Loading...
HomeMy WebLinkAbout617 S SHERWOOD CT - SPECIAL INSPECTIONS - 5/22/2012MIBAR ENGINEERING LTD 6825 SILVER PONDS HEIGHTS MICHAEL F. REYNOLDS, D.E., P.E. SUITE 101 JOHN A. BLIND, D. PHIL., P.E. MBAR COLORADO SPRINGS, CO 80908 MOLLY S. LUGO, B.S., P.E. Phone:719-487-0812 Fax:719-481-9204 Email: reynolds—Mf@msn.com msn.com May 22, 2012 Solomons Construction 16605 Dancing Wolf Way Colorado Springs, CO 80908 Re: Foundation Footer and Wall Steel Compliance, 617 S. Sherwood Court Fort Collins, CO, MIBAR #11382 Dear Sir, Per the requirements of the City of Fort Collins Building Department, the footer and wall steel are in compliance with the engineered foundation design, MIBAR Project #11382. All of the footings were properly sized, placed and reinforced. The concrete wall steel reinforcement at subject address was also to be in conformance with the engineered foundation design requirements. All steel reinforcement and wall thicknesses were placed and/or sized according to the design. As per the open hole letter dated March 23, 2012 by Geoquest, perimeter drains are not required; therefore, no waterproofing is required. Foundation components are 8' from the property line meeting the setback requirement of 5'. Please do not hesitate to call us if you have any further questions. Ati Michael F. Reynol , RE