Loading...
HomeMy WebLinkAbout828 PETERSON ST - SPECIAL INSPECTIONS - 8/26/2003Date: Client: Project No: Subject: Mr. Stalnaker, August 26t'', 2003 Grant Stalnaker 828 Peterson Street Fort Collins, CO 80524 SF03-218 Proposed basement window modifications SECURE FOUNDATIONS &STRUCTURES, INC. 211 West Magnolia, Suite B Fort Collins, CO 80521 phone: 970-472-6255 fax: 970-472-6256 sfsengineering@frii.com Per your request, we made a site visit to the home at the above referenced address. The purpose of our visit was to observe the existing basement windows that are proposed to be enlarged to meet egress requirements andto provide consultation on these proposed new openings. These observations were made on August 22"d, 2003. The home consists of a conventionally framed raised ranch style structure over a cast -in -place concrete basement foundation. The windows in question are located on the south basement wall. Presently the south basement wall has five existing windows (see attached photo). It is our understanding it is desired to increase several of the existing windows in size so that they meet the minimum opening required for egress. We understand the new windows will have a minimum depth of 2'-4" (slightly deeper than the existing) and be 5'-0" wide (about twice as wide as the existing) Furthermore, we understand the grades along the south side will be approximately one foot lower than the historical grade. Based upon our observations, and our experience with projects of this type, it is our opinion the new openings could be cut into the existing south basement foundation wall. We recommend the following: 1.) Per code it appears that each egress opening shall have a minimum net clear opening space of 5.7 square feet, a minimum opening height not less than 24" (inches), and a minimum opening width not less than 20" (inches). Furthermore, the maximum sill height should not be more than 44" (inches) above the floor. Your proposed sizes should work with the exception of the floor to sill height. We recommend you discuss the sizes of the windows and floor to sill dimension with the building official to make sure your proposed changes are acceptable. 2.) Of the five existing windows along the south basement wall the two windows immediately east of the fireplace are, in our opinion, the best candidates. Each of these could be expanded Foundation and Structural Engineering • Inspections - Diagnostics and Repair - Bridge Design - Retaining Wall Design SASF Engineering\2003 SF Projects\SF 218 - 828 Peterson Street\Letters\SF03-218 egress.wpd 1 downward to accommodate a 2'4" window depth and towards the east (in width) no more than necessary to meet egress opening requirements (or 5 foot maximum). 3.) The window near the west corner would need it's depth increased significantly since the available length between the comer and the fireplace is limited. Decreasing the foundation wall depth near the corner could adversely weaken the corner. Therefore, we recommend this window remain unaltered. 4.) Ofthe two remaining windows, the existing double window (fourth one east ofthe fireplace) is the next best candidate. Given the width of the existing opening at this location, it's probably only necessary to increase the depth of this window to meet the minimum egress opening size. 5.) Each new opening shall have a pressure treated (PT) 5 ply 2x8 Hem -Fir #2 or better header and a PT 2x8 Hem -Fir jam each side and PT 2x8 Hem -Fir sill (See the attached sketch). 6.) No new openings shall be placed below new LVL/ML header bearing locations above. This report is based upon our site observations and our experience with projects of this type. Our observations were limited by the presence of backfill, wall and floor coverings, and other obstructions. Unseen defects may exist which could affect the performance of the structure. No warranties or guarantees regarding the future performance of the structure are expressed or implied. Thank you for selecting SECURE for your engineering needs. When we can be of additional service, please contact the undersigned. Respectfully submitted, SECURE FOUNDATIONS AND STRUCTURES, INC. 6g7 James A. Cherry, P.E. Project Engineer 3 copies sent SASF Engineering\2003 SF Projects\SF 218 - 828 Peterson Street\Letters\SF03-218 egress.wpd 2 Z1f17R1#A1Ce CIOCUI-� C�FC-T. j�EZI�-'Z-b 61651--,7-- 607-Z