Loading...
HomeMy WebLinkAbout650 S COLLEGE AVE - SPECIAL INSPECTIONS - 9/1/2015b 150 4 9 7Y September 1, 2015 Brinkman Construction Attn. Mike McCartney Re: Noodles Roof Top Deck 650 S. College Ave Fort Collins, Colorado Project No. 214099 Gentlemen: WEEMS Ek G1550C2C1T125 F7RUC7UPAL ENGIP4ECRS A representative of Weeks & Associates observed and reviewed the installed structural steel and connections, light gage steel joist installation and the reinforcement of the existing structural elements for the roof top deck at the referenced site. Based observations and review it is our opinion the roof top deck construction was completed in substantial conformance with the plans and supplemental recommendations for the project. If we can be of further assistance please contact us. Sincerely, ZIT, ,,,.Vi�a,«^=tiSz W s & A'�S�9 n, 'q. ' Td '2 ry G. �IV'�ks, P.E. r 'I : 4j S ucturper 4730 South College Ave, Suite 201, Fort Collins, CO 80525 Phone (970) 225.2422 - Fax (970) 225.2622