Loading...
HomeMy WebLinkAbout4380 ZIEGLER RD - SPECIAL INSPECTIONS - 5/13/2014`. I Avago Building 4 West Expansion — Silane Storage Structural Calculations Martin/Martin Project No. 12.0167.S.01 May 13, 2014 MAY 13 MARTIN/MARTIN m0000 CONSULTING ENGINEERS 12499 WEST COLFAX AVENUE, LAKEWOOD, COLORADO 80215 MAIN 303.431.6100 MARTI NMARTI N.COI%4 MARTIN/MARTIN CONSULTING ENGINEERS 1 Title Date Job nQ. Subject' By SheetZof I ry�1ILI I ( 171 ' 1, I ; fjitiaa� 1 _' 1 I 'd -- - L , MARTIN / MARTIN CO NHOLTIN� ENO(NEEN9 Title 41 7a �fj`� Date %f �/� J Job no. Subject f`Oviw (7jof-5 By 1�rl W Sheet /of 1. L _TT izF1 ,L -L -- -� I _ —I� r • _ -� _7LI IS J li Li IT fr IV I I .. 1 �� i i h ►-all A 1C MARTINI /MAR-rm C.d NH YLTING ENGINEERS it Title Subject Date ILY 7/0 % Job no. By VW Sheet I_-rT I 1 - - ---F �i_ � rt r�'� it j y r r � , 4 Gravitv Beam Desien RAM SBeam v4.0 Licensed to: RAM International 05/12/14 11:20:35 STEEL CODE: AISC360-05 ASD SPAN INFORMATION (ft): I -End (0.00,0.00) J-End (22.00,0.00) Beam Size (User Selected) = W16X26 Fy = 50.0 ksi Total Beam Length (ft) = 22.00 Mp (kip-ft) = 184.17 Top flange braced by decking. LINE LOADS (k/ft): Load Dist (ft) DL LL 1 0.000 0.026 0.000 22.000 0.026 0.000 2 0.000 0.200 0.800 22.000 0.200 0.800 SHEAR: Max Va (DL+LL) =11.29 kips Vn/1.67 = 70.51 kips MOMENTS: Span Cond LoadCombo Ma @ Lb Cb Q Mn / Q kip-ft ft ft kip-ft Center Max + DL+LL 62.1 11.0 0.0 1.00 1.67 110.28 Controlling DL+LL 62.1 11.0 0.0 1.00 1.67 110.28 REACTIONS (kips): Left Right DL reaction 2.49 2.49 Max +LL reaction 8.80 - 8.80 Max +total reaction (factored) 11.29 11.29 DEFLECTIONS: Dead load (in) at 11.00 ft = -0.137 L/D = 1933 Live load (in) at 11.00 ft = -0.483 L/D = 547 Net Total load (in) at 11.00 ft = -0.620 L/D = 426 r Gravity Beam Design RAM SBeam v4.0 Licensed to: RAM International 05/12/14 11:22:22 STEEL CODE: AISC360-05 ASD SPAN INFORMATION (ft): I -End (0.00,0.00) J-End (31.00,0.00) Beam Size (Optimum) = W18X40 Fy = 50.0 ksi Total Beam Length (ft) = 31.00 Mp (kip-ft) = 326.67 Top flange braced by decking. POINT LOADS (kips): Flange Bracing Dist (ft) DL LL Top Bottom 10.333 2.49 8.80 No No 20.667 2.49 8.80 No No LINE LOADS (k/ft): Load Dist (ft) DL LL 1 0.000 0.040 0.000 31.000 0.040 0.000 SHEAR: Max Va (DL+LL) =11.91 kips Vn/1.50=112.77 kips MOMENTS: Span Cond LoadCombo Ma @ Lb Cb Q Mn / Q kip-ft ft ft kip-ft Center Max + DL+LL 121.5 15.5 0.0 1.00 1.67 195.61 Controlling DL+LL 121.5 15.5 0.0 1.00 1.67 195.61 REACTIONS (kips): DL reaction Max +LL reaction Max +total reaction (factored) DEFLECTIONS: Dead load (in) Live load (in) Net Total load (in) Left 3.11 8.80 11.91 Right 3.11 8.80 11.91 at 15.50 ft = -0.303 L/D = 1226 at 15.50 ft = -0.906 L/D = 411 at 15.50 ft = -1.209 L/D = 308 MARTIN / MARTIN CONs"LI 1N:0 ENDINKERM Title v�icQ �� Qate � Jobno. Subject ,o V� `�r�� ��-e-A,f BY �'Lw Sheet,! of • 7--.—._. I_ $ L - _,- I sC'js.►��. ,Q� //�� p� per, ' IL II 1 II it I 4 r- -� -T--- } LEI i, I_ _ i it-h- - �� • J 9 - -� i OVA go -MARTIN/ MARTIN CCNBIILTIN6 ENGINEERS 3 Job no. Subject SOUT74 �NE gTD$Ae BY SLW Sheetlof ----- -------------- -- - ___UP 2iwi7l it �� -- I:_ •. •_�-�- j -.---�- ,'- ) _ �_�'r-�-1 fir-- � i.. � ._L-.< -.�. __.-� I i is F TI 'fpo;. I% C� ► i� '; S�;T 3 �ks'iAl —1 1 L I .._� -I ! - -- - . -. ALLi —�— I _, _I l MARTIN./ MARTIN CONOULTINO EN�INEE RB Date, I I IgI13 Job no, subject SP UT-H S� r-AE S27a F By 55iyj Sheet-3of `Fes 3EI II �_ 2 aka • _� ._1__.I_�i I I Vb;- i 30ITF— {° -A--l- , l 4 1 �- tj MARTIN/MARTIN 400000 000"000NSULTING ENGINEERS Title Pm^� 1M- Dite-vq)m Job no. Subject s I I. By Sheet I of __ T 7-i 1:2 - I; -+ --�,� � - 1 -- ! �� _� i �►. I. Imo_ � fit I QJ6914 I i I