Loading...
HomeMy WebLinkAbout4702 SNOW MESA DR - SPECIAL INSPECTIONS - 2/7/2005RL&A, Inc. Consulting Structural Engineers and Builders 4412 W Eisenhower BLVD Loveland, CO 80537 970-667-2426 Fax: 970-667-2493 February 4, 2005 RE: PVHS Primary Care, mist. coordination items Whitney Churchill The Neenan Company 2620 E Prospect Rd, Suite 100 Fort Collins, Colorado 80525 Dear Whitney, 30� osr�t 17v z svow r-4 u-5-4 This letter is to confirm in writing various field revisions/clarifications that were made to the structural drawings. These items are as follows: 1.) Trusses to be connected to supports with two Simpson H3 hurricane ties for trusses longer than 20 t and with one E13 tie only for shorter trusses. See Simpson catalog for nailing requirements. 2.) Where trusses are supported on the second floor slab, attach H3 tie to slab edge angle with two HILTI X-EDNI powder actuated fasteners or equivalent fastener type. Please contact me if you have further questions regarding these issues. Meike Borchers Cc: file Coord Items 020405.Doc