Loading...
HomeMy WebLinkAbout1439 CATALPA CT - INSPECTION RESULTS - 4/22/2002Building and Zoning Department 281 N. College Ave. Fort Collins, CO 80524 970/221-6760 RX C F 1VZD JUN 2 12002 INSPECTION OF RADON MITIGATION SYSTEM IN NEW CONSTRUCTION HIRED BY 4-Of1-PHONE y� P`*71d INSPECTOR CQRMC # r7KId /0 % ADDRESS OF INSPECTION y Q R a 1P 005-2- f BUILDER/CONY �� a- PHONE ADDRESS t/ 4oc kel- CITY a 1 _ STATE ,- 71P E ADDRESS IV- rzg�ei �l CITYSTATE 0 71P Codes: Pass = ✓ Fail = O Not annlirnhlP =NA INSPECTION #1 INSPECTIONS #2 and #3 SYSTEM APPROVED: YES COMPONENTS NO TYPE OF FOUNDATION Sealing of openings, penetrations, /crawl space XV basement joints _ _perforated floor vent pipe DATE slab on grade _ _4" PVC radon vent pipe Comments diffusion retarder membrane TYPE OF SYSTEM BEING INSTALLED Passive sub -membrane system tive sub -membrane system Passive system - sub slab Active system - sub slab combined radon system membrane sealed to wall & fixtures PVC pipe sealed at all penetrations & connections Firewall sleeves installed System labeled inside and outside System accessible for repair or installation of fan electrical connections for fan COMPONENTS - sub slab/ basement termination of system meets 4 inches aggregate or perforated pipe or collection mat standard corrosion resistant screen at end of discharge pipe ('% to'/z openings) diffusion retarder (not required vyFiere sealing has occurred) KVtee ng fan properly installed outside living space Manometer or other US EPA erforated vent pipes (min. 10 ft.) approved monitoring device installed Lor Make-up air vents CERTIFICATION: 1, the undersigned Inspector, certify that to the best of my knowledge and professional ability, I have inspected the above -described radon mitigation system and have found it to be installed in accordance with the building standards set forth in Section 1210 of the Building Code of the City of Fort Collins, unless otherwise specifically noted above. This certification does not extend to any conditions resulting from subsequent acts or omissions of the building contractor, owner, or other Eersons in connection with the installation, operation, or maintenance of such radon mitigation system./' SIGNATURE OF INSPECTOR, �O_ f1/I VW "4K DATE 'el-1;2a —015P— White - Building Inspection Yellow - Inspector Pink - Customer Gold - Natural Resources