HomeMy WebLinkAbout6156 DOLAN CT - SPECIAL INSPECTIONS - 8/26/2002Foundation Wall
Reinforcement Inspection
CLIENT: Ryland Homes
8000 E. Maplewood Avenue, Ste 120
Greenwood Village, CO 80111
Foundation PI
BY �Z
PLAN NO.
Foundation Type
❑ SPREAD FOOTINGS ON NATURAL SOIL
L FOOTINGS W/ MINIMUM DEADLOAD
❑ GRADE BEAMS AND PADS
❑ DRILLED FRICTION PIERS
❑ DRILLED PIERS INTO BEDROCK
❑ OTHER
Foundation Void
9 REQUIRED THICKNESS INCHES
❑ NOT REQUIRED
Reinforcing Steel
GRADEBAR SIZE 9
NO. OF BARS
TOP
BOTTOM 2
VERTICAL She 1. V M
I1tructions To Contractor
FOUNDATION REINFORCEMENT IN GENERAL CONFORMANCE WITH
PLAN
❑ REJECTED
RECOMMENDED CORRECTIVE PROCEDURE
TD
CTL/THOMPSON, INC.
CONSULTING GEOTECHNICAL
AND MATERIALS ENGINEERS
ADDRESS:
2
LOT BLOCK
FILING NO. JOB NO. •F
Foundation Wall Layout
UFER Ground * Location of LIFER Ground
❑ LOCATION
❑ NOT INSTALLED
Comment: y� d-� L) Vi- U- �I� Q�1(,( j