Loading...
HomeMy WebLinkAbout3230 SHALLOW POND DR - INSPECTION RESULTS - 5/13/2004Building and Zoning Department 281 N. College Ave. Fort Collins, CO 80524 970/221-6760 •� • �• ------- -- -.tau,u.1'�u-liri�ii�ull►til�'�L•i•1il+yli��l�)r.C•��l HIRED BY ABBCO BUILDERS PHONE 226-4663 INSPECTOR SCOTT DANIELSON CQRMC # RD-63 ADDRESS OF INSPECTION 3230 SH_Ar.r.nw POtp DRIVE �Ip 80528 BUILDER/CONTR— ABBCO BUTT n S PHONE 226-4663 ADDRESS 3324 S ALLON WHIT DRIVR CITY FORT COLLINS STATE CO 7Ip -80528 BUILDERS PHONE ?A ACC ADDRESS 3324 SHALLOW POND DRIVE CITY FORT COLLINS STATE CO 7Ip 80528 Codes: Pass = ✓ Fail = O Not applicable =NA INSPECTION #1 TYPE OF FOUNDATION _crawl space -X--basement _slab on grade TYPE OF SYSTEM BEING INSTALLED _Passive sub -membrane system Active sub -membrane system Passive system - sub slab _Active system - sub slab _combined radon system COMPONENTS - sub slab/ basement -IL-4 inches aggregate or perforated Pipe or collection mat _diffusion retarder (not required where sealing has occurred) _tee fitting _perforated vent pipes (min. 10 ft.) INSPECTIONS #2 and #3 COMPONENTS X Sealing of openings, penetrations, joints X _perforated floor vent pipe :1 4- PVC radon vent pipe _diffusion retarder membrane _membrane sealed to wall & fixtures X PVC pipe sealed at all penetrations & connections _Firewall sleeves installed -JL_System labeled inside and outside -A-System accessible for repair or installation of fan X electrical connections for fan termination of system meets standard g corrosion resistant screen at end of discharge pipe (% to'/2 openings) _fan properly installed outside living space _Manometer or other US EPA approved monitoring device installed _Make-up air vents SYSTEM APPROVED: X YES _NO DATE MUCH 18 2004 Commence c:LRTIFIGATION: !, the undersigned inspector, certify that to the best of my knowledge and professional ability, ! have Inspected the above -described radon mitigation system and have found It to be installed in accordance with the building standards sat forth in Section 1210 of the Building Code of the City of Fort Coitins, unless otherwise specifically noted above. This certification does not extend to any conditions resulting from subsequent acts or omissions of the building contractor, owner, or other persons in connection with the installation, operation, or maintenance of such radon mitigation system. SIGNATURE OF INSPECTOR DATE _25��/(J White - Building Inspection Yellow - Inspector PIIIk -Customer Qa¢ -Natural Resources