
Fracture
1
7
.4.00
12.57
62,320
4960
Average:
4960
110
2
28
4.00
12.57
73,820
5870
.3
28
4.00
12.57
69,140
5500
4.
28
4.00
12.57
70,210
5590
Average:
5650
126
5 56 4.00
CTL.lThom
WYATT 04LIT
REGIONAL M)
12.57 86,410 6880
Average: 6886
Comments: 4.50 yards on truck no water added on site.
cc: MARTIN MARIETTA MATERIALS
351 Linden Street I Suite 140 1 Fort Collins, CO 80524 1 Phone: 970-206-9455 1 Fax: 970-206-9441
LETTER OF TRANSMITTAL
CH2M HILL, INC. Gate: TUESDAY, MAY 14, 2013
9191 S. JAMAICA STREET
ENGLEWOOD CO 80112 Project: MAX BUS RAPID TRANSIT
WE ARE TRANSMITTING:
FOR DATES:
COPIES MAILED TO:
Project No: FC05942.000
Weld and/or Bolt Inspection Results
5/10/201 3
351 Linden Street 1 Suite 1401 Fort Collins. CO 80524 i Phone: 970-206-94551 Far : 970-206-9441
WELD / BOLT INSPECTION REPORT SUMMARY
Client Name: CH2M HILL, INC. Inspection Date: 05/10/2013
Project: MAX BUS RAPID TRANSIT
Project Number: FC05942.000
Report Number: 5
TYPE OF INSPECTION / APPLICABLE CODE
❑ Visual Weld
AWS D1.1-02 Table 6.1
❑ Magnetic Particle. Weld
AWS D1.1-02 Sect. 6.10
Field Rep: JACK PAPPERT
❑ Ultrasonic Weld ❑ Decking
AWS D1.1-02 Sect. 6.13 AWS 131.3-02 Sect. 4.5
L7 High Strength '8olt AISC Spec: for Structural
Joints Using ASTM A 325 or A490 Bolts, Sect. a & 9.
❑ Liquid Dye Penetrant Weld ❑ Anchor Bolts:'
AWS D1.1-02 Sect. 6.10 Project Specifications
Location and Description, of Work:
Plans were prepared by Baker, project "FC 7073", dated 11/10/12.
BOLTS
We inspected the bolted connections of the column cap plates to the overhead beams for the following 5 stations:
northbound Mulberry Street, southbound Mulberry Street, northbound Laurel'Street,'northbound Drake Road, and
northbound Troutman Parkway. All of the bolts were in the snug -tight condition or greater with washers installed at the
time of our inspection with the following 2 exceptions: we observed a 1/4-inch gap between the beam and the column
cap plate at the west end of the top of the southeast column at the northbound Drake;Road station and a missing
washer for the southeast bolt at the top of the column connection at the southeast corner of the northbound Troutman
Parkway station. We also inspected the 3/4-inch diameter anchor bolts for the column base plates at the same five
stations. All of the anchor bolts were in the snug -tight condition or greater with washers installed at the time of our
incnartinn
At the time of our inspection, the items observed met the quality standards sited above unless noted below.
2 Discrepancies were observed
Specific information is presented on the following inspection reports.
351 linden Street I Suite 140 1 Fort Collins, CO 805241 Phone: 970-206-94551 Fax: 970-206-9441
LETTER OF TRANSMITTAL
CH2M HILL, INC. Date: FRIDAY, JUNE 7, 2013
9191 S. JAMAICA STREET
ENGLEWOOD CO 80112 project: MAX BUS RAPID TRANSIT
� I
Project No: FC05942.000
WE ARE TRANSMITTING: Weld and/or Bolt Inspection Results
FOR DATES: 5/17/2013
REMARKS: See attached summary reports for information.
COPIES MAILED TO:
Linden Street I Suite 140 1 Fort Collins, CO 80524 1 rRhGre. ye 0-2K55 1 Fax' G: Q-=w-9441
WELD/ BOLT INSPECTION REPORT SUMMARY
Client Name: CH2M HILL, INC. Inspection Date: 05/17/2013
Project: MAX BUS RAPID TRANSIT
Project Number: FC05942.000
Report Number: g
TYPE OF INSPECTION / APPLICABLE CODE
O Visual Weld
AWS D1,1-02 Table 6.1
❑ Magnetic Particle Weld
AWS 131.1-02 Sect. 6.10 '
Field Rep: ALLEN BARTON
❑ Ultrasonic Weld ❑ Decking
AWS D1.1-02 Sect. 6.13 AWS 131.3-02 Sect. 4.5
❑ High Strength Bolt AISC Spec. for Structural
Joints Using ASTM A 325 or A490 Bolts, Sect. 8 & 9.
❑ Liquid Dye Penetrant Weld ❑ Anchor Bolts
AWS 101.1-02 Sect. 6.10 Project Specifications
Location and Description of Work:
WELDS
We, performed a visual inspection, of the welded connections for the shop -fabricated assembly A60BF at CDI's shop in
Denver. We also performed a. magnetic particle inspection on 10% of the A60 assembly. Please refer to the attached
Magpetic Particle Examination of Welds Report for details. Plans were prepared by Skylark Shelters, project no. 1552.
i
BOLTS
At the time of our inspection, the items observed met the quality standards sited above unless noted below.
❑ Discrepancies were observed, please see the attached Outstanding Discrepancies list.
Specific information is presented on the following inspection reports.
351 Linden St,eet I Suite 140 1 Fort Collins, CO 805241 Phone: 970-206-94551 Fax: 970-206-9441