HomeMy WebLinkAbout4809 PRAIRIE VISTA DR - DISCLOSURES - 5/11/2015 (2)City of Fort Collins Residential Mechanical Systems Performance Report
Updated 377/2014
This form is a record of testing targets and resrdts, with Pall ai outcarnes For information on anent tooTS
'Residential
City of
Fort Collins
and testing techniques, see the New Construction Mechanical Systems Testing Guide' The guide and
this forth may be periodically updated; check the Building Services web site for the current version-
This forth must be completed and signed by an "Approved Agency,' and submitted to Building Services as a requirement for receiving a C.O.
Color
key
Target
Measured value
Other
or limit
to compare with
Pass
Fail
Caution
data
target or Emit
ADCF = Air Densily Cmsrecemr Factor, based an too[,
ADCF altitude (5000'), air temperature through tool
Volumetric flow (CFM 500P) = ADCF x Indicated flow (CFM)
e
Address Date of 'Residential
Q % 7 I^e. Mechanical lSyslems
Binder Z Sferenced
information referenced
HVAC contractor by testing technicians
As -butt changes
mech design submi
Testing date(s)
Bath exhaust
Testing tech
Flow 25Flow box _ tube duct traverse Airtemp( IcaI
ADCF
Other
tool _Passive flow hood _Other (note below) through tool (F) t0
Measured Airflow
Design
Airflow
Minimum Airflow Requirement
Indicated
Volumetric
Exhaust Pickup Location
(CFM
(CFM 5000')
Flow
Flow
Pass
Fail
5000')
+Type of Operation
(CFM)
(CFM 5000')
so Intermittent 20 Continuous
1
Fi
❑
)! 50 Intermittent _ 20 Continuous
l
I &
❑
-0501ntermittent —20 Continuous
❑
(�
-501ntennittent
®
❑
r
_20Continuous
50 Intermittent — 20 Continuous
❑
Cl
50 Intermittent —20 Continuous
❑
❑
50 Intermittent _ 20 Continuous
❑
❑
Testing
notes
Kitchen exhaust
N/A - hood does not vent to outside11
Testing tech (initials)E / I
Oven fuel Gas _ Electric Minimum airflow, requirement (CFM 5000') + operation
100 Intermittent
25 Continucus
Measured airflow,
FlowI-XFlow box _ Pitot tube traverse Tool � 9Interior rille
flow hood _Flow grid Iccation — Exhaust duct
Air temPtool—Passive
through FW
ADCF
Powered flow hood _ Other (note below)
(Exteriorterminanon not OK)
tool(F)
Indicated flow 411 CFM
Volumetric flow 16
CFM 5000' 5ZPass LD Fail
Testing
notes
Residential Mechanical Design Submittal V20140307 Page 1
Systems other than sub -structural floor exhaust
a Imo
(based on CFA) ands# of BR) C CFM 5 airflow 5
/ to Cl� CFM
Target ventilation airflow range (9 O
(emi�) (1 afit MfA' -j}
Testing tech
_-Exhaust-only
Supply -only
Ba1arroad
Measured Airflow
Air Temp
tudcaied
Volumetric
Measurement Method
Tooll-ocation
Through
AUCF
Flow
Flow
Pass
Fal
Tool (F)
(CFM)
(CFM 5000')
Total
NfA P'assivaeflow howexhaust
Flow
UKWt t( v
pp qq
tv' v rk `n
I q
`• �$
1-
v �
�t
/ LP
❑
❑
aidlour
come =Obox
ly (
Total
N/A Passive flow hood
supply
_
Flow box _ Pilot tube travi-sw
®
❑
airflow
Flow collar Other (note below)
When supply airflow is cirartated by air handler fan, Fan speed for measuremerrt
_ Ke Ung —Ong _ Continuous fan
Balanced airftaw m balanced systems
Average of measured CFM Target flow range CFM
supply + exhaust flmms 5000' (avers,+/-15%) to El Pass IOFaiI
Sub -structural floor exhaust ❑ N/A - no sub -structural floor exhaust system Testing tech (initials)
Design exhaust airflow (bated on Target airflow, Limits
approved design) -FIN 5600° (design +/_ 15%) to CFM 5000'
Measured airflow
Flow — Flow box ZGPitot tube traverse Tool Air temp
tool —Passive flow hood _ Ffm cot4ar locafion �.oD �� . ° A�F •09
— Powered flow hood — Other (note below) �'r�L •�`'� `")� tool (F)
Indicated flow CFM Volumetric flow (� CFM 5000' ❑ Pass Fail
Testing
N/A No ductwork Testing notes -r �' ° ` (
— No ductwork outside conditioned space (ind muHiple sys) ` e 1.� 1
Duct leakage Energy rater (name,
I ata source company, testing date): y� t
` S�II�tS
House conditioned floor area J sf Air temp ADCF
(Include full basement) 3 (Y through tool (F) 11�"ICi3 I
Residential Mechanical Design Submittal V20140307 Page 2
15. eCooling Equipment
For multiple Isys�tems, attach one page per system
System #I / I Which parts of house does it serve? DU -���TTTii��
Installed equipment (Be clear about which AC components are installed at time of testing) Testing tech (initials)
Furnace or Boiler
AC or Heat Pump Condenser
AC or Heat Pump Coll
Manufacturer
L��L
100
Model #
4 £ 2
O
��.b41 xieLI fv1
Filter _ Basic fiberglass — Electrostatic
Type asic pleated Other: ThicknessF11 MERV
brand KQGy — (riches) (optional)
_ High effic pleatedF1
OLIU
Speed: _ Heating Cooling — Cont. fan
A. High -stage for multi -stage equipment
Blower speed tap:
Humidifier damper: ke'NIA
— Open (Heating)
— Closed (Cooling)
All registers open
✓Zane dampers open
SP1�
AP Filter
(SP1 - SP2)
Cooling: Measured air flow through indoor coil
Design cooling airflow CFM 5000'
(high stage) Z Qd
SP2 /Q
Testing tech (initials)
(Same loratian
SP4 O for NSOP,
TFSOP)
AP Coil
(SP3-SP4) 3 v
SP3
AP Total ESP / v
(SP3- 3
Testing tech (inifials)
Target airflow limits � O to J O O CFM
(design +/-15%) Q� 5000'
❑ NIA - no AC installed
Measured airflow
Air temp
Flow grid = 14 through u )❑ ADCF r / NSOP❑ TFSOP� Flow Resistance ?
plate size 20 tool F 70 ✓ Correction Factor
Measured airflow, no 77 CFM Indicated airflow CFM Volumetric airflow F/Z�Y]5000
CFM Pass
adjustmenticorrection �� li Measured AF x FRCF Indicated AFx ADCF ' 1
❑ Fail
Heating: Gas manifold pressure (high stage) '✓�f p 0%� �� `G' Testing tech (initia�lss)f
Manifold pressure5000'�IWC Target manifold P IWC Measured
sure WC f ,Pass
OEM spec @ 5000' �, limits (spec +/- 5%) G pressure 3,� fQi Fail
Heating: Temperature rise Testing tech (initials
OEM temperature rise limits [o F
(high stage)
Measured temps F ; Supply _ Retum _ Temp f� � r�Cautlon: within 10F
p O air ��� air 7 U - rise ) Pass 1Ej Fail_ j of top of range
Residential Mechanical Design Submittal V20140307 Page 3
)Testing approach and targets Testing tech (initials�L�
❑ NIA No complete AC system ❑ N/A: House completed November- April (Installing contractor responsible for testing in warm weather)
❑ TXV: Subcooling + SH check ❑ Non-TXV: Superheat ❑ OEM-spectfic: Approach ❑ Other OEM -specific (documentation required)
Temperatures Condenser Non
-TXV: Return Target Target Target
(F): entering air temp 2 air wet -bulb temp superheat su6cooling approach
Subcooling
Discharge Condenser Liquid Actual ❑ TXV Pass: Actual SC within pressure saturation
saturation T❑F line❑F subceoltng❑F 3 F of target SC, 2 F min
(PSI) (5000•cnart) temp (condT-ngitneT) QTXVFail
Superheat
Suction Evaporator Suction Actual ❑Non-TXV Pass: Actual SH
ressure saturation T F line F su rheat F within +/- 5 F of target SH
p (PSI) (5000'chart)❑ temp❑ (SuctlineT--evap n LQNon-TXV Fail g
TXV checks: ❑ Pass: Field4nstalled TXV installed in accordance with OEM instructions !E3Caution: Actual SH outside mfgr range
Approach
Liquid Iina F Actual approach�F ❑ Approach Pass: Actual approach within +/-1 F of target approach
temp (uglineT-mndenserEAT) L�,'ApproachFail
TD C04- P Tv r£fT
Register air flows Testing tech (initials)
All registers are cut through finish materials and moving air (Pass P Fail
(Remainder of register air flow section under development, not yet being enforced)
Pressure balance Testing tech (nitials)Is( &—
Room
(match names on plans, include
basement if there is a door)
Room -to -Core
Pressure Drop
Target Range (Pa)
Measured
Pressure
Drop (Pa)
Pass
Fail
G J h d #e V
-3 to +3
_-Di
❑
ii G oj✓ O
-3 to +3
.. �.
❑
3 to +3
❑
OOd►� rGary,
3to+3
D. !v
j$'
❑
U✓Y
-3 to +3
/
❑
-3 to +3
, Q O
/
❑
3to+3
❑
❑
3 to +3
❑
❑
-3 to +3
❑
❑
-3 to +3
❑
❑
Residential Mechanical Design Submittal V20140307 Page
❑ Combustion safety testing WA — no natural -draft combustion appliances Testing tech (initials)
(Appliance Types table must be completed for every home)
Appliance types pe
Appliance
Combustion
T
WA
Draft -hood
Natural draft
Induced -draft
Natural<iraft
Power-
vent
Direct-
vent
Powered sealed -
combustion
Electric
Furnace #1
❑
❑
❑
❑
❑
❑
Furnace #2
❑
❑
❑
❑
❑
❑
Boller #1
❑
❑
❑
❑
❑
❑
Boiler#2
11
❑
❑
❑
❑
❑
❑
Water heater#1
❑
❑
❑
❑
❑
❑
Water heater#2
11
❑
❑
❑
❑
❑
❑
Fireplace #1
❑
❑
❑
❑
❑
❑
Fireplace #2
❑
❑
❑
❑
❑
❑
Other:
❑
❑
❑
❑
❑
❑
I
Worst -case depressurization performance
`House setu
These doors are cl
#of bath fans on
_ Vented range hood on
_ Clothes dryer on
_ Air handler on
Other fans on:
Other setup notes:
Outdoor temperature F
Appliance
Locatior
CAZ pressure
` BPI depressurization limit
(Pa wrt outside)
Measured net CAZ depressurization
(Pa wrt outside)
OK (less negative) I Caution (more negative)
Spillage
BPI maximum limit
(seconds
Measured spillage duration
(seconds
Pass = duration not exceeding limit
-`:Draft pressure
BPI limit
(Pa wrt CAZ
Measured
(Pa wrt CAZ
Pass = pressure more negative than limit
;CO concentration in undiluted flue gas
BPI maximum limit
(ppm
Measured CO
(ppm
Pass = CO level not exceeding limit
Caution = CO level 25 to 100 ppm
Testing
` notes
❑ JOK I ❑ ` Caution ❑ OK ':❑' Caution ❑ OK ❑ Caution
60
60
60
[:I
Pass
❑ ]Fail
❑
jPass
❑ ,' Fail
❑
jPass ,
❑;
Fail
❑ Pass
❑`?; Fail
❑
Pass
°°0 IFail
I ❑ JPass
❑;, Fail
❑
1pass p: IFail
❑
Pass
� ❑ ',
Fail
❑
1 Pass ["El Fail
❑]Caution
❑'
Caution
❑'
Caution
Residential Mechanical Design Submittal V20140307 Page 5
System
Controls Operating
Per Design Intent
Local exhaust (all fans)
❑
WA
❑
Pass
"Ell"
Fail
Whole -house ventilation
El
WA
ElPass
❑„
Fail
Sub -structural floor exhaust
❑
WA
❑
Pass
t! ,,
Fail
Heating (all systems)
❑
NIA
Pass
❑
Fail
Cooling (all systems)
❑
WA
X ..
Pass
I❑ a
Fail
Technician #1 performing inspection and testing documented on this report (Approved Agency)
I ) I certify that the tests referenced above, in sections bearing my initials, were performed in accordance with protocols specified by the
j-, City of Fort Collins Building Services Department, and that the reported results are accurate to the best of my knowledge.
Name (print)
- Title
�01rt✓'
Company
G
Signature and Date
Technician #2 performing inspection and testing documented oh this report (Approved Agency)
�iI certify that the tests referenced above, in sections bearing my initials, were performed in accordance with protocols specified by the
!City of Fort Collins Building Services Department, and that the reported results are accurate to the best of my knowledge.
Name (print) '
.I Title
dd Company
i J
Signature and Date
HVAC Contractor (City of Fort Collins license holder)
F1 certify that I have reviewed this report and that the test results are an accurate representation of the performance of the installed mechanical
systems.
Na
Signature
Residential Mechanical Design Submittal V20140307 Page 6