HomeMy WebLinkAbout914 S COLLEGE AVE - SPECIAL INSPECTIONS - 10/15/2004OCT-15-2004 15:10 FROM:THE CE CROIP 9702668B76 TO:226IBM P.1/1
94sC .Ple'
October 15, 2004
I
Deleboy Construction
3104 South Taft Hill Road
Ft. Collins, Colorado 80526
Attention: Mr. Mike Roberts
Project: Best Western Phase 2
Subject: Basement plumbing revision
Gentlemen:
THE iiONSUL77NG ENGINEERING GROUP has reviewed the change for the floor drain in
the basement made by the plumbing contractor. In consideration of the pool filters being changed to a
cartridge type with only nuisance water being spilled on the floor and the cartridges only requiring being
hosed off for cleaning in lieu of the sand filter type with a significant backwash cycle, we find the
change Aacceptable deviation from our original design.
Please 't hesitate to call should you have any further
espec ly
M D'R 1
Pnncgral/Managing Partner
(MoixaJemwaftïż½4KIMpros dwse
'concerns.