Loading...
HomeMy WebLinkAbout602 KEENESBURG CT - SPECIAL INSPECTIONS - 11/3/2003 (2)November 3, 2003 Melody Homes 11031 Sheridan Blvd. Westminster, Colorado 80020 Attn: Mr. Corey Weaver Re: Exterior Perimeter Drain Observation Ridgewood Hills 3rd Filing 602 Keenesburg Court - Lot 143 Fort Collins, Colorado Terracon Project No. 20005162 Gentlemen: Irerracon 301 North Howes • P.O. Box 503 Fort Collins, Colorado 80521-0503 (970) 484-0359 Fax: (970) 484-0454 A representative of Terracon observed the perimeter drain at the above referenced address on October 27, 2003, as requested. A four -inch diameter perforated PVC pipe had been placed around the exterior perimeter of the basement and crawl -space foundations with an impervious PVC membrane beneath the drainage system. The drainage pipe appeared to exhibit positive drainage toward the sump pit located within the basement area. We also observed 1 Y2 inch washed gravel placed above and below the pipe and drainage filter fabric above the gravel. The waterproof dampening was also observed and in our opinion was uniformly applied to the exterior foundations. In our opinion the exterior perimeter drain was constructed in general accordance with the plans and specifications for this project. Sincerely, TERRACON Glenn Ripka Senior Field Technician Copies to: (3) Addressee t, - , 112 David A. RicheJo <, y Geotechnical E i#'iae'r1Deo�rt, lP nt Manager Arizona ■ Arkansas ■ California ■ Colorado ■ Georgia ■ Idaho ■ Illinois ■ Iowa ■ Kansas ■ Kentucky ■ Minnesota ■ Missouri Montana ■ Nebraska ■ Nevada ■ New Mexico ■ North Carolina ■ Oklahoma ■Tennessee ■ Texas ■ Utah ■ Wisconsin ■ Wyoming Consulting Engineers & Scientists Since 1965 www.terracon.com