HomeMy WebLinkAboutOTTER BOX CORPORATE HEADQUARTERS (209 S. MELDRUM ST.) - PDP - 35-09 - REPORTS - MAPS/GRAPHICSPRE -DEVELOPMENT SHADC %ALYSIS OF EXISTING BUILDING AND F GROUNDING CONTEXT DURING 21 DECEMBER (WINTER SOLSTICE)
low— `L L--' `j NORTH
SHADOW ANALYSIS 21 DECEMBER @ 10 AM (WINTER SOLSTICE)
2 SHADOW ANALYSIS 21 DECEMB
2-07 V. W-'
POST -DEVELOPMENT SHADOW ANALYSIS OF PROPOSED BUILDING AND SURROUNDING CONTEXT DURING 21 DECEMBER (WINTER SOLSTICE)
5 SHADOW ANALYSIS 21 DECEMBER 12 PM WINTER SOLSTICE
PDPm 1'=50'-0'
SHADOW ANALYSIS:
THESE DRAWINGS ARE I. 9D TO DEPICT PRE•DEVELOPMENT SITE CONDITIONS AND ANTICIPATED POST-DEVL 34T CONDITIONS AT
PROJECT COMPLETION, FOH THE PURPOSES OF ANALYZING THE POTENTIAL IMPACT OF SHADOWS ON ADJACENT PROPERTIES.
THESE DRAWINGS DEPICT SHADOWS AT THREE INTERVALS ON 21 DECEMBER (WINTER SOLSTICE), DEPICTING SHADOWS CAST BY EXISTING
BUILDINGS (PRE -DEVELOPMENT).
'H
3 SHADOW ANALYSIS 21 DECEMBER 0 3 PM WINTER SOLSTICE
PDP-07 i' = 50'-0' �T
SHADOW ANALYSIS:
THESE DRAWINGS ARE INTENDED TO DEPICT PRE-OEVELOPMENT SITE CONDITIONS AND ANTICIPATED POSTAEVELOPMENT CONDITIONS AT
PROJECT COMPLETION, FOR THE PURPOSES OF ANALYZING THE POTENTIAL IMPACT OF SHADOWS ON ADJACENT PROPERTIES.
THESE DRAWINGS DEPICT SHADOWS AT THREE INTERVALS ON 21 DECEMBER (WINTER SOLSTICE), DEPICTING SHADOWS OAST BY PROPOSED
6 SHADOW ANALYSIS 21 DECEMBER 0 3 PM WINTER"SOLSTICE
PDPfi 1'=50'-0'
PREPARED BY:
— m —
TMARCHRECTS STUDIO. ft
151 W4L�Aw
FW C m, CalaeOo
99534
TEL: 9T0 4=IA113
FAX: 19)0 aS2d
U)
of
W
H
X�
O
m O
Of W
L L] =
~ w
Oz
W
WO
D_ 0
F_
20
M J
0_ O
00
J
W f
2z
2 J
F— O
ZU
O�
N 0
J
Q
m
a
0
d
ISSUE DATE: On NOV 2009
PROJECT If: OS-328
DRAWN BY: JE
CHECKED BY:
REVISIONS
DRAWING TITLE:
SHADOW
ANALYSIS
SHEET:
PDP-07