Loading...
HomeMy WebLinkAbout6126 WESTCHASE RD - SPECIAL INSPECTIONS - 5/8/2003Excavation/Pier Inspection CLIENT: Ryland Homes 8100 F Maplewood Ave. Ste 100 Groan •onc !`WT1 e Recommended Foundation System CTL/THOMPSON JOB NO. FC Z 1 S DATED y— -0-L- ❑ DRILLED FRICTION PIERS MAXIMUM END PRESSURE FOR PIERS = PSF. SKIN FRICTION OF PSF. MINIMUM DEAD -LOAD PRESSURE OF PSF. PROVIDE A INCH VOID BENEATH GRADE BEAMS. INIMUM LENGTH FLLI DRILLED PIERS INTO BEDROCK MAXIMUM END PRESSURE FOR PIERS= Z S 00 0 PSF. SKIN FRICTION OF 2 S G PSF. MINIMUM DEAD -LOAD PRESSURE OF fd j 0 0 PSF. PROVIDE A /v INCH VOID BENEATH GRADE BEAMS. BEDROCK PENETRATIONZ 6— ateawl Z%- Q'4r1 FEET MINIMUMLENGTH Z ZZ, Nc-&Sm�-IS_'BS-_FEET (plate -bp 7,3�/V5 14-f5) Foundation Plan BY Co 6b S*C0'a PLAN NO -7I G F� �S f W i Swt 3 PIER DIAMETER ID _ INCHES WALL PIER PENETRATION FEET COLUMN PIER PENETRATION 7,3 IVAJ-E i>% k RSI& FEET Reinforcement Z_ NO. GRADE 6 BARS Conditions Observe II SOILS IN EXCAVATION: C Gf S f L A N S 4 Jy SOILS IN PIERS: h 0- Ground Water Condi ons NONE IN EXCAVATION ❑ NONE ENCOUNTERED IN BORING NO, TO FEET PINCOUNTERED AT FEET IN BORING NO. Z I Remarks: 0 j n 111Vf S - CTL/THOMPSON, INC. CONSULTING GEOTECHNICAL AND MATERIALS ENGINEERS ADDRESS: 6/Z.( PS�C� �oa wts c tik Erat VIS LOT LEI ,BLOCK FILING NO. JOB NO. Foundation Layout Ilia L F ■ ■ ■ ���■■'Ni■ i►+1 2n .. _w= �.gI■ ==j si i ♦ INDICATES PIER INSPECTED DRILLING COMPANY QCAAA-CV Dri 11 " LOWER LEVEL j' PIER NO. UPPER LEVEL Q ` rI IN OVERBURDEN _ b y FT.— .�_FT. IN BEDROCK _g '�, FT. LSD FT. DEPTH TO GROUNDWATER '�- FT. FT. CASED DEPTH FT. FT. Instructions To Contractor IERS OBSERVED WERE SUPPORTED BY MATERIALS RECOMMENDED DESIGN CRITERIA I ❑ PIER INSTALLATION NOT A.