HomeMy WebLinkAbout626 QUAKING ASPEN DR - SPECIAL INSPECTIONS - 2/18/2011February 18, 2011
Medici Construction Management
575 Union Boulevard, Suite 202
Lakewood, Colorado 80228
Attn: Shannon Spent'
Northern
Z* Colorado
Geotech
2966 29th Street, Unit 21
Greeley, Colorado 80631
Phone: (970) 506-9244
Fax: (970) 506-9242
Cot( QU4R)PJA_ ASPeu pp.
Re. Wall Steel Observation PC-Q m- ►`T
CARE Housing at Provincetowne
Community Center Building
Northern Colorado Geotech.Project No. c002-11
On February 17,. 2011 a representative of Northern Colorado Geotech. performed a reinforcing wall
steel observation at the above referenced project in Fort Collins, Colorado.
The placement of rebar reinforcement within the foundation wall appeared to be in general
accordance with the project plans and specifications.
Additionally, we observed that UFER grounding rebar was incorporated within the foundation wall.
If you have any questions. or if we maybe of further assistance, please do not hesitate to contact us at
(970) 506-9244.
Sincerely, Pp�ytEOr►8
NORTHERN COLOR
leftt
Doug L afgrArf, LPG
President $�► ___
Pr
GR w-s�9
N.
213.012
�4,. P.E. CC
f '•. k.
Addres`.S'GNAL E��\�
?;
Drahota Con
— Derek Cohen (2)
FEB 4 U11.
DRANOTA CONSTRUCTION
1005-52.(.,
February 18, 2011
Medici Construction Management
575 Union Boulevard, Suite.202
Lakewood, Colorado 80228
Attn: Shannon Sperry
Northern
Colorado
.Al Geotech
2956 29th Street, Unit 21
Greeley, Colorado 80631
Phone:970) 506.9244
Fax: 1970 506-9242
Co26 Q(iAklmc, ASP:uQ PfL.
Re: Drilled Pier Observations p-�- 3 q
CARE Housing at Provincetowne
Community Center Building
Northern Colorado Geotech Project No. c002-11
On February 7, 2011, a representative of Northern Colorado Geotech performed drilled pier
observations for the community center building under construction at the above referenced project in
Fort Collins, Colorado.
The drilled piers were observed for pier diameter, length, bearing strata, plumb, and condition. Piers
were observed to be 10-inch diameter and approximately 33 feet in. length. Minimal groundwater was
encountered in various piers. The groundwater was removed, the piers were cleaned and placement
of concrete was being performed as each pier was drilled. Rebar reinforcing was observed to be in
accordance with the project plans and specifications. it is our opinion that the drilled piers were
constructed in general accordance with the .geotechnical engineering report recommendations
(Northern Colorado Geotech Project No. 071-09, dated November, 18, 2009) and the engineered
foundation plans for the project.
If you have any questions or if we may be of further assistance, please do not hesitate to contact us at
(970) 506-9244.
Drahota Construction -.Derek Cohen (2)
FEB L 4 011
000TA CONSTRUCVON