Loading...
HomeMy WebLinkAbout6156 DOLAN CT - SPECIAL INSPECTIONS - 8/26/2002Foundation Wall Reinforcement Inspection CLIENT: Ryland Homes 8000 E. Maplewood Avenue, Ste 120 Greenwood Village, CO 80111 Foundation PI BY �Z PLAN NO. Foundation Type ❑ SPREAD FOOTINGS ON NATURAL SOIL L FOOTINGS W/ MINIMUM DEADLOAD ❑ GRADE BEAMS AND PADS ❑ DRILLED FRICTION PIERS ❑ DRILLED PIERS INTO BEDROCK ❑ OTHER Foundation Void 9 REQUIRED THICKNESS INCHES ❑ NOT REQUIRED Reinforcing Steel GRADEBAR SIZE 9 NO. OF BARS TOP BOTTOM 2 VERTICAL She 1. V M I1tructions To Contractor FOUNDATION REINFORCEMENT IN GENERAL CONFORMANCE WITH PLAN ❑ REJECTED RECOMMENDED CORRECTIVE PROCEDURE TD CTL/THOMPSON, INC. CONSULTING GEOTECHNICAL AND MATERIALS ENGINEERS ADDRESS: 2 LOT BLOCK FILING NO. JOB NO. •F Foundation Wall Layout UFER Ground * Location of LIFER Ground ❑ LOCATION ❑ NOT INSTALLED Comment: y� d-� L) Vi- U- �I� Q�1(,( j