Loading...
HomeMy WebLinkAbout903 BUCKINGHAM ST - SPECIAL INSPECTIONS - 9/14/1998FOUNDATION 11 consuitmg ENGINEERING E°g1tl10m ne' September 14, 1998 Commission No.: 1825-24-01-06 King Contracting 300 Madison Avenue Loveland, Colorado 80537 RE: Van Works (903 Buckingham), Fort Collins, Colorado Gentlemen: We have reviewed the metal building plans for the above -referenced project. On September 14, 1998, we visually observed the steel framing. It is our opinion that the framing is in substantial compliance with the design drawings. If you have any questions, please feel free to call. Respectfully, j Rona d A. Hillegaart, Structural Eneineer..,,,www',,. 'ewed James A. ( FOUNDA CONSULTING ENGINEERS, LTD. 5110 Granite Street, Suite D -Loveland, Colorado 80538 •(970) 663-0138 -Fax (970) 663-1660 500 Kimbark Street, Suite 101 -Longmont, Colorado 80501 •(303) 702-0661 *Fax (303) 774-8413 FOUNDATION 11 consulting ENGINEERING Engineers, Inc. September 14, 1998 Commission No.: 1825-24-01-06 King Contracting 300 Madison Avenue Loveland, Colorado 80537 RE: Van Works (903 Buckingham), Fort Collins, Colorado Gentlemen: We have reviewed the metal building plans for the above -referenced project. On September 14, 1998, we visually observed the steel framing. It is our opinion that the framing is in substantial compliance with the design drawings. If you have any questions, please feel free to call. Respectfully, Rona d A. VHillegaart, Structural EnQineei,L'l-" ;"",."'r/1i/,,,_ ewed by: 320�i James A.'Cherr�y FOUNDA'ITQN ,_. ,r$$II Lt`1, CONSULTING ENGINEERS, LTD. 5110 Granite Street, Suite D -Loveland, Colorado 80538 •(970) 663-0138 -Fax (970) 663-1660 500 Kimbark Street, Suite 101 •Longmont, Colorado 80501 •(303) 702-0661 *Fax (303) 774-8413 FOUNDATION II consulting ENGINEERING II Enginem, n' September 14, 1998 Commission No.: 1825-24-01-06 King Contracting 300 Madison Avenue Loveland, Colorado 80537 RE: VanV'orks (903 Buckingham), Fort Collins, Colorado Gentlemen: We have reviewed the metal building plans for the above -referenced project. On September 14, 1998, we visually observed the steel framing. It is our opinion that the framing is in substantial compliance with the design drawings. If you have any questions, please feel free to call. qlRona espectfully, Structural Engineer ewed by: A James A. `Che FOUNDATIf Im":1 TING ENGINEERS, LTD. 5110 Granite Street, Suite D -Loveland, Colorado 80538 •(970) 663-0138 -Fax (970) 663-1660 500 Kimbark Street, Suite 101 -Longmont, Colorado 80501 •(303) 702-0661 *Fax (303) 774-8413