Loading...
HomeMy WebLinkAbout468 PEYTON DR - SPECIAL INSPECTIONS - 6/7/2004June 7, 2004 DR Horton, Melody Series 11031 Sheridan Blvd. Westminster, Colorado 80020 Attn: Mr. Corey Weaver Irerracon 301 N. Howes • P.O. Box 503 Fort Collins, Colorado 80521-0503 (970) 484-0359 Fax: (970) 484-0454 Re: Foundation Footing Size and Foundation Wall Steel Observation Ridgewood Hills 3rd Filing 468 Peyton Drive — Lot 182 Fort Collins, Colorado Terracon Project No. 20005162 Mr. Weaver: A representative of Terracon observed the interior and exterior footing sizes and wall steel reinforcement for the above referenced project on May 27 and 28, 2004, as requested. Observations made during the foundation construction indicate that the interior and exterior footing sizes and wall steel placements were constructed in general accordance with the plans for this project. Sincerely, TERRACON Reviewed By: .... --�� Benjamin D. Ruder, E.I. David A. Richer, P:E`` Staff Engineer Geotechnical Engineer/Department Manager Copies to: (2) Addressee (1) Mr. Brian Kelly — DR Horton, Melody Series Arizona ■ Arkansas ■ Colorado ■ Idaho ■ Illinois ■ Iowa ■ Kansas ■ Minnesota ■ Missouri ■ Montana Nebraska ■ Nevada ■ New Mexico ■ North Dakota ■ Oklahoma ■ Tennessee ■ Texas ■ Utah ■ Wisconsin ■ Wyoming Quality Engineering Since 1965