Loading...
HomeMy WebLinkAbout914 S COLLEGE AVE - SPECIAL INSPECTIONS - 10/15/2004OCT-15-2004 15:10 FROM:THE CE CROIP 9702668B76 TO:226IBM P.1/1 94sC .Ple' October 15, 2004 I Deleboy Construction 3104 South Taft Hill Road Ft. Collins, Colorado 80526 Attention: Mr. Mike Roberts Project: Best Western Phase 2 Subject: Basement plumbing revision Gentlemen: THE iiONSUL77NG ENGINEERING GROUP has reviewed the change for the floor drain in the basement made by the plumbing contractor. In consideration of the pool filters being changed to a cartridge type with only nuisance water being spilled on the floor and the cartridges only requiring being hosed off for cleaning in lieu of the sand filter type with a significant backwash cycle, we find the change Aacceptable deviation from our original design. Please 't hesitate to call should you have any further espec ly M D'R 1 Pnncgral/Managing Partner (MoixaJemwaftïż½4KIMpros dwse 'concerns.