Loading...
HomeMy WebLinkAboutPROVINCETOWNE FILING 5 - PDP - PDP130010 - CORRESPONDENCE -Department: Technical Services Contact: Jeff County, 970.221.6588, icounty(c�fcgov.com Topic: Plat Comment Number: 2 Comment Originated: 04/22/2013 04122/2013: Please change "men" to "persons" in the Statement Of Ownership And Subdivision. Comment Number: 3 Comment Originated: 04/22/2013 04/22/2013: Please make sure that all Plat language is the most current. Comment Number: 4 Comment Originated: 04/22/2013 04/22/2013: Please make all lot lines the same linetype. See redlines. Comment Number: 5 Comment Originated: 04/22/2013 04/22/2013: There are line over text issues on sheet 2. Comment Number: 6 Comment Originated: 04/22/2013 04/2212013: Please change the distances along the side lot lines in block 1 to the actual "lot" distance, not the total distance across both lots. Comment Number: 7 Comment Originated: 04/22/2013 04/22/2013: If the bearing & distance along Province Road is not a chord bearing & distance, please move it away from the curve data. See redlines. Comment Number: 8 Comment Originated: 04/22/2013 04/2212013: Please correct the distances & curves along Province Road. See redlines. Comment Number: 9 Comment Originated: 04/22/2013 04/22/2013: All outer boundary curves must have a chord bearing & distance listed, per Development Review Submittal Requirement3(c). If the curve numbers and curve table are to be used, the curve numbers need to be bolder text and on the outside of the boundary and the curve data shown needs to be removed. Comment Number: 10 Comment Originated: 04/22/2013 04/2212013: Please remove all addresses shown on sheet 2. Comment Number: 11 Comment Originated: 04/2212013 04/22/2013: Please rotate the text "Crooked Arrow Lane" and all right of way information associated with the name 180 degrees. Comment Number: 12 Comment Originated: 04/22/2013 04/22/2013: The existing 6' drainage easements for Provincetowne Filing Three will need to be vacated for the lots that adjusted lot lines. Department: Zoning Contact: Gary Lopez, 970-416.2338, glopezncfcgov.com Topic: General Comment Number: 1 Comment Originated: 04/1812013 04/18/2013: No comments Department: Light And Power Contact: Doug Martine, 970.224.6152, dmartine(&fcgov.com Topic: General Comment Number: 2 Comment Originated: 04110/2013 04110/2013: After the plat is approved and recorded, please send an AutoCad drawing (version 2008) to Terry Cox at TCOX@FCGOV.COM. Department: PFA Contact: Jim Lynxwiler, 970-416.2869, ilvnxwiler(a ooudre fire.org Topic: General Comment Number: 01 Comment Originated: 04/23/2013 0412312013: WATER SUPPLY Hydrant spacing and flow must meet minimum requirements based on type of occupancy. RESIDENTIAL REQUIREMENTS: Within the Urban Growth Area, hydrants to provide 1,000 gpm at 20 psi residual pressure, spaced not further than 400 feet to the building, on 800-foot centers thereafter. Outside the Urban Growth Area, hydrants to provide 500 gpm at 20 psi residual pressure, spaced not further than 400 feet to the building, on 800-foot centers thereafter. 2006 International Fire Code 508.1 and Appendix B Upon review of the information available on the submitted plans, it is unclear if the hydrant spacing requirements (outlined above) are being met. Comment Number: 02 Comment Originated: 04/23/2013 04123/2013: PREMISE IDENTIFICATION New and existing buildings shall be plainly identified. Address numbers shall be visible from the street fronting the property, plainly visible, and posted with a minimum of six-inch numerals on a contrasting background. 2006 International Fire Code 505.1 Department: Stormwater Engineering Contact: Wes Lamarque, 970.416.2418, wlamarguepfcgov.com Topic: General Comment Number: 2 04/23/2013: No comments. Department: Technical Services Contact: Jeff County, 970.221.6588, icountyafcgov.com Topic: Construction Drawings Comment Number: 1 04/22/2013: There is cut off text in the profiles on sheet 43. Topic: General Comment Number: 13 04/22/2013: Why are there no Site & Landscape Plans for this project? Topic: Plat Comment Originated: 04/23/2013 Comment Originated: 04/22/2013 Comment Originated: 04/22/2013 Department: Current Planning Contact: Courtney Levingston, 970.416.2283, clevingston(a)fcgov.com Topic: Site Plan Comment Number: 4 Comment Originated: 04/10/2013 04/10/2013: To prevent residential streetscapes from being dominated by protruding garage doors, and to allow the active, visually interesting features of the house to dominate the streetscape, Street -facing garage doors must be recessed behind either the front facade of the ground floor living area portion of the dwelling or a covered porch (measuring at least 6 feet by 8 feet) by at least 4 feet. Any street -facing garage doors complying with this standard shall not protrude forward from the front facade of the living area portion of the dwelling by more than 8 feet. Garage doors shall not comprise more than fifty (50) percent of the ground floor street -facing linear building frontage (Section 3.5.2(E)). Department: Engineering Development Review Contact: Sheri Langenberger, 970.221.6573, slangenbergernafcgov.com Topic: General Comment Number: 1 Comment Originated: 04/22/2013 04/22/2013: Plat Need to provide a note on the plat that identifies and indicates that the sidelot drainage easements dedicated on the Provincetowne Third Filing plat that are within the limits of this replat are vacated and rededicated as shown with this replat All the other easements appear to match. Comment Number: 2 Comment Originated: 04122/2013 04/22/2013: Utility plans Have some layer/ line weight issues on some of the sheets. Example: on the utility plans the water services are shown light and dashed and I know that they are not existing. Comment Number: 3 Comment Originated: 04122/2013 04/22/2013: See plans for additional comments. Missing some text and information on some sheets — could be a layer issue. Department: Environmental Planning Contact: Lindsay Ex, 970.224.6143, lexnafcgov.com Topic: General Comment Number: 1 04/18/2013: No comments. Department: Light And Power Contact: Doug Martine, 970.224-6152, dmartine(rDfcgov.com Topic: General Comment Number: 1 Comment Originated: 04/18/2013 Comment Originated: 04/10/2013 04/10/2013: When the development is ready to proceed, the developer will need to coordinate power requirements and electric development charges with Light 8 Power Engineering (970)221-6700. Community Development and City QI Neighborhood services `t Collins 281 North College Avenue PO eox 580 Foil Collins. CO 80522 970.M.6750 970.224.6134 - fax kgov.com/developmentreview April 24, 2013 Michael Brake JR Engineering 2900 S. College Ave. Suite 3D Fort Collins, CO 80525 RE: Provincetowne Filing 5, PDP130010, Round Number 1 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Courtney Levingston, at 970416-2283 or clevingston@fcgov.com. Comment Summary: Department: Current Planning Contact: Courtney Levingston, 970.416.2283, clevingston(afcgov.com Topic: Building Elevations Comment Number: 1 Comment Originated: 04/10/2013 04/1012013: Section 3.5.2 (B) requires varification of housing modle variety. This project is rewquired to have 4 different types of housing models. Please provide information of housing modles proposed on these lots. Topic: Site Plan Comment Number: 1 Comment Originated: 04109/2013 04109/2013: The site plan of Provincetowne Filing Three will need to be amended. Please submit a site plan. On the site plan please note the size of Filing three and how many single family detached dwellings there are now in filing three with this replat. Comment Number: 3 Comment Originated: 04/10/2013 04/1012013: Setbacks from garage doors to the nearest portion of any public sidewalk that intersects with the driveway shall be at least 20 feet (3.5.2(D)(2)).