HomeMy WebLinkAboutODELL BREWERY PARKING LOT EXPANSION - PDP - PDP120032 - CORRESPONDENCE - (6)Comment Number: 8 Comment Originated: 02/05/2013
02/05/2013: There is some text that needs to be flipped 180 degrees. See redlines.
Noted and revised
Comment Number: 9 Comment Originated: 02/05/2013
02/05/2013: The legal description needs to match the Subdivision Plat.
Noted and revised
Department: Zoning
Contact: Noah Beals, 970.416.2313, nbealst@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 11/28/2012
02/05/2013: The new parking area should maintain an average of 1 foot-candle.
The parking lot has an average of 1.69 foot-candle, as such it is in compliance with the
Land Use Code.
11 /28/2012: The new parking area is not meeting the minimum 1 foot-candle requirement.
Comment Number: 2 Comment Originated: 01/2512013
01 /25/2013: Is there a raised curb along the new stalls in the new parking area? If not wheels
stops will need to be included (LUC 3.2.2(M) Figure 5).
Wheel stops have been added.
Comment Number: 3 Comment Originated: 02/05/2013
02/05/2013: Vehicle use areas are required to paved with asphalt or concrete not recycling
asphalt. I believe this was correct however I do not review the civil drawings and was not sure
it was corrected there also.
Recycled asphalt is no longer proposed.
Comment NumL 16 nment Originated: 02/05/2013
02105/2013: Please label all easement widths on sheet 2. See redlines.
The easements have been labeled.
Comment Number: 17 Comment Originated: 02105/2013
02/05/2013: There are line over text issues on sheet 2.
Corrected.
Comment Number: 18 Comment Originated: 02/05/2013
02/0512013: There are easement lines that need additional distances shown to be locatable.
See redlines.
Corrected.
Comment Number: 17 Comment Originated: 02/06/2013
02/06/2013: All recording information for the easements shown on sheet 2 must be provied
prior to filing with the City.
Acknowledged.
Comment Number: 18 Comment Originated: 02/06/2013
02106/2013: There are drainage easements and a detention pond easement that were shown
on Odell Brewing Company First Replat, that are not shown on this Plat. Are these easements
to be vacated?
This had been corrected.
Comment Number: 19 Comment Originated: 02/06/2013
02/06/2013: Please label all surrounding properties as unplatted or with reference to the
Subdivision Plat if platted. This includes the properties on the south side of East Lincoln
Avenue.
Completed.
Comment Number: 20 Comment Originated: 02/06/2013
02/0612013: The northeast corner of the "Fred's House LLC" property shows a found #2 rebar,
but the previous Plat (Odell Brewing Company First Replat) shows a found 10" spike and post
angle iron. Please explain this.
The 10" spike was mistakenly listed, and has been corrected with this plat.
Comment Number: 21 Comment Originated: 02/06/2013
02/06/2013: There is a portion of the "drainage easement to the City of Ft Collins (hatched
area)" along the east side, that does not match the previous Plat (Odell Brewing Company First
Replat). Has this portion been vacated, or is it to be vacated by this Plat.
The easements have been revised and are now correct.
Topic: Site Plan
Comment Number: 7 Comment Originated: 02/05/2013
02/05/2013: There are some line over text issues.
Noted and revised
Department: Stormwater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamargue(afcgov.com
Topic: General
Comment Number: 3 Comment Originated: 02/05/2013
02/05/2013: The emergency spill for the pond looks to be around 4945, not 4943.8. This looks
to be the elevation the pond would fill to before spilling south down the drive aisles. Please
verify and change note on grading plan.
The note has been changed to reflect the correct spill elevation of 44.48. This is located just
north of the loading dock french drain.
Comment Number: 4
02/1112013: Stormwater is ready for a hearing.
Acknowledged.
Department: Technical Services
Contact: Jeff County, 970-221.6588, icounty(a?fcgov.com
Topic: Construction Drawings
Comment Number: 10
02/05/2013: No comments.
Topic: Lighting Plan
Comment Number: 2
02/05/2013: No plans were included in our review set.
11/28/2012: The plans need to be 24"x36" in size.
Plans are included.
Topic: Plat
Comment Number: 11
02/0512013: The boundary and legal description close.
Acknowledged.
Comment Originated: 02/11/2013
Comment Originated: 02/05/2013
Comment Originated: 11 /28/2012
Comment Originated: 02/05/2013
Comment Number: 12 Comment Originated: 02/05/2013
02/05/2013: The boundary and legal description do not match. See redlines.
Acknowledged.
Comment Number: 13 Comment Originated: 02/05/2013
02/05/2013: Please correct the spelling of Odell in the title block on both sheets.
Revised.
Comment Number: 14 Comment Originated: 02/05/2013
02/05/2013: Are there any lienholders? If so, please add the Lienholder signature block.
The Lienholder has been added
Comment Number: 15 Comment Originated: 02/05/2013
02/05/2013: There is no reference to a title commitment.
A reference has been added.
r
contours from Cc ido Iron and Metal. Additionally add a nc r some way to denote that
those contours are from another project and not a part of these plans.
An alternative grading option is now shown on the grading plan.
Comment Number: 10 Comment Originated: 02/05/2013
02/05/2013: Sheet C100 -The two easements shown on this sheet do not appear on the Plat.
The Colorado Iron and Metal should be removed since the outfall location has moved. The
existing drainage easement should remain on the plat unless it was vacated or being vacated.
The easements have been updated.
Comment Number: 11 Comment Originated: 02/05/2013
02/05/2013: Sheet C200 - Additional easement will need to be included for "drainage" to
accompany the Colorado Iron and Metal storm drainage outfall.
The easements have been updated.
Comment Number: 12
Comment Originated: 02/05/2013
02105/2013: Sheet C300 - Contours will need to be shown on this sheet tieing to existing
without Colorado Iron and Metal design as well as with their design since at this point it is
unclear which project will be completed first. If grading needs to occur on property not owned
by Odell's to be contours then a letter of understanding will be required prior to hearing.
An alternative grading option is now shown on the grading plan.
Comment Number: 13 Comment Originated: 02/05/2013
02/05/2013: Sheet C300 - Please label existing contours with elevations on the Colorado Iron
and Metal project to show more clearly how the grading will tie together.
The contours have been labeled.
Comment Number: 14 Comment Originated: 02/05/2013
02/05/2013: Sheet C400 - Remove recycled asphalt callout from this sheet.
The reference to recycled asphalt has been removed.
Topic: Plat
Comment Number: 8 Comment Originated: 02/05/2013
02/05/2013: Drainage easement Rec. No. 95073186 in the southwest corner is not shown on
the plat. It is my understanding that this easement would need to remain to incorporate
drainage pond.
The easement is now shown.
Comment Number: 9 Comment Originated: 02/05/2013
02/05/2013: Colorado Iron and Metal drainage outfall pipe will need to be accompanied with a
drainage easement instead of a utility easement. Consider adding drainage to the 10'
easement along the east property line and add drainage to the 110' private access, utility and
temporary construction easement.
A drainage easement for the CIM outfall has been added to the plans. The latest information
we had about this easement is that the document has been signed, and should be recorded soon.
City of
Fort Collins
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins. CO 80522
970.221.6750
970.224.6134 - fax
fcgov.com/developmentrevew
February 26, 2013
Mike McBride
1603 Oakridge Drive
Fort Collins, CO 80525
RE: Odell Brewery Parking Lot Expansion, PDP120032, Round Number 2
Please see the following summary of comments from City staff and outside reviewing agencies for your
submittal of the above referenced project. If you have questions about any comments, you may contact the
individual commenter or direct your questions through the Project Planner, Ted Shepard, at 221-6343 or
tshepard@fcgov.com.
Comment Summary:
Department: Engineering Development Review
Contact: Andrew Gingerich, 970-221-6603, agingerich(oDfcqov.com
Topic: Construction Drawings
Comment Number: 5
Comment Originated: 11/27/2012
2/5/2013: It appears that temporary asphalt is still being proposed for the parking lot, it should
be noted that this section of asphalt cannot contain recycled asphalt and per zoning
requirements. 11/27/2012: Sheet C101: Which asphalt section is being proposed. It appears
that there is conflicting callouts on this sheet and the detail that is referred to shows two different
pavement sections.
A temporary asphalt parking area is still being proposed. The paving section on sheet C400 no
longer shows recycled asphalt as an option, and shows only a regular asphalt surface
Comment Number: 7 Comment Originated: 11/27/2012
2/512013: During the previous review it appeared that Colorado Iron and Metal would be
approved prior to this project. However, now it appears either project could come before the
other and the grading in the northeast corner of the project will need to reflect this. Please
provide a separate detail or design tying in the grading with the assumption that Colorado Iron
and Metal will not have their improvements complete. If grading contours will need to tie on
adjacent properties not owned by Odell's than a letter of understanding will need to be
provided prior to hearing. 11/27/2012: Sheet C300: Please label the elevations on the