Re: Wall Steel Observation
CARE Housing at Provincetowne
Building 6
Northern Colorado Geotech Project No. c002-11
On March 16 and 18, 2011 a representative of Northern Colorado Geotech performed a reinforcing
wall steel observation at the above referenced project in Fort Collins, Colorado.
The placement of rebar reinforcement within the foundation wall appeared to be in general
accordance with the project plans and specifications.
Additionally, we observed that UFER grounding rebar was incorporated within the foundation wall.
If you have any questions or if we may be of further assistance, please do not hesitate to contact us at
(970) 506-9244.
Sincerely,
Doug Peafcjmn G. °off
President
Re ed by: OR
v+iF•• �`'o
c.�..CDQQ' FAN;
23012
ry G. Wee
Presiden w
Id AL
cc Addressee
Drahota Q
— Derek Cohen (2)
rt't-PEIVED
DRAHOTA CONSTRUCTION
J* 12, 2011
Madid C4mftfton MgnBgemnt
575 Union ftUtevard, Suite 2D2
LakeWood , Colorado 80228
Attn: Shannon SperrY
Re : DrMed F%r Gbeernftft
WE. HaVqlnq at Pr ovinestowne
liqui In 10 a 6
Northam Colamcla Geatech Projea,00. cG02.111
Norftmi��do
MOW
on , Fobruiry 24 WW M . and March 1, 2011, a representaUve Northern -ofNorthernColorado Geotach
performed driller!pier Observoont for SaVing 6 at ft above referenced project in Fort Collins,
Colorado.
The cWHed pier% were observed for pier diamsW, lengM, bearing strata, plumb, and condt1w. Piers
we observed to be I 114nch diameter and. apPMIMMY 33 to 36 feet in, length. MinhTW
groundwo.tar was eno6untered In various piers. The groundwate.r was removed, the plere were
deaned and placerniant o;f:cOMMftWW tieing peftmied eveadi pier was drilled, RabarrainforcIng
yeas observed to be in accordancew4h the pmject plans and specifications. it is our opinion that the
drilled plaft were consft;ated In general accordance Aft the geotechnical engineering report
wommendoWns (Northern C010rado GeOLOM Project No. 07149, dated NoveTnber iS, 2009) end
the engineered fbundatlon plans fbr the project:
If you have any quesdom or if we May be of AnIher awiMnce, please do'not heriftle to contwt us at
(470) SIM9244,
0-
2,30 19
SN prz.
iZz
DMhota (5-DREWW — Derek Cohen (2)