PT -Slab on Grade Inspection
TO: FC Caribou L.P. DATE: March 13, 2008
7350 East Progress Place Suite 208 INSP. DATE: March 13, 2008
Greenwood Villa e, CO 80111 WEATHER: Hieh 40's
PROJECT: Caribou Apartments Phase I
ADDRESS: 4123 Verbena Way
LOCATION: Ft. Collins, Colorado 80525
LOT: N/A
ATTN: Marc Hendricks BLOCK: N/A
CC: Jim Lambert BUILDING NO.: Garage #4
❑ PERIMETER TRENCHES
❑ INTERIOR TRENCHES: 10 TENDON PLACEMENT:
❑ Width & depth ❑ Width & depth 0 Correct number of tendons
Width: Depth: Width: Depth: 0 Tendon sheathing correct
❑ Mild reinforcement proper size & grade ❑ Mild reinforcement proper size & grade 0 Clear cover at dead end
Size: Grade: Size: Grade: 0 Tendon proper clear cover
❑ Mild reinforcement clear cover ❑ Mild reinforcement clear cover ❑ Re-entrant corner bars correct
❑ Lap splices correct ❑ Lap splices correct 0 Vapor barrier present (If req'd.)
❑ UFER bar present & correct ❑ Top of form elevation verified
❑ Sub -grade approved by Geotech 0 Hairpin dowels installed (If req'd.)
CONCRETE PLACEMENT: CONTRACTOR PLAN INFORMATION:
INFORMATION:
❑ Cold Weather Requirements apply Site Superintendent 0 Plans are on site
❑ Hot Weather Requirements apply Name: Jason Condon Plan date: 09.04.07
❑ Site/Pad drainage acceptable Company: Shaw Construction Issued by (initials): NC, TM
❑ Tops of trenches free of debris Foundation Subcontractor
Name: Mike Gordon
Company: M & R Concrete
Geotechnical Special Inspector
Name: Austin M. Hodgson
Company: Terracon
Inspection date: 01.11.08
0 Reinforcement was placed in general conformance with approved drawings and standard construction practice.
Remarks or Deficiencies Noted:
The sheathing at the live and dead ends of some tendons was not per PTI standards. The dead-end of one tendon lacked proper clear cover
due to a loose form. Various tendons lacked proper clear cover from sub -grade. All corrections were made while a representative from our
office remained on -site. Mike Gordon of M&R Concrete was infbr��at the top of the trenches would need to be cleared of debris prior
to Dour.
Re -inspection Required?
❑ Yes
0 No
Matthew D. Arledge, E.I.
O�p0 RE('� J�
UO �QP�G kF,py ;a
33765
hFAL
Patrick J. Kervin, P.E.
engineer or I echnician Reviewing Engineer
3611 BLAKE STREET, DENVER, CO 80205
Pjt: (303) 783-4797 • FAx: (303) 830-9133