Loading...
HomeMy WebLinkAbout4900 BOARDWALK DR - APPLICATIONS - 11/4/2014City of Collins Planning, Development & Transportation 281 N. College Ave P.O. Box 580 Fort Collins, CO 80524 Phone 970-416-2740 Fax 224-6134 OVER-THE-COUNTER PERMITS ONLY This application is to be used to apply for the following permits only (check all that apply). ❑ Air Conditioning ❑ Demolition (interior non-structural) ❑ Electrical Alteration (not service change) ❑ Gas Lighter ❑ Gas Log ❑ Heating Unit ❑ Lawn Sprinkler ❑ Mobile Home replacement ❑ Roofing ❑ Sewer Line ❑ Photo -voltaic ❑ Ventilation ❑ Water Heater ❑ Water Line ❑ Wood/Pellet Stove (must be EPA certified, provide make, model and manufacturer). Complete all applicable information on the application. Incomplete applications will not be accepted. Application # I � Date I '—i For office use only Job Site Address (required) Value of Construction (labor, materials, profit) _re1 7S �04 ee llc PA C6 ;OSZ 1�i/ G Property Owner Name Address City/State Zip Phone r04-r r1,/ vL_44 ZW3V l0V - f'-3/0 ( Applicant Name Address City/State Zip Phone �'7#57 S. gelds SIT. -F8 (6 F652-b Q� zl� P77 Contractor Address City/State Zip Phone Contractor City of Ft. Collins Sales Tax # Are you paying taxes here or by report? )?'-Here ❑ Report Sales tax number is required by all contractom Are you paying with your trust account? ❑ Yes �RNo Is this a residential or commercial project? Residential ❑ Commercial If residential, is it: ❑ Single Family Detached ❑ Condo/townhome (single family attached) Multifamily (apartment) ❑ Garage If commercial, is it: ❑ Bank ❑ Bar ❑ Church ❑ Hotel/Motel ❑ Medical office ❑ Office ❑ Duplex ❑ Retail ❑ Restaurant ❑ Other (explain) Is this building 50 years of age or more? ❑ Yes Q-No If yes, you mayneed to contact Historic Preservation If this is for a demolition permit, what year was the building constructed? If prior to 1975, you will need an asbestos assessment to submit with this application. Description *If lawn sprinkler/backflow preventer, must list licensed plumber. If first-time A/C, must list licensed electrician. Subcontractors: List the company name or City of Ft Collins license # Electrician Plumber Mechanical Roofer Other I hereby acknowledge that I have read this application and state that the above information is complete and correct. I agree to comply with all requirements contained herein and city ordinances and state laws regulating building construction. Iknow that a permit is not valid until it has been paid and issued. Applicant: Print NameJ&4 Signature Date r su