Loading...
HomeMy WebLinkAbout6127 TILDEN ST - SPECIAL INSPECTIONS - 9/19/2003Excavation/Footing Inspection CLIENT: Ryland Homes 8100 F Maplewood Ave , Ste 100 G—rinnn•A•nnrl Village, CO 80111 Recommended Foundation System CTL/THOMPSON JOB NO. 2 1 5- DATED 3 / 5- ❑ SPREAD FOOTINGS MAXIMUM SOIL PRESSURE OF PSF. MINIMUM WIDTH INCHES FOOTINGS WITH MINIMUM DEAD -LOAD MAXIMUM SOIL PRESSURE OF Z , O oy PSF. MINIMUM DEAD -LOAD PRESSURE OF O 0 PSF. PROVIDE A INCH VOID BENEATH GRADE BEAMS. MINIMUM WIDTH % & INCHES ❑ GRADE BEAMS AND PADS DESIGNED FOR: MAXIMUM SOIL PRESSURE OF PSF. MINIMUM DEAD -LOAD PRESSURE OF PSF. PROVIDE A INCH VOID BENEATH GRADE BEAMS. FouptIntition� /Plan i BY ✓ -si�/ PLAN NO. 7j 50 WALL FOOTING WIDTH INCHES COLUMN PAD Ste. $ �`�L� INCHES REINFORCEMENT AS PER PLAN: YES ❑ NO ❑ NONE REQUIRED AT SITE ❑ INSTALLED Soil Conditions/ At Footing Level TORVANE OR VANE SHEAR PSF. DENVER PENETROMETER TEST Ground Water Conditions NONE IN EXCAVATION ,{ NONE ENCOUNTERED IN BORING NO. 4: S TO J FEET ❑ ENCOUNTERED AT FEET IN BORING NO. Remarks: CTL/THOMPSON, INC. CONSULTING GEOTECHNICAL 19 AND MATERIALS ENGINEERS ADDRESS: rr 4 1 2-7 i ,-If sk. LOT 2 ? BLOCK FILING NO. JOB NO. FG - 22 T Foundation Layout t / 1! �am==011-1175A M.N. ■ i■�7C!!'1■' � Hill ■`i '��I lam �ii�iiiiii��i�'"��i will ,`1 Vill Instructions To Contractor APPROVED gi REJECTED CORRECTIVE PROCEDURE k J 11 V. 4", j F1-o ��.'P� S Fl;\ FIELD REPRESENTATIVE REVIEWED BY DATE OF INSPECTION is •. • •. • G� S/�NAAL_�