Loading...
HomeMy WebLinkAbout6802 ANTIGUA DR - SPECIAL INSPECTIONS - 8/24/1998PLAZA ENGINEERING CONSULTANTS Report Date. August 29, 1998 ENGINEER'S FIELD REPORT Project: James Company Stanton Creek P.U_D., Filing 1 (Units 25-30) Location: 6802 Antigua Drive, Fort Collins, Colorado. n t Architect: .Knudson Gloss Architects and Planners, Boulder, Colorado Contractor. James Company, Boulder, Colorado (Scott Holmes) Subject: Concrete Foundation Walls Date: August 24, 1998 (1:00 pm) OBSERVATIONS Report No.: 9 Weather: Warm In general, the size, type and placement of the reinforcing steel is consistent with the structural requirements outlined in the contract drawings. The horizontal reinforcement consists of No. 5, Grade 40 steel, while the vertical dowels were No. 4, Grade 60 reinforcing bar. All reinforcement was tied together properly, with taps at splices and corner bars being 24 inches in length FIELD INSTRUCTIONS GIVEN None, PLAZA ENGINEERING CONSULTANTS, INC. P.O. Box 1002 Loveland, CO 80539-1002 (970)-663-6353 (970) 663-0368 Fax TOTAL P.01