Loading...
HomeMy WebLinkAbout4123 VERBENA WAY - CO/LOC - 11/12/2008City of F6rt Collins Neighborhood & Building Services 281 N. College Ave. Fort Collins, CO 80522-o58o Phone: 97o-221-676o Fax: 970-224-6134 Temporary Certificate of Occupancy Permit #: B0706160 Work Description: NEW 3 STORY 44 UNIT APARTMENT BUILDING ON POST TENSION SLAB - (TYPE III STYLE BUILDING. EXTERIOR LIGHTING MUST COMPLY WITH APPROVED DEVELOPMENT PLAN. AFFORDABLE HOUSING PROJECT JOB CONTACT - CITY WATER RES CHECK -AIR SEALING CKLST This is to certify that the building, structure, or land located at 4123 VERBENA WAY Fort Collins, CO has been inspected and temporary occupancy is hereby authorized, effective on 11/12/2008 and conditional upon the following requirements being completed and approved upon final inspection. Zoning Final Requirements to be Completed By: 11/24/2008 10242008 ok for too w/conditions for co: 1. paint wall mounted meter boxes and electric boxes on north and south ends matching wall color 2. remove portapotties and roll -off dumpster from parking lot. too exp 11 /24/08 If such work is not completed within the time set forth above and approved on final inspection, or unless the time for completion is extended by the Building and Zoning Office, an order to vacate the premises, or a violation notice for occupying the building, structure, or land without a Certificate of Occupancy will be issued. Such violation is subject to a maximum fine of $1000.00 per day for every day of violation. Contractor/Owner/Lessee Authorized By o0C Date Date of Issuance NOTE: The issuance of this temporary certificate of occupancy will entitle the owner to place City Utility service in the owner's name. Construction power rates may be substantially higher than the rate to which the owner is entitled. Until the owner contacts the City Utility Office and makes the necessary arrangements to transfer City Utilities to the owners name, utilities will continue to be furnished at construction rates and both the owner of the property and the contractor will continue to be liable to the City for all utility bills. 11/122008 02:11:16 PM Page 1 of 1