Empire Laboratories, Inc.
GEOTECHNICAL ENGINEERING & MATERIALS TESTING
December 18, 1991
Gray Construction
5151 North Cedar
Fresno, California 93710
Attention: Mr. Dennis Dakos
Re: Fort Ram Village Second Filing, Phase III
Fort Collins, Colorado
ELI Project No. 7743
Gentlemen:
CORPORATE OFFICE
P.O. Box 503 • 301 No. Howes
Fort Collins, Colorado 80522
(303) 484-0359
FAX No. (303) 484-0454
As requested, an engineer from Empire Laboratories, Inc. has reviewed
the proposed pool construction for the clubhouse at the above -referenced
project. It is our understanding the pool is to be a maximum of seven
(7) feet deep.
Based upon the imposed loads and soil conditions encountered at the site,
it is recommended the pool be constructed with 6-inch thick gunite walls
and floor and a 1211x12" bond beam around the top perimeter of the pool.
The gunite should be 8-1/2 sack, 4000 psi mix. The walls and floor of
the pool should be reinforced with a #4 40 Grade reinforcing bar at 91,
o.c. horizontal and vertical. The bond beam should be reinforced with
six #4 reinforcing bars continuous. In addition, it is recommended an
8-inch gravel bed be placed below the pool, and the pool be provided
with a hydrostatic pressure relief valve as recommended in our
geotechnical investigation for the site (see ELI Project No. 7743). A
typical cross section of the pool wall is included with this letter.
If you have any questions, please contact us.
Very truly yours,
EM IRE B RATORIES,
�JV �
G Weeks, P.E.
Stru ral Engineer
cic
� �n11111!Ip
INC.
u o
23012
SS
Branch Offices
P.O. Box 16859 P.O. Box 1135 P.O. Box 1744
Colorado Springs, CO 80935 Longmont, CO 80502 Greeley, CO 80632
(719) 597-21 16 (303) 776-3921 (303) 351-0460
Member of Consulting Engineers Council
P.O. Box 5659
Cheyenne, WY 82003
(307) 632-9224
Empire Laboratories, Inc. CORPORATE OFFICE
P.O. Box 503 • 301 No. Howes
GEOTECHNICAL ENGINEERING & MATERIALS TESTING Fort Collins, Colorado80522
(303) 484-0359
December 10, 1991 FAX No. (303) 484-0454
1
Gray Construction
5151 North Cedar
Fresno, California 93710
Attention: Mr. Dennis Dakos
Re: Fort Ram Village Second Filing, Phase III
Fort Collins, Colorado
ELI Project No. 7743
Gentlemen:
As requested, an engineer from Empire Laboratories, Inc. has reviewed
beam sizes and roof framing details at the above -referenced project. It is
our understanding that in Buildinqs A and B, three 9-1/2" laminated
veneer lumber beams and two 2"x10"s were substituted for a 4"x10" select
structural Doug fir beam and two 2"x10"s. It is our opinion the
laminated veneer lumber beams substitution is equal to or exceeds the
4"x10" select structural Doug fir beam. In addition, we understand three
1-3/4"x14" laminated veneer lumber beams were substituted for a 6"x14"
Doug fir beam. It is our opinion the laminated veneer lumber beams
equal or exceed the 6"x14" Doug fir beam. It is our understanding the
2"x6" gable overframing on all the units constructed to date were placed
on two layers of 5/8" oriented strand board over the trusses. Based
upon the imposed loads and the maximum 24' span of the gable, it is our
opinion the 5/8" O.S.B. is riot adequate to support the imposed loads.
On future construction, it is recommended a 2"x10" nailer be laid flat on
the roof to receive the ends of the 2"x6" overframing rafters. On the
existing roofs, 2"x4" blocking should be placed on edge between the
trusses beneath each end of the 2"x6" overframing rafters. The blocking
should be end nailed with two 16d nails. If you have any questions,
please contact us.
0%%J1ltlliu4rrq�
N'� /pry
Very truly yours, p�f�FG±���T°'!�i
EM IR ABORATORIES, INC.
_ ° G
� 6 �
2„012 � _-
9 :.
° o
Ga Weeks, P.E. '.,�o� °®
Struc iral Engineer
cc: Gray Construction - Mr. Jeff Murray
City of Fort Collins Building Inspection Dept.
Branch Offices
P.O. Box 16859 P.O. Box 1135 P.O. Box 1744 P.O. Box 5659
Colorado Springs, CO 80935 Longmont, CO 80502 Greeley, CO 80632 Cheyenne, wY 82003
(719) 597-21 16 (303) 7763921 (303) 351-0460 (307) 632-9224
Member of Consulting Engineers Council
empire Laboratories, Inc.
GEOTECHNICAL ENGINEERING & MATERIALS TESTING
December 9, 1991
Gray Construction
5151 N. Cedar
Fresno, CA 93710
Attention: Mr. Dennis Dakos
Re: Fort Ram Village, Second Filing, Phase III
Fort Collins, Colorado 9P164:5-rr��iM
ELI Project No. 7743 _/
Gentlemen:
CORPORATE OFFICE
P.O. Box 503 a 301 No. Howes
Fort Collins, Colorado 80522
(303) 484-0359
FAX No. (303) 484-0454
On December 7, 1991, Empire Laboratories, Inc. observed the foundation con-
struction for the structures being constructed at the above -referenced pro-
ject site.
Observations made during the foundation construction indicate that the foun-
dation wall steel placement for the western one-third of Building "M" is in
accordance with the plans and specifications for this project. Also, the
interior foundation footing sizes for Building "K" are in accordance with
the plans and specifications for this project.
Very truly yours,
EMPIRE LABORATORIES, IN �o�°j INp
- _ `cj\� e& o e
27418 °
� o
® 1
Ron L. Lindburg, P.E. % °,4
Geotechnical Engineer
lcb
cc: Freund & Company - Mr. Tom Krage
Gray Construction - Mr. Jeff Hurray
City Ft. Collins Building Inspection Department
Branch Offices
P.O. Box 16859 P.O. Box 1 135 P.O. Box 1744 P.O. Box 5659
Colorado Springs, CO 80935 Longmont, CO 80502 Greeley, CO 80632 Cheyenne, WY 82003
(719) 597-2116 (303) 7763921 (303) 351-0460 (307) 632-9224
Member of Consulting Engineers Council
Empire Laboratories, Inc.
GEOTECHNICAL ENGINEERING & MATERIALS TESTING
November 27, 1991
Gray Construction
5151 North Cedar
Fresno, CA 93710
Attention: Mr. Dennis Dakos
Re: Fort Ram Village, Second Filing, Phase III_
Fort Collins, Colorado
ELI project No. 7743
Gentlemen:
On November"27, 1991, Empire Laboratories, Inc.
struction for the structures being constructed at
ject site.
CORPORATE OFFICE
P.O. Box 503 • 301 No. Howes
Fort Collins, Colorado 80522
(303) 484-0359
FAX No. (303) 484-0454
90l ��sir
observed the foundation con -
the above -referenced pro -
Observations made during the foundation construction.indicate that the foun-
dation wall steel placement for Building "I" is in accordance with the plans
and specifications for this project. Also, the interior foundation footing
sizes for Building "Gil and the foundation footing sizes for the southern
portion of Building "L" are in accordance with the plans and specifications
for this project.
Very truly yours
EMPIRE LABORATORIES, INC. 2749
-ro
Ron L. Lindburg, P.E.
Geotechnical Enigneer
lcb
cc: Freund & Company - Mr. Tom Krage
Gray Construction - Mr. Jeff Murray
City Fort Collins Building Inspection Department
Branch Offices
P.O. Box 16859 P.O. Box 1 135 P.O. Box 1744 P.O. Box 5659
Colorado Springs, CO 80935 Longmont, CO 80502 Greeley, CO 80632 Cheyenne, WY 82003
(719) 597-21 16 (303) 776.3921 (303) 351-0460 (307) 632-9224
Member of Consulting Engineers Council
FROM EMPIRE LABS INC _ II.25.1991 1 5 : 3 1 P,
*V'6�RAtp
foo
W �
r
r.
Empire LaWratories, Inc.
GEOTECHNICAL ENGINEERING d MATERIALS TESTING
November 12, 1991
Gray Construction
5151 North Cedar
Fresno, GA 93710
Attention: Mr. Dennis Dakos
ffo
CORPORATE OFFICE
P.O. Bow 603 a 301 No. Howes
Fort Collins. Colorado 00522
(303) 484.0350
FAX No, (303) 404.0454
Re: Fort Ram Village, Second Filing Phase III, Building 'I£II
Fort Collins, Colorado
ELI Project No. 7743
Gentlemen:
On November 11, 1991, Empire Laboratories, Inc. observed the foundation con-
struction for the structure being constructed at the above -referenced pro-
ject site.
Observations made during the foundation construction. indicate that the foun-
dation wall steel placement for the southern portion of the structure is ,in
accordance with the plans and specifications for this project.
Very truly yours,
EMPIRE LABORATORIES, INC.
Ron L. Lindburg, P.E.
Geotechnical Engineer
lcb
cc: Freund & Company - Mr. Ton) Krage
Gray Construction - Mr. Jeff Murray
City of Fort Collins Building Inspection Department
Branch Office•
P.O. Box 15850 P.O. Box 1135 P.O. Box 1744
Colorado Springs, CO 80935 Longmont, CO 80602 Greeley, CO 00032
1710) 597.2110 1303) 778.3021 (303) 361-0460
— Member of Consulting Englnoers Council
ra
P.O. Box $659
Cheyenne. WY 82003
(307) e32.9224
�50RA10
4-
Empire Laborato'kies, Inc.
GEOTECHNICAL ENGINEERING & MATERIALS TESTING
November 12, 1991
Gray Construction
5151 North Cedar
Fresno, CA 93710
Attention: Mr. Dennis Dakos
CORPORATE OFFICE
P.O. Box 503 u 301 No. Howes
Fort Collins, Colorado 80522
(303) 484-0359
FAX No. (303) 484-0454
Re: Fort Ram Village, Second Filing Phase III, Building !'Ell
Fort Collins, Colorado
ELI Project No. 7743
Gentlemen:
On November 11, 1991, Empire Laboratories, Inc, observed the foundation con-
struction for the structure being constructed at the above -referenced pro-
ject site.
Observations made during the foundation construction indicate that the foun-
dation wall steel placement for the southern portion of the structure is in
accordance with the plans and specifications for this project.
Very truly yours,
EMPIRE LABORATORIES, INC.
Ron L. Lindburg, P.E.
Geotechnical Engineer
lcb
cc: Freund & Company - Mr. Tom Krage
Gray Construction - Mr. Jeff Murray
City of Fort Collins Building Inspection Department
Branch Offices
P.O. Box 16859 P.O. Box 1135 P.O. Box 1744
Colorado Springs, CO 80935 Longmont, CO 80502 Greeley, CO 80632
(719) 597-21 16 (303) 776-3921 (303) 351-0460
Member or Consulting Engineers Council
P.O. Box 5659
Cheyenne, WY 82003
(307) 632.9224
Empire Laboratories, Inc.
GEOTECHNICAL ENGINEERING & MATERIALS TESTING
November 12, 1991
Gray Construction
5151 North Cedar
Fresno, CA 93710
Attention: Mr, Dennis Dakos
CORPORATE OFFICE
P.O. Box 503 a 301 No. Howes
Fort Collins, Colorado 80522
(303) 484.0359
FAX No. (303) 484-0454
Re: Fort Ram Village, Second Filing Phase III, Building IIE"
Fort Collins, Colorado
ELI Project No. 7743
Gentlemen:
On November 11, 1991, Empire Laboratories, Inc, observed the foundation con-
struction for the structure being constructed at the above -referenced pro-
ject site.
Observations made during the foundation construction indicate that the foun-
dation wall steel placement for the southern portion of the structure is in
accordance with the plans and specifications for this project.
Very truly yours,
EMPIRE LABORATORIES, INC.
Ron L. Lindburg, P.E.
Geotechnical Engineer
lcb
UN,0'
`'7418 0
o•
cp��.a eo
e
cc: Freund & Company - Mr. Tom Krage
Gray Construction - Mr. Jeff Murray
City of Fort Collins Building Inspection Department
Branch Offices
P.O. Box 16859 P.O. Box 1135 P.O. Box 1744
Colorado Springs, CO 80935 Longmont, CO 80502 Greeley, CO 80632
(719) 597-21 16 (303) 776-3921 (303) 351-0460
Member of Consulting Engineers Council
P.O. Box 5659
Cheyenne, WY82003
(307) 632-9224
Empire Laboratories, Inc.
GEOTECHNICAL ENGINEERING & MATERIALS TESTING
November 5, 1991
Vaught Frye Architects
1113 Stoney Hill Drive
Fort Collins, Colorado 80525
Attention: Mr. Frank Vaught
Re: Fort Ram Village Phase III
ELI Project No. 7272
Gentlemen:
CORPORATE OFFICE
P.O. Box 503 • 301 No. Howes
Fort Collins, Colorado 80522
(303) 484-0359
FAX No. (303) 484.0454
Gl o / 6n.5 T -
As requested, Empire Laboratories, Inc. has reviewed the proposed party
wall construction for the above -referenced project. It is our
understanding the party walls are to be constructed with 2"x6"s at 1611
o.c. The 1-1/2" dimension of the 2"x611 is to be parallel with the axis of
the party wall. Based upon the imposed loads and height of the wall,. it
is our opinion the 211x6" construction is adequate to support the imposed
loads provided the wall is constructed in accordance with the sketch
included with this letter. If you have any questions, please contact us.
\11111! 1ll!!101111//
Very truly yours, \
MPI E A 0 ATCRIES, INC,
23012
� a �
e
Ga G Weeks, P. E.
Struc al Engineer „1"1111110
cic
Branch Offices
P.O. Box 16859 P.O. Box 1135 P.O. Box 1744 P.O. Box 5659
Colorado Springs, CO 80935 Longmont, CO 80502 Greeley, CO 80632 Cheyenne, WY 82003
(719) 597-2116 (303) 776-3921 (303) 351-0460 (307) 632-9224
Member of Consulting Engineers Council