HomeMy WebLinkAbout6802 ANTIGUA DR - SPECIAL INSPECTIONS - 8/24/1998PLAZA
ENGINEERING
CONSULTANTS
Report Date. August 29, 1998
ENGINEER'S FIELD REPORT
Project: James Company Stanton Creek P.U_D., Filing 1 (Units 25-30)
Location: 6802 Antigua Drive, Fort Collins, Colorado. n t
Architect: .Knudson Gloss Architects and Planners, Boulder, Colorado
Contractor. James Company, Boulder, Colorado (Scott Holmes)
Subject: Concrete Foundation Walls
Date: August 24, 1998 (1:00 pm)
OBSERVATIONS
Report No.: 9
Weather: Warm
In general, the size, type and placement of the reinforcing steel is consistent with the structural
requirements outlined in the contract drawings. The horizontal reinforcement consists of No. 5,
Grade 40 steel, while the vertical dowels were No. 4, Grade 60 reinforcing bar. All reinforcement
was tied together properly, with taps at splices and corner bars being 24 inches in length
FIELD INSTRUCTIONS GIVEN
None,
PLAZA ENGINEERING CONSULTANTS, INC.
P.O. Box 1002 Loveland, CO 80539-1002 (970)-663-6353 (970) 663-0368 Fax
TOTAL P.01