HomeMy WebLinkAbout4900 BOARDWALK DR - APPLICATIONS - 12/10/2014 (3)City of
Fort Collins
Planning, Development & Transportation
281 N. College Ave P.O. Box 580
Fort Collins, CO 80524
Phone 970-416-2740 Fax 224-6134
OVER-THE-COUNTER PERMITS ONLY
This application is to be used to apply for the following permits only (check all that apply). ❑ Air Conditioning
❑ Demolition (interior non-structural) ❑ Electrical Alteration (not service change) ❑ Gas Lighter ❑ Gas Log
❑ Heating Unit ❑ Lawn Sprinkler ❑ Mobile Home replacement PLRoofing ❑ Sewer Line ❑ Photo -voltaic
❑ Ventilation ❑ Water Heater ❑ Water Line ❑ Wood/Pellet Stove (must be EPA certified, provide make, model and
manufacturer).
Complete all applicable information on the application. Incomplete applications will not be accepted.
Application # fbitLA I aUL49 Date
For ofce use only
Job Site Address (required)
Value of Construction (labor, materials, profit)
(
-E& eo
LEK- - 5'
Property Owner Name
Address
City/State Zip Phone
3 7 a
sF eA Zq,va &,3V, OV-3/O/
Applicant N e
Address
City/State Zip Phone
Contractor
Address
City/State Zip Phone
a.al ( (114 L1
C 711,9..
it.V/fit fC 9O-Z/4- 7
Contractor Cityof Ft. Co Ions Sales Tax #
Sales tax number is required by all contractors
Are you paying taxes here or by report? Lklere ❑ Report
Are you paying with your trust account? ❑ Yes ,JkNo
Is this a residential or commercial project? Residential ❑ Commercial
If residential, is it: ❑ Single Family Detached ❑ Condo/townhome (single family attached) ❑ Duplex
❑ Multifamily (apartment) �. arage
If commercial, is it: ❑ Bank ❑ Bar ❑ Church ❑ Hotel/Motel ❑ Medical office ❑ Office ❑ Retail
❑ Restaurant ❑ Other (explain)
Is this building 50 years of age or more? ❑ Yes Flo If yes, you may need to contact Historic Preservation
If this is for a demolition permit, what year was the building constructed?
If prior to 1975, you will need an asbestos assessment to submit with this application.
Description of work
. _ .
*If lawn sprinkler/backflow preventer, must list licensed plumber. If first-time A/C, must list licensed electrician.
Subcontractors: List the company name or City of Ft Collins license #
Electrician Plumber
Mechanical Roofer
Other
W
I hereby acknowledge that I have read this application and state that the above information is complete and correct. I agree to
comply with all requirements contained herein and city ordinances and state laws regulating building construction. I know that a
permit is not valid until it has been paid and issued.
Applicant:
Print Name:
Date