Loading...
HomeMy WebLinkAboutOTTER BOX DISTRIBUTION/WAREHOUSE EXPANSION - PDP & APU - 17-10 - SUBMITTAL DOCUMENTS - ROUND 1 - APPLICATION0 ZF# NORTHERN ENGINEERING DESCRIPTION ADDRESS: 200 S. College Ave. Suite 100 Fort Collins, CO 80524 PHONE: 970.221.4158 WEBSITE: FAX:970.221.4159 1 Northern Engineering.com Lot 9, the AMENDED PLAT OF LOTS 9 AND 10, INTERCHANGE BUSINESS PARK and Lot 11, INTERCHANGE BUSINESS PARK, located in the Northwest Quarter of Section 15, Township 7 North, Range 68 West of the 6th Principal Meridian, City of Fort Collins, County of Larimer, State of Colorado, containing 4.248 acres, more or less. rPL 7WC.1k land planning ■ landscape architecture ■ urban design ■ entitlement July 14, 2010 Otter Box Distribution/Warehouse Expansion at Interchange Business Park Submittal Fee Summary Planning Development Review Fees: Project development plan (PDP) With a Subdivision Plat........................................................................ $ 5,879.00 Addition of Permitted Use Request........................................................ $ 500.00 SignPosting Fee............................................................................... $ 50.00 APO Fee (.75 per label)...................................................................... $ 21.00 Transportation Development Review Fee: Project development Plan..................................................................... $15,658.75 Total................................................................................................. $22,108.75 Thinking outside of the box for over two decades. 401 W. Mountain Ave., Suite 200 ■ Fort Collins, CO 80521 ■ tel. 970.224.5828 ■ fax 970.224.1662 ■ www.vfrdesigninc.com C� Lighting Plans (4 copies 24" x 36" — folded). Alu r_1rr"azardous Materials Impact Analysis (4 copies). -Street cross sections schematics (if not included in the utility plans) (8 copies 24"" x 36" — folded). / Explanation of any variance request(s). Signed letters of intent indicated that all required off -site easement and off -site rights -of -way can be negotiated in time for final development plan submittal. ❑ Other information that the Director may require: — Natural area or environmental study (4 copies) — Wetland Delineation (4 copies) �a� ��re��t� ��a �•`�1 case /zlfulesll *This document is meant to be used as a checklist only. For a more detailed list and explanation of each of these items, please see the handout: "Submittal Requirements: Project Development Plan" Revised March 3, 2010 2 PDP Submittal Requirements City Of Development Review Guide -STEP 3 of 8 art couins SUBMITTAL CHECKLIST: PROJECT DEVELOPMENT PLAN (PDP) The following information is required to be submitted with all applications, unless waived by staff. Any item waived must be dated and initialed by a planner with the City of Fort Collins Communitv Development and Neiahborhood Services Department. Application form, filing fee (plus .75 cents for each APO label), and sign posting fee. Application Form.pdf Transportation Development Review Fee - please contact Engineering at 221-6605 for information. TDR Fees and Application.pdf Three lists (3) of names and addresses of all owners of record of real property within at least 800' of the property lines for the parcel of land for which the project is proposed, exclusive of public right-of-way. (Two (2) lists typed on mailing labels (33 names per sheet) and the other list on a reproducible copy of those labels). Statement of planning objectives (27 copies). 54r-) 41YC-%'V a'X eou*./ nopy f a/pplic ibl�conceptual letter and response letter explaining how issues have been addressed (27 ., copies)j7, 0 f locomplete list of proposed street names for the development. Legal description of the site (one copy on 8'/� x 11" sheet). � ��//c� Name and address of each owner of property within the boundaries of the development pl ,oarea. ' List of names of all general and limited partners and/or officers involve as either applicantsnor own s. n�YDevelopment phasing schedule. Site plan drawings. (Refer to the submittal requirements for specific information to be presented on the S site plan.) (31 copies 24" x 36"- folded). Subdivision Plat (23 copies 24" x 36" - folded). Architectural elevations (8 copies 24" x 36" - folded). Landscape Plan (Refer to the submittal requirements for specific information to be presented on the ') landscape plan.) (21 copies 24" x 36" - folded). Transportation Impact Analysis (TIA) (7 copies). Utility plans (existing and proposed utility systems) (1rcopies 24" x 36" - unfolded). Utility Plans l� Checklist.pdf Requirements for utility plans checklist (1 copy). C� Drainage and erosion control report (4 copies). CeZ Soils Report (3 copies).. Community Development & Neighborhood Services - 281 N College Ave - Fort Collins, CO 80522-0580 Accela Automation: ShowPvsi140 - T8108-D 49 Page 1 of 1 RECEIPT CITY OF FORT COLLINS COMMUNITY DEVELOPMENT & NEIGHBORHOOD SERVICES 281 N. COLLEGE AVE 970.221.6760 PO BOX 580 970.224.6134 - fax Application # : B1004478 Project Name (Subdivision) : OTTERBOX DISTRIBUTION & WAREHOUSE EXPAN. POP & ADD'N OF PERMIT Application Type : Building / Misc / General / NA Receipt No.: 153777 Payment Method Ref Number Amount Paid Payment Date Cashier ID Comments Check 1015 $22,108.75 07/14/2010 01:11:50 PM SLINDELL PLANNING & TDR FEES Owner Info.: Work PLANNING FEES FOR POP W/SUBDIVISION PLAT($5,879) SIGN POSTING Description: FEE ($50) APO LABELS ($21) PLANNING FEES FOR ADDITION OF A PERMITTED USE ($500) TRANSPORTATION DEVLEOPMENT FEE FOR POP ($15,658.75) ALL PAID BY OTTER FCDC, LLP CK#1015 T8108-D Version 4.0 https://dtsweb02. fcgov. com/operations/permit/index. cftn?FUS EACTION=ShowPayDetail... 7/ 14/2010 71 Type of Request Please indicate the type of application submitted by checking the box preceding the appropriate request(s). Additional handouts are available explaining the submittal requirements for each of the following review processes. ❑ Annexation Petition with Initial Zoning REQUESTED ZONE: Fee $1,188.00 + $50.00 sign posting fee + $.75 for each APO label ❑ Rezoning Petition REQUESTED ZONE: Fee 5977.00 + $50.00 sign posting fee + $.75 for each APO label ❑ Overall Development Plan (ODP) Fee: $1,599.00 + $50.00 sign posting fee + $.75 for each APO label ❑ Project Development Plan (PDP) without Subdivision Plat Fee: $3.887.00 + $50.00 sign posting fee + $.75 for each APO label Project Development Plan (PDP) with Subdivision Plat Fee: $5,879.00 + $50.00 sign posting fee + $.75 for each APO label ❑ Fina' Plan without Subdivision Plat Fee: $1,000.00 ❑ Final Plan with Subdivision Plat Fee: $1.000.00 ❑ Modification of StandardslText and Map Amendment Fee: 5200.00+ $50.00 sign posting fee ❑ Basic Development Review Fee:$200.00 ❑ Major Amendment Fee: $3,206.00 + $50.00 sign posting fee + $.75 for each APO label ❑ Non -Conforming Use Review Fee: $1,389.00 ❑ Vacation of ROW or Easement Fee: $5.00 per sheet of filing document ❑ Small Project Fees Fee: Varies -Check with the Current Planning Department ❑ Street Name Change Fee: $5.00 ❑ Extension of Final Approval Fee: 3566.00 ❑ Site Plan Advisory Review NO FEE Addition of Permitted Use Fee: $500.00 + $50.00 sign posting fee + $.75 for each APO label Revised January 21, 2010 2 PDP Submittal Requirements 0 a city of Transportation Development Review Fee Date Received/ Paidlf Fit C�ins �^ �_� .�•� L[ Total Amount Paid Project Name: QIrLgOXp7/1s/� �Jr7Tlt/C%1�MQG Project Location: AIL Sy Date: 7-/!!� •/C7 Type of Submittal Please indicate the type of application submitted by checking the box preceding the appropriate request(s). ❑ Overall Development Plan (ODP) ❑ Final Development Plan (FDP) This fee includes 2 rounds of review ❑ Additional round of review ❑ Annexation S20 X ❑ Minor Amendment ❑ Major Amendment ❑ Re -zone Fee structure amount due S500 each $1000 each S 500 each Foot Notes When a development project involves a change of use for a building, the charge per square foot shall apply to the portion of the overall building size for which the change of use is proposed, provided that the new use generates more traffic than the existing use, as determined by the current Institute of Transportation Engineers Trip Generation. If the new use does not generate more traffic than the existing use then the charge per square foot for shall apply only to the net additional building size (if any). acres = _ + S250 = These fees do not include the cost of filing fees for the recording of $250 each the Development Agreement. When a Development Agreement or Amendment Agreement is entered into the Developer shall be $2,500 each responsible for the cost of recording the document. Said filing fees shall be calculated and provided when the signed document is 5200 each returned to the City for signatures and filing. ❑ Modification to Land Use Code S200 each Wireless Telecommunication Equipment (WTE) $65 each ❑ Road Projects acres (of roadway) X $250 = ❑ Vacation of Easement(s) *** # of vacations _ X $400 = ❑ Vacation of Right(s)-of-Way *** # of vacations _ X $800 = ❑ Dedication of Easement(s) and/or Right(s)-of-Way *** # of dedications _ X $250 = Y. Project Development Plan (PDP) or Basic Development Review Project requiring Transportation Services Review and/or utility plan review. This fee includes 3 rounds of review. Detached Single Family S160 per unit # of units X S 160 = Multifamily or other residential units $115 per unit # of units X S 115 = Commercial, Industrial, Retail, and/or Non residential building square footage $0.25 per square foot tj0351<sq ft X $0.25 = Size of the development (area being platted or if not being platted size of parcel accompanying all development improvements) S250 per acre acres X S 250 = I O&Z-50 Project fee $2,000 each QOQ i Total of above amounts /S bSB.%S If this fee amount exceeds S30,000 then the fee amount shall be adjusted with the following formula: S30,000 + %: (the amount over 30,000 _ The maximum fee for any residential ONLY project shall be $500 per residential unit. This check should be used to verify the fee amount (does not apply to mixed -use developments). PDP fee shall be the lesser of this amount or the above calculated amount. # of residential units X S500 = Reduction for affordable housing — a copy of the City letter certifying/ authorizing the affordable housing shall be provided with this application. Amount of reduction to be applied Total owed for PDP 65 ,7 5 cc: Christie White, Engineering Development Review Engineering *** This fee does not include the cost of filing fees. Filing fees shall be determined at the time of final document submittal and will be required prior to filing. General Information: p�IL Owners Name(s) ,CQMA RIZAI&L0,11 AmcyAkh2rdsor+ Street address: / tn(d rzwm 64 reeG IY " co City/State/Zip: g0 524 Telephone: f76 1p6f3 g44(oFax: O Applicants/ Consultants Firm Name: I L. Contact: l Street address: yfp/ iS74 e2%OJn 7�o/n City/State/Zip: z"OA'P_S Cb eOsL( Telephone: g7 g-M2b Fax: Z Certification: By signing this permit I acknowledge that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection. Name (please print) 41/ 1W / 19( Signature: Telephone: C/ -$ 0 of City Collins Corn r ,0� I -C�6 DEVELOPMENT REVIEW: APPLICATION FORM For Office Use Only Date Submitted 7-1 f -/0 Current Planning File #� -/0 Planner Project Name: ill*r4oK 063Jh"i6= /il� iC Project Location (Street Address): %= &L cdJ � G- RoAd Land Use Information: Gross Acreage/Square Footage: 4.25Ac- Existing Zoning: C Proposed Use: /�0SG Total Number of Dwelling Units: AA Total Number of Affordable Dwelling Units: N�A Percentage of Affordable Dwelling Units (out of total): A�m Total Commercial Floor Area: SDA#5 SF Additional Information (if Applicable): Project Description: 05 SF o7'�',0#7 GX" _5P,i �S&i idAV;n I.Wzl ulc (Choose the type of project from the list on the back) General Information: List all property owners having a legal/equitable interest in the property (attach separate sheets if necessary). Owner's Name(s): Street Address: / &4' Town SAuar� City/State/Zip: fjk&Zo/%y1S 1,12 O51 g Telephone:43i0 Applicant's/Consultant's Name: Name of firm: R k -r Contact: G/%X�jty e r �hyn Street Address: 40"s�/,Gli 1n7f7�h A City/State/Zip: �2i'f' Z:r5 Uns y eO goOS 2/ Telephone: of %O ?24 -562A Fax: 22. 4 -J&i& Z E-mail: �i�7. riolcy rAD/�Y�ksuininc. mm CERTIFICATION I certify the information and exhibits submitted are true and correct to the best of my knowledge and that in filing this application, I am acting with the knowledge, consent, and authority of the owners of the real property, as those terms are defined in Section 1-2 of the City Code (including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for the purpose of inspection, and if necessary, for posting of public notice on the property. L Name (Please PRINT): /nita RIP—ky Address: ¢a/ Ave, /Ey-/ Za/Xiai _ e-D T Telephone: j70-12-4-5-laZfg Signature: (and title showing authority to sign, if applicable) b CERTIFICA TIONMUSTBE SIGNED. a Community Development & Neighborhood Services - 281 N College Ave - Fort Collins, CO 80522-0580