Loading...
HomeMy WebLinkAbout3235 MUSKRAT CREEK DR - SPECIAL INSPECTIONS - 10/10/2008AXIOM STRUCTURAL ENGINEERING, LLC 1395 SOUTH GARFIELD AVENUE LOVELAND, COLORADO 80537 October 10, 2008 Project Number: JAMB-08G03-24-40 Jamestown Builders, LLC 3003 East Harmony Road, Suite 400 Fort Collins, Colorado 80528 Re: Footing Dimension and Reinforcement Observation Lot 26, Fossil Lake Ranch 3235 Muskrat Creek i�1 Fort Collins, Colorado (Larimer County) Dear Mr. Everitt: On October 9, 2008 this office observed and approved the continuous spread footing form dimensions (widths and depths) and the interior square footing form dimensions (widths and depths) at the location referenced above. The size, type and installation of the continuous spread footing and the interior square footing reinforcement is approved. At the time of this observation, the #4 hooked dowel reinforcement was on site and it is to be installed in the freshly placed footing concrete. The dowel installation and spacing is to be verified when the foundation wall reinforcement is observed. The continuous footing form dimensions and reinforcement and the interior footing form dimensions and reinforcement are consistent with the foundation design by Axiom Structural Engineering, LLC, project number: JAMB-08G03-24-25, dated July 9, 2008. Please refer to the enclosed photographs, if you have any .questions, or if we may be of further service, please contact this office at your convenience. Sincerely, Engineering, LLC Steve H. Kellums, P.E. Principal Enclosures Q�00 'ho •••••••• lam. 31696 OCT 1 0 2008 OFFICE: (970) 461-1555, FAX: (970) 461-1582, EMAIL: Axiom2000@msn.com No Text No Text 41 AXIOM STRUCTURAL ENGINEERING, LLC '��41395 SOUTH GARFIELD AVENUE LOVELAND, COLORADO 80537 October 15, 2008 Project Number: JAMB-08G03-24-45 Jamestown Builders, LLC 3003 East Harmony Road, Suite 400 Fort Collins, Colorado 80528 Re: Foundation Wall Reinforcement Observation Lot 26, Fossil Lake Ranch 3235 Muskrat Creek &1_ Fort Collins, Colorado (Larimer County) Dear Mr. Everitt: On October 15, 2008 this office observed and approved the horizontal and vertical reinforcement placed in the foundation wall forms at the location referenced above. The reinforcement observed meets the specifications for size, type and installation in accordance with the foundation design drawings by Axiom Structural Engineering, LLC, project number: JAMB- 08G03-24-25, dated July 9, 2008. We also observed the #4 rebar `Ufer' ground rod that projects vertically from the top of the exterior Northeast corner of the basement foundation wall. The `Ufer' ground rod is lapped approximately 3'-0" and it is tied to the bottom row of the continuous horizontal foundation wall reinforcement. The vertical projection of the `Ufer' ground rod is located approximately 5'-8" along the East foundation wall from the Northeast foundation corner as described above. The strap -tie anchors were observed on the site and are to be located in the foundation walls as indicated on the plan referenced above. If you have any questions, or if we may be of further service, please contact this office at your convenience. Sincerely, Axiom Stmetlural Engineering, LLC 'Steve H. Kellums, P.E. Principal Enclosures s'"Pp p RED/ H. 31696 n: OCT 1 5 2008 OFFICE: (970) 461-1555, FAX: (970) 461-1582, EMAIL: Axiom2000@msn.com /15/2008 10/15/2008 . � N N 2 - �V r Y 10/15.2003 AXIOM STRUCTURAL ENGINEERING, LLC 1395 SOUTH GARFIELD AVENUE LOVELAND, COLORADO 80537 October 21, 2008 Project Number: JAMB-08G03-24-55 Jamestown Builders, LLC 3003 East Harmony Road, Suite 400 Fort Collins, Colorado 80528 Re: Foundation Sub -Drain and Damp Proofing Observation Lot 26, Fossil Lake Subdivision, Sixth Filing 3235 Muskrat Creek Drive Fort Collins, Colorado (Larimer County) Dear Mr. Everitt: On October 21, 2008 this office observed the foundation sub -drain materials installed around the exterior perimeter of the basement foundation. The sub -drain pipe is connected to a sump pit in the basement. The homeowner should check the sump pit periodically for water. If water accumulates in the pit, a licensed plumber and electrician should install a submersible pump with an automatic float switch. The pipe from the pit should discharge at an acceptable location away from all foundation walls, window wells and exterior concrete flatwork. At the time of this observation the foundation sub -drain materials appeared to be properly installed. We also observed the spray -on damp proofing applied to the exterior of the basement foundation walls. The damp proofing appears to adequately cover the basement foundation walls. Please note that spray on damp proofing is typically effective for reducing moisture infiltration in the absence of hydrostatic pressure. Spray on damp proofing does not create a waterproof barrier that is capable of resisting moisture infiltration under hydrostatic pressure. Thus it may be possible for water to infiltrate the foundation, particularly at form -tie penetrations and hairline cracks that sometimes occur from shrinkage, especially near basement window openings. It is important to provide and maintain drainage paths that allow all surface water to flow quickly away from all foundation walls, window wells and exterior concrete flatwork. Please refer to the enclosed photographs. If you have any questions, or if we may be of further service, please contact this office at your convenience. Sincerely, Axiom Struct ral Engineering, LLC p �0 REGISH. Steve H. Kellums, P.E. lG a 1 r Principal "' 3 696 : .vo' Enclosures ��F'•. �`wtyH cy.�4NAL�E��'`OCT 2 1 2008 OFFICE: (970) 461-1555, FAX: (970) 461-1582, EMAIL: Axiom2000@msn.com 32.35 C,-� Z�L