Loading...
HomeMy WebLinkAbout4380 ZIEGLER RD - SPECIAL INSPECTIONS - 10/3/2011STRUCTURAL STEEL OBSERVATIONS REPORT Irerracon Report Number: 2011 1054.0003 Service Date: 10/03/11 301 N. Howes Report Date: 10/03/11 Ft. Collins, CO 80521 970-484-0359 Client Project Heath Construction Avago Technologies Steel Attn: Paul Leeper 4380 Ziegler Road PO Drawer H Fort Collins, CO 141 Racquette Dr Fort Collins, CO 80522 Project Number: Avago Technologies, building#4 20111054 Visited site to perform observation and testing of structural connections: Upon arrival, observed the following items: Framing Level: Stair case ArealGridlines: At South West corner of building #4 Item # Description Details 4 Connection Type: Structural steel clips and knife plates to original structural steel beams and tube steel Fastener/Descript/Method: Detail/Page No./Plan Date: Discrepancies: Notes / Exceptions: None Contractor observed having completed the missing welds between two stair stringers as requested previously Framing Level: Stair case ArealGridlines: At South West corner of building #4 Item # Description Details 5 Connection Type: Structural steel for stairs, stringers and landings Fastener/Descript/Method: High strength bolts I '/." A325 TC I Impact wrench & spud Detail/Page No./Plan Date: None I None I None Discrepancies: None observed Notes / Exceptions: Contractor observed having "gone back" and tightened the loose nut as requested previously Framing Level: Stair case ArealGridlines: At lowest level Item # Description Details Fastener/Descript/Method: Anchor bolts Detail/Page No./Plan Date: None None None Discrepancies: None observed Notes / Exceptions: Contractor observed having "plug" welded the nuts with insufficient grip as observed previously Fastener/Descript/Method: Detail/Page No./Plan Date: Discrepancies: Notes / Exceptions: ArealGridlines: Pagel of 2 Items referenced above were field connections unless otherwise noted. Connections were visually observed to be in general accordance with the referenced details of the project plans and specifications unless noted in the Discrepancies section. Discrepancies, if any, are further detailed on the attached Discrepancy List. Summary of Structural Steel/ Related Discrepancies Item Reference Location Description Required Date No. Detail Action Resolved see key) 1 None At 1° landing Observed missing welds between stair 1 OK 10-3-11 available stringers seephoto) 3 None At lowest level Observed insufficient "grip" between anchor 1 OK 10-3-11 available bolt and nut seephoto) 1) Contractor to complete or repair in accordance with approved details and coordinate with Terracon Consultants, Inc. to confirm resolution. 2) Contractor to submit RFI or propose remedial action to the Engineer of Record for review and written response. Additional Remarks: Certified Welding Inspector. CWI # 02040043 Services: Structural steel observation. Terracon Rep.: Joseph Radosevich Reported To: Contractor: Heath Construction, Inc. Report Distribution: (1) Heath Construction. Website (1) Teracon Consultants, Inc., Website Reviewed By: The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT lest methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are.not necessarily indicative of the properties of other apparently similar or identical materials. Page 2 of 2