Loading...
HomeMy WebLinkAbout915 THORNHILL PL - MISCELLANEOUS - 8/12/2002fort collins building & zoning dept. B02051 28 I N. A pr Mom.F 4 a�Fw� HOME BUILDER AGREEMENT FOR $75 PERMIT FEE REDUCTION I, 0WW �,�, " 0 �p 5.....+w.cc tco>PwMYN G c_ •'' f�. 4G ,as the builder/contractor of record of the home identified below, hereby agree to utilize the following systems energy analysis program: (check one) OENMGY SCORE; *-StarTM to demonstrate compliance with the Fort Collins Energy Code as a condition for receiving a building permit fee reduction of $75 upon issuance of the building permit for the home to be constructed at: 41�7 Lelo cY11S Fort C6ks C 6 I understand that all other applicable provisions of the Fort Collins Energy Code, including following the Fort Collins Insulation Guidelines, submitting an insulation certification form and HVAC certification form, and obtaining a completed "Insulation Inspection" performed by City staff will be required prior to issuance of a Certificate of Occupancy for the above home. Further, I hereby acknowledge that a `preliminary rating" must be submitted to the Fort Collins Building and Zoning Department in order to obtain an "Insulation Inspection", and that failure to use either of the energy rating programs named above and meet their respective established tninimurn criteria for ,compliance will result in forfeiture of the $75 building permit fee reduction provided hereunder and compliance with the Fort Collins Energy Code must be demonstrated before a S%ificate of Occupancy is authorized by the City. (SICNA7'tJRE) �