Loading...
HomeMy WebLinkAbout609 JANSEN DR - SPECIAL INSPECTIONS - 10/3/2001October 3, 2001 Melody Homes 11031 Sheridan Blvd. Westminster, Colorado 80020 Attn: Mr. Shawn Weiman Irerracon 301 N. Howes • P.O. Box 503 Fort Collins, Colorado 80521-0503 (970) 484-0359 Fax: (970) 484-0454 Re: Foundation Footing Size and Foundation Wall Steel Observation Ridgewood ,if 3`d Filing 609 Jansi n if 60 Fort Collins, Colorado Terracon Project No. 20005162 Mr. Weiman: A representative of Terracon observed the foundation footing size and wall steel construction for the referenced project on September 21, and September 26, 2001, as requested. Observations made during the foundation construction indicate that the foundation footing sizes and wall steel placements are in general accordance with the plans and specifications for this project. Sinc ely TO Richard Hoskinson ICBO Inspector Copies to: Addressee (6) G� avid A. Richer. . Geotechnical Engineer/[ 0o r 27712 -o ; Arizona ■ Arkansas ■ Colorado ■ Georgia ■ Idaho ■ Illinois ■ Iowa ■ Kansas ■ Kentucky ■ Minnesota ■ Missouri Montana ■ Nebraska ■ Nevada ■ New Mexico ■ Oklahoma ■ Tennessee ■ Texas ■ Utah ■ Wisconsin ■ Wyoming Quality Engineering Since 1965