HomeMy WebLinkAbout3230 SHALLOW POND DR - INSPECTION RESULTS - 5/13/2004Building and Zoning Department
281 N. College Ave.
Fort Collins, CO 80524
970/221-6760
•� • �•
------- -- -.tau,u.1'�u-liri�ii�ull►til�'�L•i•1il+yli��l�)r.C•��l
HIRED BY ABBCO BUILDERS PHONE 226-4663
INSPECTOR SCOTT DANIELSON CQRMC # RD-63
ADDRESS OF INSPECTION 3230 SH_Ar.r.nw POtp DRIVE �Ip 80528
BUILDER/CONTR— ABBCO BUTT n S PHONE 226-4663
ADDRESS 3324 S ALLON WHIT DRIVR
CITY FORT COLLINS
STATE CO 7Ip -80528
BUILDERS PHONE ?A ACC
ADDRESS 3324 SHALLOW POND DRIVE
CITY FORT COLLINS STATE CO
7Ip 80528
Codes: Pass = ✓ Fail = O Not applicable =NA
INSPECTION #1
TYPE OF FOUNDATION
_crawl space
-X--basement
_slab on grade
TYPE OF SYSTEM BEING INSTALLED
_Passive sub -membrane system
Active sub -membrane system
Passive system - sub slab
_Active system - sub slab
_combined radon system
COMPONENTS - sub slab/ basement
-IL-4 inches aggregate or perforated
Pipe or collection mat
_diffusion retarder (not required
where sealing has occurred)
_tee fitting
_perforated vent pipes (min. 10 ft.)
INSPECTIONS #2 and #3
COMPONENTS
X Sealing of openings, penetrations,
joints
X _perforated floor vent pipe
:1 4- PVC radon vent pipe
_diffusion retarder membrane
_membrane sealed to wall & fixtures
X PVC pipe sealed at all penetrations
& connections
_Firewall sleeves installed
-JL_System labeled inside and outside
-A-System accessible for repair or
installation of fan
X electrical connections for fan
termination of system meets
standard
g corrosion resistant screen at end of
discharge pipe (% to'/2 openings)
_fan properly installed outside living
space
_Manometer or other US EPA
approved monitoring device installed
_Make-up air vents
SYSTEM APPROVED: X YES
_NO
DATE MUCH 18 2004
Commence
c:LRTIFIGATION: !, the undersigned inspector, certify that to the best of my knowledge and professional ability, !
have Inspected the above -described radon mitigation system and have found It to be installed in accordance with
the building standards sat forth in Section 1210 of the Building Code of the City of Fort Coitins, unless otherwise
specifically noted above. This certification does not extend to any conditions resulting from subsequent acts or
omissions of the building contractor, owner, or other persons in connection with the installation, operation, or
maintenance of such radon mitigation system.
SIGNATURE OF INSPECTOR DATE
_25��/(J
White - Building Inspection Yellow - Inspector
PIIIk -Customer Qa¢ -Natural Resources