Loading...
HomeMy WebLinkAbout4900 BOARDWALK DR - SPECIAL INSPECTIONS - 6/7/1995c9B6COLORADO CONSULTING ENGINEERS. LTD. 1 WEST BETH PLACE, ARVADA, COLORADO 60005 (303) 421-3B41 June 7, 1995 Mr. Jim Reich Junge/Reich/Associates 4141'Arapahoe Boulder, CO 80303 Oak Hill Apartments when constructed in accordance with the plans and specifications will meet the standards of the 1986 Model Energy Code. See calculations enclosed. Walls R Outside Surface .17 Siding .81 Sheating 1.32 Insulation 19.00 y2" Gypboard .45 Inside Surface .68 R = 22.43 U=.04 Allowable U =.12 Roof/Ceiling R Outside Surface .17 Roofing .21 Sheating .5 Insulation 38.0 %" Gypboard .45 Inside Surface .68 R = 40.01 U = .025 Allowable U = .03 Glass U = .50 Doors U = .47 If you have any questions, please call this office. Jack T.Collins, P.E. /, Nicol + Hofland Associates Inc. CONSULTING STRUCTURAL ENGINEERS June 6, 1995 Junge/Reich/Associates 4141 Arapahoe Avenue Boulder, Colorado 80303 Re: Oak Hill Apartments Ft. Collins, Colorado Job No. 94060 Attention: Mr. Jim Reich In response to the City of Ft. Collins' reference to U.B.C. Section 2515 concerning the support of the precast concrete balconies on wood beams, it is our belief that the structural design follows the intent of the code insofar as the precast concrete slab members are no more than 4 inches thick, are well reinforced, and are contained within relatively small areas, the largest being 8 ft. x 12 ft., with pre- cast concrete spans no greater than 6 ft. and glue lam beam spans no greater than 11 ft. The glue -lam members supporting the balconies and stair landings are designed to support the full dead load of the balconies and stairs plus a uniform live load of 60 lbs, per sq. ft. for the balconies and 100 lbs. per sq. ft, for the stairs. Special consideration was given to the affects of long-term deflection, shrinkage, and creep of the glue -lam members. The glue -lam members are designed for a total dead load deflection of 1/500. Because the precast concrete slabs contain almost twice the rein- forcing required for normal temperature and shrinkage reinforcing, we believe the precast concrete will provide a much more reliable long term satisfactory performance than an equivalent 4" thick concrete topping. Sincerely, NICOL + HOFLAND ASSOCIATES, INC. onsulting Struct ral Engineers Joseph C. Nicol, P.E. JCN/grn 4730 Walnut Street, Suite 210 (303) 443,1677 Boulder, Colorado B0301 FAX (303) 449�2422