HomeMy WebLinkAbout912 WOOD ST - CORRESPONDENCE - 6/15/2015utyor Community Development & Neighborhood Services
Fort Collins 28 N. Col eg ve. Fort Collins, CO 80522; Voice: 970-221-6760
��— FAX:970-224-6134
5U4
CONSTRUCTIO STE MANAGEMENT PLAN and DOCUMENTATION
Note: Environmental Services staff is able to assist with questions about getting a recycle program
implemented, and will also provide education and site visits upon request (call Caroline Mitchell at (970)
221-6288).
PROJECT INFORMATION
Address 834 Wood Street Date 6/15/2015
Permit
General Contractor & Contact Info: BelliSlmo Inc.
Material
Vendor hauling the
Facility recycling the
,�Tott& J!11 or we�gh�t
material
material
. of material ,y
n
Concrete/Masonry
Recycled on Site.
'g�`
I
Wood/Lumber
a ,
Metals
7 -
g t 1$ wl�
rry
Cardboardh�17
,
Trash
N/Ait
Other (describe)
tm ,
',l<
3i
S
Required Documentation4: Provide signed documentation from the hauling company that the volumes &
weights listed above are accurate. If you hauled the materials yourself, attach tickets from locations receiving
the recyclables. Documentation is required in order to receive final project approval from the City.
I and my City -licensed hauler certify that the above materials from my construction site were recycled in the
volume / weight described and were taken to the facilities described.
Signature (Contractor or Owner) Date
Signature (Licensed Hauler)
Date
' At minimum, the four listed materials must be recycled.
2 Enter vendor name and phone number. If the applicant will haul the material themselves, state such.
'Where will applicant or vendor take the material for recycling? Enter facility name and address.
4 To be completed at the end of the project. Please re -submit this form at end of project with these sections completed.
Rev 1/15114