Loading...
HomeMy WebLinkAboutODELL BREWERY PARKING LOT EXPANSION - PDP - PDP120032 - CORRESPONDENCE - (7)Topic: Site Plan Comment Number: 7 Comment Originated: 02/05/2013 02/05/2013: There are some line over text issues. Comment Number: 8 Comment Originated: 02/05/2013 02/05/2013: There is some text that needs to be flipped 180 degrees. See redlines. Comment Number: 9 Comment Originated: 02/05/2013 02/05/2013: The legal description needs to match the Subdivision Plat. Department: Zoning Contact: Noah Beals, 970-416-2313, nbeals(a)fcgov.com Topic: General Comment Number: 1 Comment Originated: 11/28/2012 02/05/2013: The new parking area should maintain an average of 1 foot-candle. 11/2812012: The new parking area is not meeting the minimum 1 foot-candle requirement. Comment Number: 2 ` Comment Originated: 01/25/2013 01/25/2013: Is there a raised curb along the new stalls in the new parking area? If not wheels stops will need to be included (LUC 3.2.2(M) Figure 5). Comment Number: 3 Comment Originated: 02/05/2013 02/05/2013: Vehicle use areas are required to paved with asphalt or concrete not recycling asphalt. I believe this was correct however I do not review the civil drawings and was not sure it was corrected there also. Topic: Lighting Plan Comment Number: 2 02/05/2013: No plans were included in our review set. 11/28/2012: The plans need to be 24"x36" in size. Topic: Plat Comment Originated: 11/28/2012 Comment Number: 11 Comment Originated: 02/05/2013 02/05/2013: The boundary and legal description close. Comment Number: 12 Comment Originated: 02/05/2013 02/05/2013: The boundary and legal description do not match. See redlines. Comment Number: 13 Comment Originated: 02/05/2013 02/05/2013: Please correct the spelling of Odell in the title block on both sheets. Comment Number: 14 Comment Originated: 02/05/2013 02/05/2013: Are there any lienholders? If so, please add the Lienholder signature block. Comment Number: 15 Comment Originated: 02/05/2013 02/05/2013: There is no reference to a title commitment. Comment Number: 16 Comment Originated: 02/05/2013 02/05/2013: Please label all easement widths on sheet 2. See redlines. Comment Number: 17 Comment Originated: 02/05/2013 02/05/2013: There are line over text issues on sheet 2. Comment Number: 18 Comment Originated: 02/05/2013 02/05/2013: There are easement lines that need additional distances shown to be locatable. See redlines. Comment Number: 17 Comment Originated: 02/06/2013 02/06/2013: All recording information for the easements shown on sheet 2 must be provied prior to filing with the City. Comment Number: 18 Comment Originated: 02/06/2013 02/06/2013: There are drainage easements and a detention pond easement that were shown on Odell Brewing Company First Replat, that are not shown on this Plat. Are these easements to be vacated? Comment Number: 19 Comment Originated: 02/06/2013 02/06/2013: Please label all surrounding properties as unplatted or with reference to the Subdivision Plat if platted. This includes the properties on the south side of East Lincoln Avenue. Comment Number: 20 Comment Originated: 02/06/2013 02/06/2013: The northeast corner of the "Fred's House LLU property shows a found #2 rebar, but the previous Plat (Odell Brewing Company First Replat) shows a found 10" spike and post angle iron. Please explain this. Comment Number: 21 Comment Originated: 02/06/2013 02/06/2013: There is a portion of the "drainage easement to the City of Ft Collins (hatched area)" along the east side, that does not match the previous Plat (Odell Brewing Company First Replat). Has this portion been vacated, or is it to be vacated by this Plat. 02/05/2013: Sheet C100 -The two easements shown on this sheet do not appear on the Plat. The Colorado Iron and Metal should be removed since the outfall location has moved. The existing drainage easement should remain on the plat unless it was vacated or being vacated. Comment Number: 11 Comment Originated: 02/05/2013 02/05/2013: Sheet C200 - Additional easement will need to be included for "drainage" to accompany the Colorado Iron and Metal storm drainage outfall. Comment Number: 12 Comment Originated: 02/05/2013 02/05/2013: Sheet C300 - Contours will need to be shown on this sheet tieing to existing without Colorado Iron and Metal design as well as with their design since at this point it is unclear which project will be completed first. If grading needs to occur on property not owned by Odell's to tie contours then a letter of understanding will be required prior to hearing. Comment Number: 13 Comment Originated: 02/05/2013 02/05/2013: Sheet C300 - Please label existing contours with elevations on the Colorado Iron and Metal project to show more clearly how the grading will tie together. Comment Number: 14 Comment Originated: 02/05/2013 02/05/2013: Sheet C400 - Remove recycled asphalt callout from this sheet. Topic: Plat Comment Number: 8 Comment Originated: 02/05/2013 02/05/2013: Drainage easement Rec. No. 95073186 in the southwest corner is not shown on the plat. It is my understanding that this easement would need to remain to incorporate drainage pond. Comment Number: 9 Comment Originated: 02/05/2013 02/05/2013: Colorado Iron and Metal drainage outfall pipe will need to be accompanied with a drainage easement instead of a utility easement. Consider adding drainage to the 10' easement along the east property line and add drainage to the 110, private access, utility and temporary construction easement. Department: Stormwater Engineering Contact: Wes Lamarque, 970-416-2418, wlamargue(a)fcgov.com Topic: General Comment Number: 3 Comment Originated: 02/05/2013 02/05/2013: The emergency spill for the pond looks to be around 4945, not 4943.8. This looks to be the elevation the pond would fill to before spilling south down the drive aisles. Please verify and change note on grading plan. Comment Number: 4 Comment Originated: 02/11/2013 . 02/11/2013: Stormwater is ready for a hearing. Department: Technical Services Contact: Jeff County, 970-221.6588, Topic: Construction Drawings Comment Number: 10 02/05/2013: No comments. lcountyC�fcgov.com Comment Originated: 02/05/2013 Ct`yxof ` � Y Fort Itin sz Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax t6gov. com/developmentre view February 26, 2013 Mike Mcbride 1603 Oakridge Drive Fort Collins, CO 80525 RE: Odell Brewery Parking Lot Expansion, PDP120032, Round Number 2 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Ted Shepard, at 221-6343 or tshepard@fcgov.com. Comment Summary: Department: Engineering Development Review Contact: Andrew Gingerich, 970-221-6603, agingerich(a)fcgov.com Topic: Construction Drawings Comment Number: 5 Comment Originated: 11/27/2012 2/5/2013: It appears that temporary asphalt is still being proposed for the parking lot, it should be noted that this section of asphalt cannot contain recycled,asphalt and per zoning requirements. 11/27/2012: Sheet C101: Which asphalt section is being proposed. It appears that there is conflicting callouts on this sheet and the detail that is referred to shows two different pavement sections. Comment Number: 7 Comment Originated: 11/27/2012 2/5/2013: During the previous review it appeared that Colorado Iron and Metal would be approved prior to this project. However, now it appears either project could come before the other and the grading in the northeast corner of the project will need to reflect this. Please provide a separate detail or design tying in the grading with the assumption that Colorado Iron and Metal will not have their improvements complete. If grading contours will need to tie on adjacent properties not owned by Odell's than a letter of understanding will need to be provided prior to hearing. 11/27/2012: Sheet C300: Please label the elevations on the contours from Colorado Iron and Metal. Additionally add a note or someway to denote that those contours are from another project and not a part of these plans. Comment Number: 10 Comment Originated: 02/05/2013