Loading...
HomeMy WebLinkAboutMENNING SUBDIVISION - FDP - 25-06/A - CORRESPONDENCE -Department: Stormwater-Water-Wastewater Issue Contact: Glen Schlueter Topic: Stormwater Number: 27 Created: 12/27/2006 [12/27/06] Calculation of the new impervious area is needed for two purposes. One to document that they are not exceeding the allowed increase of 1000 square feet and the second is so that the Stormwater building permit fee can be calculated. Department: Stormwater-Water-Wastewater Issue Contact: Wes Lamarque Topic: Stormwater Number: 26 Created: 12/26/2006 [12/26/06] No comments for PDP. A Lot Grading Certification will be required prior to CO of the new house. This will be included in the Development Agreement. Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington Topic: Water/Wastewater Number: 23 Created: 12/26/2006 [12/26/06] No comments. Be sure and return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6206. Sincerely, y' Ae *nn i H. Aspen City Planner Page 2 STAFF PROJECT REVIEW City of Fort Collins COFFEY ENGINEERING & SURVEYING Date: 01/04/2007 MARK CORBRIDGE 903 E GRAND AVENUE LARAMIE,WY,82070 Staff has reviewed your submittal for MENNING SUBDIVISION PDP - TYPE I, and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Anne Aspen Topic: Stormwater Number: 28 Created: 1 /4/2007 [1/4/07] The following departments have indicated that they have no further concerns with this project: Comcast, GIS, County Assessor. Department: Engineering Issue Contact: Susan Joy Topic: Plat Number: 25 Created: 12/26/2006 [12/26/06] From Technical Services: Plat matches legal, plat closes, area is good. Department: Light & Power Issue Contact: Doug Martine Topic: Electric Utility Number: 1 Created: 8/25/2006 [12/18/06] [8/25/06] Developer will need to coordinate electric system locations, requirements, development charges, and electric system modification charges with Light & Power Engineering (221-6700). Number: 22 Created: 12/18/2006 [12/18/06] The utility easement shown along the eastern side of lot #2 will need to be 15 ft. wide all the way to Juniper Ct. This will allow the underground electric service to Lot #1 to be relocated paralleling the sewer line, but maintaining 10 ft. of lateral clearance between the sewer and electric lines. Department: PFA Issue Contact: Carle Dann Topic: Fire Number: 24 Created: 12/26/2006 [12/26/06] ADDRESS NUMERALS: Address numerals shall be visible from the street fronting the property, and posted with a minimum of six-inch (6) numerals on a contrasting background. (Bronze numerals on brown brick are not acceptable).97UFC 901.4.4 Topic: General Number: 20 Created: 9/18/2006 [12/26/06] The adjacent fire hydrant still is not shown on any submitted plans; however, because I know a fire hydrant is within 400 feet of the proposed structure, the water supply issue is resolved. [9/18/06] WATER SUPPLY: Site visit shows an existing fire hydrant on the west side of the proposed, new Jupiter property. Future site plans should show this fire hydrant. Page 1