HomeMy WebLinkAboutODELL BREWING CO. EXPANSION - MAJOR AMEND./REPLAT - 21-08 - SUBMITTAL DOCUMENTS - ROUND 1 - CORRESPONDENCE-CONCEPTUAL REVIEW22. A plat or replat will not be required but only so long as the improvements north of the
existing platted lot line do not consist of a building. Response: A re -plat has been
submitted to merge the two previous lots, vacate easements, and dedicate new
easements. No buildings are proposed north of the plat boundary. A private access
easement (by separate document) has been provided, along with a letter of intent from
the land owner allowing the truck turnaround.
23. The normal Utility Plans, Development Agreement and Development Construction
Permit will be required. Response: Acknowledged.
24. 1 have enclosed a copy of the Administrative Interpretation which allows for porous
concrete to satisfy the paving requirements of Section 3.2.2(D)(3). Please contact
Dana Leavitt, 221-6750 for further information. Response: Acknowledged. The design
team has been working with the City and the LID committee for the use of pervious
pavement in the proposed parking lot. The City/LID has agreed to cost sharing of the
pervious pavement improvements.
25. Please provide a letter stating the company's recycling policy and processes as this
should be sufficient to meet the requirements of 3.2.5 Trash and Recycling Encloses
section of the Fort Collins Land Use Code (LUC). Response: See attached letter.
26. In addition to providing bike racks near the tap room entrance, you may want to
consider adding bike racks around the detention pond to accommodate the number
of bicyclists that visit the brewery on Saturdays and holidays. Response: Additional
bike parking spaces have been provided exceeding the minimum requirements.
27. Fort Collins native plant material will be required to be planted within buffer zones.
We would also like to encourage the applicant to consider planting native plant
material for landscaping. Response: Acknowledged. Native plant material may be
used in the detention pond area as well as the buffer zone.
28. We would like to encourage the applicant to consider contacting Gary Schroeder,
221-6395 to explore utilizing the City's Design Assistance Program to help design an
energy efficient/sustainable building. Response: The design team has met with Gary
Schroeder and is very interested in using integrated design to optimize the energy
performance of this building. We will work with Gary to determine what design
assistance is available to make this a more sustainable building.
Responses to CRT Comments Page 5 of 5
foot driveway separation required for arterial streets. As shown, it is too close to Third
Street, the east parking lot entrance, and driveways across the street. A variance to
this Street Standard would be required. Such a variance must be supported by a
Transportation Impact Study. The evaluation of the request is made by the
Engineering Department and is not forwarded to the Hearing Officer. Response: A
variance request letter has been provided by Northern Engineering, and a
Transportation Memo has been provided by Delich and Associates.
16. The scope of the aforementioned T.I.S. should be determined by Traffic Operations
Department. Please contact Word Stanford, 221-6820, for further information.
Response: Delich and Associates has contacted Ward and met with the Traffic
Operations Department to determine the scope of a T.I.S. Memo.
17. No new right-of-way is needed for Lincoln Avenue. But, as an arterial street, the
applicant is required to provide the ultimate design of the fully improved roadway to
ensure that improvements along the property's frontage will tie in with future
improvements to the east and west. In particular, the vertical design is most important
to make sure that there is positive drainage along the roadway. The extent of this
design is 1,000 in both directions. Response: Since the ultimate section and alignment
of Lincoln Avenue are unknown at this time, the Applicant proposes to incorporate a
pro -rated design fee into the local street frontage escrow fund for Lincoln Avenue
improvements. This approach is similar to what In -Situ did (no ultimate design, off -site
1,000LF, etc.), and will allow for a more comprehensive design in the future.
18. As the developer, Odell Brewing is required to improve the frontage along the Lincoln
Avenue. Or, at the determination of the City Engineer, these improvements may be
escrowed for future roadway improvements along Lincoln to be constructed in a more
comprehensive manner than just the subject property's frontage. Response: In
accordance with # 17 above, this expansion will not include the design or the
construction of frontage improvements to Lincoln Avenue. Instead, the Applicant will
escrow the local street portion, which has been estimated in the range of $111AF, or
approximately $51,615.
19. Any discussion regarding diagonal or parallel parking along Lincoln Avenue would
involve meeting with staff from Engineering, Transportation Planning and would follow
the direction of the Downtown River District Plan. Response: Any further discussion
regarding diagonal or parallel parking along Lincoln Avenue will involve appropriate
City Staff in terms of the 'larger picture' and related overlay districts.
20. At the time of submittal for the Major Amendment, the applicant will be assessed the
Transportation Development Review Fee. This fee is based on a formula. Please
contact Randy Maizland, 221-6605 for an estimate of this fee. Response: A check for
the Transportation Development Review Fee is included in this submittal.
21. New construction will be assessed two transportation related fees collected at the time
of Building Permit issuance. First is the City's Street Oversizing Fee and second is
Larimer County's Road Impact Fee. For an estimate of these fees, please contact Matt
Baker in the City's Engineering Department at 221-6605. Response: Acknowledged.
to CRT Comments Page 4 of 5
there is less than 1000 but more than 350 square feet of new imperviousness, a site
grading plan is all that is required. Water quality treatment is also required as
described in the Urban Storm Drainage Criteria Manual, Volume 3 — Best
Management Practices (BMPs). Extended detention is the usual method selected for
water quality treatment but all BMPs are encouraged and can reduce the water quality
capture volume for extended detention. The Stormwater Utility is willing to work with
the applicant on "experimental" BMPs and actually have the LID committee review and
suggest BMPs to use on the site. There is a possibility that the Stormwater Utility would
assist financially if there was a BMP that was more "experimental" in nature. The
Utility is interested in assisting in the implementation of various BMPs to evaluate the
effectiveness and maintenance required. The applicant needs to involve the Utility and
the LID Committee early on in the design stage. Response: Acknowledged. Please see
Drainage Plan and Report for detailed information.
A revised drainage and erosion control report and construction plans are required and
must be prepared by a Professional Engineer registered in Colorado. The design of
this site must conform to the drainage basin design of the Dry Creek Master Drainage
Plan as well the City's Design Criteria and Construction standards. Response:
Acknowledged.
10. The city wide development fee is $4,420/acre ($0.1015/sq.ft.) for new impervious
area over 350 sq.ft. No fee is charged for existing impervious area. This fee is to be
paid at the time each building permit is issued. Response: Acknowledged.
11. The site is in the Cache La Poudre 500-year floodplain now because the Oxbow levee
took it out of the 100-year floodplain. The previous variances for the site related to
Dryland Access and the floatable materials (delivery trucks) which are no longer
needed because either the regulations changed (Dryland access no longer required)
or the mapping changed and the regulation no longer applies (floatable materials).
The only restriction in the 500-year floodplain is no life -safety and emergency
response critical facilities. For further information, please contact Glen Schlueter,
221-6700. Response: Acknowledged. No life -safety or emergency response critical
facilities are proposed.
12. Water/Wastewater comments: Existing mains: 16-inch water main in Lincoln, 8-inch
sanitary sewer in Lincoln (East 1 /3 of site). There is an existing 2-inch domestic water
service and a 6-inch fire line providing service to the building. Response:
Acknowledged,
13. As a part of the expansion, provide a sampling/monitoring manhole on the sewer
service for testing the strength of the process wastewater. Response: The ability to
sample/monitor process wastewater will be provided with the new system designed by
Stewart Environmental.
14. No change to the existing water service is planned at this time. For further
information, please contact Roger Buffington, 221-6700. Response: Correct.
15. Lincoln Avenue is classified on the Master Street Plan as a four -lane arterial street.
The proposed driveway that would serve the west parking lot does not meet the 460-
Responses to CRT Comments Page 3 of 5
to 40-feet and to waive the use of six-foot high walls and/or fence to satisfy side lot
parking lot screening.
4. A maximum number of .75 spaces per employee are allowed. This standard may be
slightly increased to provide parking for shift overlap or other factors unique to the
operation of the facility. Section 3.2.2(K)(3) allows for the number of spaces to be
increased as an Alternative Compliance provision. In order to take advantage of this
provision, and to allow an increase in parking on the west side for the tap room,
please provide information regarding public usage of the tap room. Response: As the
site plan delineates more parking than is allowed per the .75 spaces per employee
maximum, the applicant would like to take advantage of the Alternative Compliance
provision. In addition to employee parking there is a need to provide parking for
public usage. The tap room has a 225 person capacity and is usually full on
Thursday and Friday afternoon from 3-6pm. Typically, the tap room is full on
Saturdays from 11 am-bpm on Saturdays. Odell Brewing Co. also sponsors charitable
events at the brewery about twice a month with an average attendance of 75 people.
5. The parking lot should be screened from the west property line in a manner that may
incorporate berming, landscaping, low screen walls or any combination of sufficient
opacity to block at least 75% of the light from vehicle headlights [Section
3.2.1(E)(4)(b)]. Response: As noted in item #3, the Request for Modification
addresses this requirement and proposes screening through the use of berming and
dense landscaping. Additionally, several large evergreen trees on site are proposed to
be transplanted for screening and will provide immediate year-round impact.
6. Electrical power is available along Lincoln Avenue. Presently, the building is served by
a 150 kva transformer. For the addition, please provide a Commercial One ("C-1 ")
Form and a One -Line Diagram, prepared by the electrical contractor, to determine if
the existing transformer is adequate. Normal site and development charges will apply
to the new construction. Be sure that the Major Amendment clearly delineates a
phasing line between current and future improvements to the north so that Light and
Power fees and charges are assessed accordingly. For further information, please
contact Rob Irish at 221-6700. Response: A C-1 form and One -Line Diagram will be
provided during the building permit phase. The only improvement proposed north of
the property line is the truck turn -around, which is illustrated on the Site Plan.
7. In the Dry Creek basin, the two year historic release rate is 0.2 cfs/acre. There are
issues with the capacity of the Lincoln channel which is the outfall for this site. Please
contact Rex Burns (498-5721) at the Lorimer County Engineering Department for any
requirements they may have. There are properties to the east that are flooded
frequently so the County has required special release rates or delayed release into the
channel. Any Low Impact Development (LID) measures used will lessen the impact on
the Lincoln Channel. Response: The 0.2 cfs/acre release has been used in the
calculations. In addition, the LID techniques (specifically, the infiltration component)
will dramatically reduce the burden on the Lincoln Channel.
8. If there is an increase in imperviousness greater than 1000 square feet, onsite
detention is required with a 2 year historic release rate for water quantity. Parking lot
detention for water quantity is allowed as long as it is not deeper than one foot. If
Responses to CRT Comments Page 2 of 5
Responses to CRT Comments
Odell Brewing Co. Expansion
ITEM: Odell Brewery Expansion — 800 East Lincoln Avenue
MEETING DATE: May 12, 2008
APPLICANT: Odell Brewing Company, 800 East Lincoln Avenue, Fort
Collins, CO 80524 c/o Mr. Bruce Hendee, B.H.A. Design,
1603 Oak Ridge Drive, Fort Collins, CO 80525.
LAND USE DATA: Request to expand the brewery by adding approximately
20,000 to 25,000 square feet for all aspects of the brewing operation. This includes
expansion of the fermentation tanks, cooler facilities, warehouse and offices. In addition, a
new customer parking lot for approximately 78 spaces on the west side of the building is
proposed to serve the new entry to the tap room. A new truck dock at the northwest corner of
the expanded building would be provided.
COMMENTS:
The site is zoned I, Industrial. The brewery operation is considered light industrial
which is permitted in the Industrial zone. The request would be processed as a Major
Amendment. Since the new structure is less than 50,000 square feet in gross leasable
area, it is subject to Administrative Review (Type One) review. Although a city -
sponsored neighborhood information meeting is not required, contacting the
surrounding property owners prior to the public hearing is recommended. Response:
Acknowledged. As suggested, an informational meeting facilitated by BHA Design was
conducted on June 18, 2008.
An Overall Development Plan will be required. This O.D.P. can be submitted and
reviewed concurrently with the Major Amendment. Response: Through a subsequent
conversation with Ted Shepard, the applicant has on understanding that an alternative
approach is available since the off -site improvements (parking & truck turn -around) to
the north will be within a dedicated private access easement. Outside of the access
easement, the Owner currently has only long-range plans for the use of the vacant lot
to the north.
3. A minimum of 80 feet of buffer is required along the west property line. A Request for
Modification to reduce this buffer may be submitted as a stand-alone application prior
to consideration of the Major Amendment. As with the Major Amendment, the
Modification will be forwarded to the Hearing Officer as an Administrative Review.
Or, the Modification may be considered concurrently with the Major Amendment.
Response: A Request for Modification has been submitted to the City and is currently
under review. The Modification Letter includes a request to reduce the 80-foot buffer
C%aNdEPTrIAL lIESP//U.rr
Responses to CRT Comments Page 1 of 5