Re: Foundation Footing Observation
Lot 45 — Harmony Ridge
Fort Collins, Colorado
EEC Project No. l 1-01-288
Mr. Williams:
Earth Engineering Company, Inc. (EEC) personnel have completed the construction
observation services you requested for the referenced project. Those services included an
observation of the foundation footing dimensions placed for the referenced address. The
results of the site observations completed by EEC personnel are included with this report.
On December 27, 2011, EEC personnel observed footing foundation widths for the
foundation footings for the above referenced single-family residence. The garage and
crawlspace footings were approximately 16 and 36 inches wide by 10 inches thick at
various locations. The basement footings were approximately 16, 22 and 36 inches wide
by 10 thick at various locations. Two #4 bars were placed horizontally and continuous
throughout the length of the footings. The basement pads observed were approximately
34 inches by 34 inches by 12 inches thick and 39 inches by 39 inches by 12 inches thick.
Four #4 bars were in position to be placed horizontally each way in the pads.
At the time of our observations, it appeared that the foundation footing dimensions and
observed reinforcing steel had been placed in general accordance with the construction
plans prepared by Dossey/Sudik Structural Engineers (Plan No. 6) dated October 21,
2011.
F,0,_BQX 271. ,4Z8 COLOF+ADO $PRI
P asg66L'o 2.
FORT;GO•L.LINS GOLORADO'6Q52Z 1 �}�$;
RRDO Soea9.9322
t9705' 224 I',5'2Z tFpX) 661.025,2 f7„19);442'$8-t3 (FAX) 447-9635.
January 1'6, 201:1
EARTH ENGINEERING
COMPANY, Ii4c.
The Pauls Corporation
270 St. Paul.Street
Denver, Colorado 80206
,Attn: Mr. Landon.Williams
Re: Foundation Drain and Damp Proofing;Observation
Lot 45 —Harmony Ridge
,Fort Collins, Colorado
EEC .Project No. I 1-01-288
Mr. Williams
As requested, .Earth Engineering Company, Inc. (EEC) personnel -have completed the, construction.
observation.servicesyou requested for the referenced project. Those services includedobservations of the
foundation. -drain, Pplacement and: damp proofing at the referenced' address. Tlie results of those
observations are; included with -this report:
On January 10, 2012, EEC personnel observed :the ;foundation drain for the :referenced. project. The
foundation;drain consisted of 4-inch perforated pipe overlying,a plastic liner and+bedded,in gravel around
the below ,grade exterior perimeter of the: structure: The gravel was covered with filter fabric.. Various
locations were spot.checked and-measured.from the top of the footing to determine(slope and the drain,
appeared to slope.toward the basementsump pit. The damp proofing consisted ofa grey: spray -on ,coating
that appeared wcover all exterior below,grade-living areas, of.the basement• walls.
We appreciateAbe opportunity to be: of service to you on this project, If you have,'any questions regarding
this report, or if we can:be of further service to:you in anyway; please do not hesitate to contact us.
Very truly yours,,
Earth, Engineering Company, Inc.
MichaelJ. Coley, P.E.
Principal Engineer
cc:, IvIr.,Landon Williams '{Iandon:willianigno raulscorp coif )
P.O. BOX 27 1 428 p0. BOx, 49322:
FORT COLLINS, COLORADO 80527• 1 428 COLORADO SPRINGS.;' COLORA00'80949-9322
(9.70). 224-:1522' (FAX) 663-0282' (719). 442-.6&13 (FAX) 447-9535
,E-E,C Project4o. i i-0-11918
.January 16, 2012
Page 2
Eqvh Enginming.Copmpany, Inc.
We appreciate the opportunity. to be of s6rvice.46 you on this project. If you 'have any
questions .regarding 'this, rcp6il, or, it, we .can be of fnrtlietservice ,to you :in any -way",:
,please do not he§itate to'contkfus:
Very truly Yours,
apany, Inc.
.Principal Engineer
MX/41'a
-cc: jL6hdbn
December 19, 2011
The Pauls Corporation
270 St. Paul Street
Denver, Colorado 80206
Attn: Mr. Landon Williams
Re: Foundation Bearing Observation
Lot 45 — Harmony Ridge
Fort Collins, Colorado
EEC Project No. 11-01-288
Mr. Williams:
EARTH ENGINEERING
COMPANY, INC.
As requested, Earth Engineering Company, Inc. (EEC) personnel have completed an
observation of the foundation bearing materials for footing foundations for the referenced
project. The results of those observations along with site photos are included with this
report.
On December 16, 2011, EEC personnel observed foundation bearing materials for the
foundation footings for the referenced residence. We understand the residence will be a
lightly loaded wood frame structure constructed on a partial basement. At the time of our
field observations, part of the building area had been excavated to approximate
foundation -bearing elevation. The garage footing foundation bearing level was at a depth
of approximately 4'/z feet below original grade. Reddish brown clayey sand and gravel
materials with cobbles were observed at foundation bearing level at that location. The
crawlspace footing foundation bearing level was at a depth of approximately 4 to 4%2feet
below original grade. Reddish brown sandy to very sandy clay soils with gravel were
observed at foundation bearing level at that location. The materials observed in the
basement excavation area exposed generally consisted of reddish brown sandy clay soils.
Calibrated hand penetrometer tests indicated that the in -situ sandy clay soils were very
stiff in consistency and the sand and gravel materials were generally dense in
consistency.
P.O;: 6'0x;27:1.428 P.'O., Boz=4B3222
FORT COLUfNS. 'GOLORAD,O. 8052=,7- 1 428': (;OLORA00 JPt31NGS,,.L'OL6RAD0.80949r9322
t97,07 224- I,52Z (FAx) 663-0282 &T19) .442 68 1;3 tWO44;7z9635
EEC"Troject'NoA I'M-, , 288
December 19,2011
,Page 2.
'8iW.6111consolidatidii ;tests v,dree performed, on representative;,sairy.' samples o A I f I tI . i ,foundation
, -
bearing: -materials in .the crawioate,- and baterhent,foiindatidn beari*nW'elevations; "to
deteftrihie �s*,elV-pdtpn wi
th` Varidtion",in moisture content, tb,v4*- S**
clay. soils .arthe cramilsp bearing 161�e'ls,showe�(t'lli*,PotdhtidI
aqe anct basement
for sw.ell"miz:at:Dresent:moisturciand,density conditions.
The materials dbserve&iff the excavation.were genera .. 1 . ly consistent with thoseputlined. in
the soils rep ar E rffi,Engi pg Cqrnp n pqeri py.j..4 c datedjulylO &,Based
ng
onthe nresults offhe outlined field. fesfi ':andobservations; servatibm A is ourop
inion, the ui-situ'
, materials; co.ul-'a'.,be, ,usqdtfor 'support ,ofibe'kpt g1rundationsafib. design 1., net
allowable tofal` load soil; bearing .pressure ;of 1500" psf Care, e t should. �iikpn,110 :4vqtq
, .
pla6in A4yjQu4O4tionIfqoi' 6lementsajid.floor�slabs�on,areasof:fiozens ipg� ,. oil priorio
i;..Onc.ret.6,v..Iacle.menit,.,,
We: appreciate, , the opportunity to U of serv` � to ;you; on ibis: project; I 'hkyq- any,
tqq— 'You,
q 'further iservice, y in lagy, way,
4pifions regarding itW,,reppf( or i
f.'we:,qan 'be, o
iplease, ,do; ,not hesiiAieto,cqnt
PTiqcipaj Fmgilipe.F.
cc: Mr eLandon wil I
Mr;Joe Willson (ioexiilson(a) aW'scorD.CO'M)
LOT 45 — HARMONY RIDGE
FORT COLLINS, COLORADO
EEC PROJECT No. 1 1-01-288
DECEMBER2011
SWELL / CONSOLIDATION TEST RESULTS
Material Description:
Reddish Brown Sandy to Very Sandy Clay
Sample Location:
S-1 @ 4'(Crawlspace Foundation Bearing Level)
Liquid Limit: --
IPlasticity Index: --
I % Passing #200: --
Beginning Moisture: 14.5%
JDry Density: 98.2 pcf
Ending Moisture:
Swell Pressure: 800 psf
1% Swell @ 500 psf: 0.3%
10
8
6
U)
4
2
E
2 0
rdded � Idded
IL -2
-4
0
0
'n -6
0
-8
-10
0.01 0.1 1 10
Load(TSF)
Project: Lot 45 - Harmony Ridge
Fort Collins, Colorado
Project No.: 11-01-288
Date: December 2011
SWELL / CONSOLIDATION TEST RESULTS
Material Description:
Reddish Brown Sandy Clay
Sample Location:
S-2 @ 9' (Basement Foundation Bearing Level)
Liquid Limit: --
IPlasticity Index: --
I % Passing #200: --
Beginning Moisture: 12.9%
Dry Density: 112.0 pcf
JEnding Moisture: --
Swell Pressure: < 500 psf
% Swell @ 500 psf: None
10
I
8
I
i
cn 6 I
4
I
2
j
o
2 0
c
I
� a r dded i
IL _2
c -4
0
m
a
c -6
o �
U ;
j
-10 -
0.01 0.1 1 10
Load(TSF)
Project: Lot 45 - Harmony Ridge -
Fort Collins, Colorado In
Project No.: 11-01-288
Date: December 2011
January 16, 2012
The Pauls Corporation
270 St. Paul Street
Denver, Colorado 80206
Attn: Mr. Landon Williams
Re: Wall Steel Reinforcement Observation
Lot 45 — Harmony Ridge
4702 Prairie Vista Drive
Fort Collins, Colorado
EEC Project No. 11-01-288
Mr. Williams:
2
EARTH ENGINEERING
COMPANY, INC.
Earth Engineering Company, Inc. (EEC) personnel have completed the construction
observation services you requested for the referenced project. Those services included an
observation of foundation wall reinforcement steel for the referenced residence. The
results of the observations completed by EEC personnel are included with this report.
On January 5, 2012, EEC personnel observed the reinforcing steel for the foundation
walls for the referenced residence. The reinforcing steel observed at the garage
foundation walls consisted of two 45 bars placed horizontally at the top and bottom of the
walls. The reinforcing steel observed at the basement foundation walls consisted of two
#5 bars placed horizontally at the top and bottom of the foundation walls. One #4 bar was
placed vertically and horizontally at approximately 12 inches on -center throughout the
length and height of the basement walls. Lap lengths observed were checked and
appeared to meet the minimum required lengths. In addition to the reinforcing steel
observed, the Uffer ground (a.k.a. concrete encased electrode) was also observed. The
Uffer grounding rod consisted of a single piece of #4 rebar tied to the bottom horizontal
reinforcement within the forms and extended approximately 1 foot above the foundation
wall at the northwest corner area of the garage.
R.Q :Box 271-.,42a R01, BPx--49322
FORT COLLINS. CpIpRADp. 6052Z"' (428; COLOFi:BAOp'^.9piijN68 ,6000RA00 80949-932!2
't970) '224-1 522 (FAX) 663,-0282' 'i719) 4'42:=68:k3 (FAX), 447>9635;
EEC Project :-N6 11-01-288
wry -
. I ,, 1
JaPy, 16,2012
Page 2
EiA Eu&6&ribg:Comp.any,jric,
At. the,fime of our observations, it appeared, that the wall reinforcing
--ing steel.had, been
placed' -in general accordance with the; consiructim,planp prepared by Oosse Y.ISudik
Structural, . Engineers (Plan N6,.'6)Aaied.,'O.c06beT 11, 2011
'We appreciate the oDt)o.rbj,ni.tY 19 be of service to ;you on. this project. If you have an
y.
questions .regarding thjsjqp 'r if 'if we.can'bepf fiuther;service t . oypu in any w4y.j
please do not hesitate to contacltv.s,
Very truly Yours;
Earth Engi eeri, " hg Co p , _MP,44yilw:
Nflchael.J. Coley,"'P.E.,
Principal Engineer
`Mjt/iva
ce: Mr., Landon Williams:(Iand6n.viilliamsO ,I)aulscom:com