HomeMy WebLinkAbout1439 CATALPA CT - INSPECTION RESULTS - 4/22/2002Building and Zoning Department
281 N. College Ave.
Fort Collins, CO 80524
970/221-6760
RX C F 1VZD
JUN 2 12002
INSPECTION OF RADON MITIGATION SYSTEM IN NEW CONSTRUCTION
HIRED BY 4-Of1-PHONE y� P`*71d
INSPECTOR CQRMC # r7KId /0 %
ADDRESS OF INSPECTION y Q R a 1P 005-2- f
BUILDER/CONY �� a- PHONE
ADDRESS t/ 4oc kel-
CITY a 1 _ STATE ,- 71P
E
ADDRESS IV- rzg�ei �l
CITYSTATE 0 71P
Codes: Pass = ✓ Fail = O Not annlirnhlP =NA
INSPECTION #1
INSPECTIONS #2 and #3
SYSTEM APPROVED: YES
COMPONENTS
NO
TYPE OF FOUNDATION
Sealing of openings, penetrations,
/crawl space
XV basement
joints
_ _perforated floor vent pipe
DATE
slab on grade
_ _4" PVC radon vent pipe
Comments
diffusion retarder membrane
TYPE OF SYSTEM BEING INSTALLED
Passive sub -membrane system
tive sub -membrane system
Passive system - sub slab
Active system - sub slab
combined radon system
membrane sealed to wall & fixtures
PVC pipe sealed at all penetrations
& connections
Firewall sleeves installed
System labeled inside and outside
System accessible for repair or
installation of fan
electrical connections for fan
COMPONENTS - sub slab/ basement
termination of system meets
4 inches aggregate or perforated
pipe or collection mat
standard
corrosion resistant screen at end of
discharge pipe ('% to'/z openings)
diffusion retarder (not required
vyFiere sealing has occurred)
KVtee ng
fan properly installed outside living
space
Manometer or other US EPA
erforated vent pipes (min. 10 ft.)
approved monitoring device installed
Lor
Make-up air vents
CERTIFICATION: 1, the undersigned Inspector, certify that to the best of my knowledge and professional ability, I
have inspected the above -described radon mitigation system and have found it to be installed in accordance with
the building standards set forth in Section 1210 of the Building Code of the City of Fort Collins, unless otherwise
specifically noted above. This certification does not extend to any conditions resulting from subsequent acts or
omissions of the building contractor, owner, or other Eersons in connection with the installation, operation, or
maintenance of such radon mitigation system./'
SIGNATURE OF INSPECTOR, �O_ f1/I VW "4K DATE 'el-1;2a —015P—
White - Building Inspection Yellow - Inspector Pink - Customer Gold - Natural Resources