HomeMy WebLinkAbout4700 LADY MOON DR - DISCLOSURES - 2/20/2015City Of Fort Collins Certification of Compliance Building Air Leakage Test Results … EXPEDITED DRAFT … D4195.01
City Of Fort Collins Certification of Compliance Building Air Leakage Test Results … EXPEDITED DRAFT …D4195.01
2
Architectural Testing, Inc.
Building Address: 4700 Lady Moon Drive, Fort Collins
Performed for: Whole Building Air Leakage Enclosure Test (Excluding Sections
L,M,N,Q, & R...See Layout Appendix)
Performed by: Stevens
Test date: 2015-02-20
Associated Test file: ASTM 2015-02-20 1311
Building and Test Information
Test file name: ASTM 2015-02-20 1311
Customer: Whole Building Air Leakage Enclosure Test
(Excluding Sections L,M,N,Q, & R...See
Layout Appendix)
Building volume: 2,000,000 cu. Ft.
Building Height (from ground to top): 32 ft.
Floor Area: 125,843 sq. ft.
Envelope Area: 217,962 sq. ft.
Results
CFM at 75 Pa: 24350
Leakage Area (EqLA) [sq. in]: 2610
Air Changes per hour ACH50: .7
Combined Test Data
Results Uncertainty
Air flow at STP, [CFM at 50] 24350 +/-0.7%
Air change rate at 50 Pa [/h] 0.7300 +/-0.7%
Flow per unit floor area at 50
[CFM/sq. ft.]
0.193 +/-0.7%
Flow per unit envelope area at
50 [CFM/sq. ft.]
0.112 +/-0.7%
Equivalent leakage area at 75
Pa [sq. in]
2610 +/-0.7%
LBL Effective leakage area at
4 Pa [sq. in]
1520 +/-9.4%
LEED Permeability at 4 Pa [sq
in/ 100 sq. ft.]
0.6975 +/-9.4%
City Of Fort Collins Certification of Compliance Building Air Leakage Test Results … EXPEDITED DRAFT …D4195.01
3
Depressurize Data Set
Test Dataset Date and Time: 2015-02-20-20:25
Environmental Conditions
Wind speed: 5-10 from the West
Operator Location: Inside the building
Initial Bias Pressure: -1.19 Pa
Final Bias Pressure: -2.03 Pa
Initial Temperature: indoors: 68.0 °F outdoors: 53.0 °F.
Final Temperature: indoors: 65.0 °F outdoors: 52.0 °F.
Test Analysis Results Uncertainty
Height x Temperature difference: 448 ft °F
Air leakage coefficient, Cp: 2040.9 +/- 3.9%
Exponent, np: 0.58693 CFM/Paⁿ +/- 1.5963%
Correlation coefficient, r
2
: 0.9998
Air flow at STP, [CFM]: 24194 CFM at 75Pa +/-0.2%
Air change rate, ACH: 0.7258 air changes per hour at 50 Pa +/-0.2%
Flow per unit floor area: 0.1923 CFM per sq. ft. +/-0.2%
Flow per unit envelope area: 0.111 CFM per sq. ft. +/-0.2%
Induced
pressure
[Pa]
-47.7 -51.7 -55.4 -59.3 -62.6 -66.3 -70.6 -73.6 -77.4 -81.3
Total
Flow
[CFM]
18200 19100 19900 20800 21400 22200 23100 23700 24300 25100
Corrected
Flow
[CFM]
19370 20300 21130 22070 22700 23560 24530 25170 25850 26700
Error [%] 0.3% 0.0% -0.2% 0.1% -0.4% -0.1% 0.2% 0.2% -0.2% 0.2%
12 baseline pressures each taken for 10 of required 10 seconds.
Static Pressure
Averages:
initial [Pa] ∆P01 -1.19 ∆P01- -1.19 ∆P01+ 0.00
final [Pa] ∆P02 -2.03 ∆P02- -2.03 ∆P02+ 0.00
Baseline,
initial [Pa]
-
1.39
-
1.39
-
1.22
-
1.20
-
0.81
-
0.83
-
1.18
-
1.19
-
1.10
City Of Fort Collins Certification of Compliance Building Air Leakage Test Results … EXPEDITED DRAFT …D4195.01
4
Pressurize Data Set
Test Dataset Date and Time: 2015-02-20-20:53
Environmental Conditions
Wind speed: 5-10 from the West
Operator Location: Inside the building
Initial Bias Pressure: -1.97 Pa
Final Bias Pressure: -0.65 Pa
Initial Temperature: indoors: 65.0 °F outdoors: 52.0 °F.
Final Temperature: indoors: 63.0 °F outdoors: 51.0 °F.
Test Analysis Results Uncertainty
Test Date and Time: 2015-02-20-20:53
Height x Temperature difference: 400 ft °F
Air leakage coefficient, Cp: 3719.6 +/- 25.3%
Exponent, np: 0.45775 CFM/Paⁿ +/- 11.7902%
Correlation coefficient, r
2
: 0.9897
Air flow at STP: 24468 CFM at 75 Pa +/-1.2%
Air change rate: 0.7340 air changes /
hour at 50 Pa
+/-1.2%
Flow per unit floor area: 0.1944 CFM per sq ft +/-1.2%
Flow per unit envelope area: 0.112 CFM per sq ft +/-1.2%
Induced
pressure
[Pa]
47.1 51.7 55.5 58.2 63.0 65.6 71.3 73.3 77.0 81.2
Total
Flow
[CFM]
20300 20700 21400 21600 22500 22900 23800 24200 24900 26000
Corrected
Flow
[CFM]
22400 22850 23620 23830 24750 25280 26290 26670 27460 28620
Error [%] 2.0% -0.2% -0.1% -1.3% -1.0% -0.8% -0.6% -0.4% 0.3% 2.1%
Static Pressure
Averages:
initial [Pa] ∆P01 -1.97 ∆P01- -1.97 ∆P01+ 0.00
final [Pa] ∆P02 -0.65 ∆P02- -1.28 ∆P02+ 0.60
Baseline, initial
[Pa]
-
2.21
-
1.89
-
1.89
-
2.16
-
1.77
-
1.65
-
1.84
-
1.97
City Of Fort Collins Certification of Compliance Building Air Leakage Test Results … EXPEDITED DRAFT …D4195.01
5
Baseline, final
[Pa]
-
0.49
-
0.35
0.63 0.76 0.91 -
5.78
0.10 -
0.09
-
0.70
-
1.22
-
0.89
-
0.70
NOTE:
ASTM E779 is often utilized with modifications to section 8.9 and 8.10 of the standard as these
sections discuss the induced pressure range (10 Pa to 60 Pa) and what increments (5 Pa to 10
Pa) between induced pressure points are required for compliance. Through our testing
experience, it has been determined that the lower pressures within the specified range in ASTM
E779 are more susceptible to error, due to wind and stack pressure effects that commonly
occur in larger structures. Additionally, project specifications typically include whole building
air testing performance criteria of a measured air leakage rate at a 75 Pa (not 60 Pa) pressure
differential. When testing is limited to higher pressure ranges, induced pressure increments
may be less than the increments specified in ASTM E779. The lowest pressure within the
induced pressure range may be constrained by weather conditions where the highest pressure
within the induced pressure range is typically limited by the fan capacity brought to the site.
Ideal weather conditions are difficult to achieve when testing is scheduled weeks in advance.
Thus, to achieve the most accurate data and meet the required performance criteria outlined in
the project specification, testing is generally limited to smaller induced pressure ranges at
higher pressures both above and below the required pressure differential (75 Pa).
APPENDIX A
Photographs (17 Pages)
City Of Fort Collins Certification of Compliance Building Air Leakage Test Results … EXPEDITED DRAFT …D4195.01
6
Photo No. 1
Building from North West
Photo No. 2
Building from North East
Photo No. 3
Building from South East
City Of Fort Collins Certification of Compliance Building Air Leakage Test Results … EXPEDITED DRAFT …D4195.01
7
Photo No. 4
Building from South West
Photo No. 5
Sealed Exhausts – LEF-3 and KIT for “HVAC Excluded”
Default Preparation Test Condition (Roof Top)
Photo No. 6
Sealed SEF-3 Smoke Relief Vent for “HVAC Excluded”
Default Preparation Test Condition (Roof Top)
City Of Fort Collins Certification of Compliance Building Air Leakage Test Results … EXPEDITED DRAFT …D4195.01
8
Photo No. 7
Sealed KEF-2 Kitchen Dishwasher Vent for
“HVAC Excluded” Default Preparation Test Condition (Roof Top)
Photo No. 8
HU-3 Sealed Supply Damper
“HVAC Excluded” Default Preparation Test Condition (Roof Top)
City Of Fort Collins Certification of Compliance Building Air Leakage Test Results … EXPEDITED DRAFT …D4195.01
9
Photo No. 9
HU-3 Sealed Exhaust Damper for
“HVAC Excluded” Default Preparation Test Condition (Roof Top)
Photo No. 10
Sealed Exhausts – LEF-6 and LEF-1 for “HVAC Excluded”
Default Preparation Test Condition (Roof Top)
City Of Fort Collins Certification of Compliance Building Air Leakage Test Results … EXPEDITED DRAFT …D4195.01
10
Photo No. 11
Sealed Exhausts – LEF-6 and LEF-1 for
“HVAC Excluded” Default Preparation Test Condition (Roof Top)
Photo No. 12
Sealed EF-4 for “HVAC Excluded” Default
Preparation Test Condition (Roof Top)
City Of Fort Collins Certification of Compliance Building Air Leakage Test Results … EXPEDITED DRAFT …D4195.01
11
Photo No. 13
AHU-2 Sealed Intake Dampers for “HVAC Excluded”
Default Preparation Test Condition (Roof Top)
Photo No. 14
AHU-2 Sealed Exhaust Dampers for “HVAC Excluded”
Default Preparation Test Condition (Roof Top)
City Of Fort Collins Certification of Compliance Building Air Leakage Test Results … EXPEDITED DRAFT …D4195.01
12
Photo No. 15
Sealed SEF-2 Smoke Relief Vent for “HVAC Excluded”
Default Preparation Test Condition (Roof Top)
Photo No. 16
Sealed SEF-1 Smoke Relief Vent for “HVAC Excluded”
Default Preparation Test Condition (Roof Top)
City Of Fort Collins Certification of Compliance Building Air Leakage Test Results … EXPEDITED DRAFT …D4195.01
13
Photo No. 17
Sealed MEF-1 Vent for “HVAC Excluded”
Default Preparation Test Condition (Roof Top)
Photo No. 18
Sealed EF-1 Vent for “HVAC Excluded”
Default Preparation Test Condition (Roof Top)
City Of Fort Collins Certification of Compliance Building Air Leakage Test Results … EXPEDITED DRAFT …D4195.01
14
Photo No. 19
Sealed Exhausts – LEF-3 and LEF-2 for “HVAC Excluded”
Default Preparation Test Condition (Roof Top)
Photo No. 20
Sealed Exhausts – EF-3 for “HVAC Excluded”
Default Preparation Test Condition (Roof Top)
City Of Fort Collins Certification of Compliance Building Air Leakage Test Results … EXPEDITED DRAFT …D4195.01
15
Photo No. 21
Sealed Exhausts – EF-4 for “HVAC Excluded”
Default Preparation Test Condition (Roof Top)
Photo No. 22
AHU-4 Sealed Exhaust Dampers for “HVAC Excluded”
Default Preparation Test Condition (Roof Top)
City Of Fort Collins Certification of Compliance Building Air Leakage Test Results … EXPEDITED DRAFT …D4195.01
16
Photo No. 23
AHU-4 Sealed Intake Dampers for “HVAC Excluded”
Default Preparation Test Condition (Roof Top)
Photo No. 24
Sealed MUA-1 and KDF -1 Kitchen Hood Fan System (Side 1)
for “HVAC Excluded” Default Preparation Test Condition (Main Floor)
City Of Fort Collins Certification of Compliance Building Air Leakage Test Results … EXPEDITED DRAFT …D4195.01
17
Photo No. 25
Sealed MUA-1 and KDF -1 Kitchen Hood Fan System (Side 2)
for “HVAC Excluded” Default Preparation Test Condition (Main Floor)
Photo No. 23
AHU-1 Sealed Intake Dampers for “HVAC Excluded”
Default Preparation Test Condition (Roof Top)
City Of Fort Collins Certification of Compliance Building Air Leakage Test Results … EXPEDITED DRAFT …D4195.01
18
Photo No. 24
AHU-1 Sealed Exhaust Damper for “HVAC Excluded”
Default Preparation Test Condition (Roof Top)
Photo No. 25
Sealed Exhausts – EF-5 for “HVAC Excluded”
Default Preparation Test Condition (Roof Top)
City Of Fort Collins Certification of Compliance Building Air Leakage Test Results … EXPEDITED DRAFT …D4195.01
19
Photo No. 26
Lower Level ER Entrance
North Elevation Fan Setup at Exit
Photo No. 27
Lower Level Corridor
Inside Corner West Elevation Fan Setup at Exit
City Of Fort Collins Certification of Compliance Building Air Leakage Test Results … EXPEDITED DRAFT …D4195.01
20
Photo No. 28
Lower Level West Wing
West Elevation Fan Setup at Exit
Photo No. 29
Lower Level Corridor
South Elevation Fan Setup at Exit
City Of Fort Collins Certification of Compliance Building Air Leakage Test Results … EXPEDITED DRAFT …D4195.01
21
Photo No. 30
Lower Level Corridor
Inside Corner East Elevation Fan Setup at Exit
Photo No. 31
Lower Level Corridor (Adjacent to Courtyard)
Computer System Setup and APT 10% Monitoring System Setups.
City Of Fort Collins Certification of Compliance Building Air Leakage Test Results … EXPEDITED DRAFT …D4195.01
22
APPENDIX B
“HVAC EXCLUDED” Default Preparation (3 Pages)
City Of Fort Collins Certification of Compliance Building Air Leakage Test Results … EXPEDITED DRAFT …D4195.01
23
TABLE 1 Default Conditions for Building Preparation
Intentional Openings
Air barrier systems
enclosure test (HVAC-
related openings
excluded)
Operational enclosure
test (air barrier systems
and HVAC-related
openings included)
Doors, hatches and operable windows
inside the test enclosure
Open Open
Fire Dampers Remain as found Remain as found
Windows, doors, skylights and hatches
in the bounding enclosure Closed and latched Closed and latched
Windows, doors, hatches and operable
windows in ancillary spaces as
identified in section 10.6.3
Treat in accordance with
10.6.3
Treat in accordance with
10.6.3
Dryer doors and air handler access
panels
Closed and latched Closed and latched
Vented combustion appliance Off, unable to fire Off, unable to fire
Pilot light As found As found
Chimney or outlet for vented
combustion device in a separate
mechanical room
As found As found
B-vent or other insulated chimney
serving a vented combustion appliance
located within the test enclosure
Sealed*, ** As found
Solid fuel appliances (fireplaces, wood
burning stoves, pellet stoves)
No fires; dampers
closed; chimney
sealed*, **
No fires; dampers closed
Exhaust, outdoor air, make-up air fans,
air handlers that serve areas inside and
outside the test enclosure
Off Off
Clothes dryers Off Off
Air intake inlet with motorized dampers
Dampers closed and
sealed*, **
Dampers closed
City Of Fort Collins Certification of Compliance Building Air Leakage Test Results … EXPEDITED DRAFT …D4195.01
24
Air intake inlet with gravity dampers Sealed*, ** As found
Air intake inlet with no dampers Sealed*, **
Open unless fan(s) serving
inlet is operated >8000
hours per year, then
sealed*, **
Exhaust or relief air outlet with
motorized dampers
Dampers closed and
sealed*, ** Dampers closed
Exhaust or relief air outlet with gravity
dampers Sealed*, ** As found
Exhaust or relief air outlet with no
damper
Sealed*, **
Open unless fan serving
outlet is operated >8000
hours per year, then
sealed*, **
Active or passive smoke control
systems - air reliefs and intakes
Sealed*, ** As found
Intended powered or non-powered
openings for vented shafts/stairwells
Sealed*, ** As found
Waste or linen handling systems and
equipment
Sealed*, **at rooftop
chute vent opening.
Rooftop chute vent – open,
chute intake doors – closed,
chute intake room and
chute discharge room doors
– closed and latched, fire
dampers - left as found
Clothes dryer outlets Sealed*, **
As found; sealed*, ** if
dryers are not yet installed
Exhaust, outdoor air or make-up air fan
that runs >8000 hours per year
Sealed*, ** Sealed*, **
Ductwork that serves areas inside and
outside the test enclosure
Sealed*, ** at supply
and return
Sealed*, ** at supply and
return
Floor drains and plumbing Traps filled Traps filled
*Sealed means that an opening has been temporarily masked airtight (e.g. covered with self-
adhering plastic film, taped polyethylene film or rigid board stock).
**If the test result meets the passing criteria for the method used then the building is deemed to
pass even if not all of the HVAC related openings were sealed during the test.
City Of Fort Collins Certification of Compliance Building Air Leakage Test Results … EXPEDITED DRAFT …D4195.01
25
APPENDIX C
Location Plans (3 Pages)
City Of Fort Collins Certification of Compliance Building Air Leakage Test Results … EXPEDITED DRAFT …D4195.01
26
Main Floor Equipment Setup DRAFT
City Of Fort Collins Certification of Compliance Building Air Leakage Test Results … EXPEDITED DRAFT …D4195.01
27
2
nd
Floor Equipment Setup DRAFT
City Of Fort Collins Certification of Compliance Building Air Leakage Test Results … EXPEDITED DRAFT …D4195.01
28
-
2.20
-
2.35
-
1.96
-
1.76
-1.25 -1.36 -1.35
Baseline,
final [Pa]
-
1.62
-
1.75
-
1.90
-
1.90
-
2.09
-
2.10
-
2.04
-
2.20
-
2.24
-2.21 -2.18 -2.09