HomeMy WebLinkAbout4700 BOARDWALK DR - CORRESPONDENCE - 5/16/1990o°°000 FINANCIAL
ASSOCIATES
Commercial Mortgage Brokerage
(602) 955.1626
RECE'VEa MY 2 2 1990
May 16, 1990
Felix Lee
City of Fort Collins
Building Inspection Department
P.O. Box 580
Fort Collins, CO 85022 -
RE: PACE�Membership Warehouse
00 Broadwalk Drive
Fort Co ins, t-orar�o
Dear Felix:
In speaking with Peter Barnes in regards to the referenced
property, he indicated I would need to contact you to receive
verification that the property is in compliance with the building
codes and ordinances of the City of Fort Collins.
Vie represent a prospective lender for the property and one of the
requirements is to verify compliance with building codes and
ordinances. We have received a Certificate of Occupancy from the
borrower, however, we would like a statement from the City that
the C of O indicates the improvements are in conformance with
city building codes and ordinances. Peter indicated that infor-
mation is stated on the C of O, nevertheless, the lender would
like a letter from the City as well.
Please provide a verification of compliance with building codes
andordinanceson the_referenced-property--to- the- following:
Woodmen of the World Life Insurance Society
c/o Financial Associates
9832 North Hayden Road, Suite 106
Scottsdale, AZ 85258
Attn: Laura Mirabito
If you have any questions or comments, please do not hesitate to
call.
Sincerely,
Laura Mirabito
for the firm
9832 North Hayden Road, Suite 106 • McCormick Ranch • Scottsdale, Arizona 85258
20 September 1989
City Building Department
300 LaPort Avenue
Ft. Collins, Colorado 80522
Attention: Debra Kasner
Re: Pace Warehouse
Job No. 1907.0
RECEIVE[) OCT a C 1
98y
AD&C Group, Inc. was retained by Vaught Frye Architects as structural
consultants for the design and construction of the new Pace Warehouse
Store, currently being constructed at the site by Wincek Constructlon
Company. Structural drawings were submitted to the department for per-
mit, bearing the seal and signature of Ronald N. Frlckel. During the
course of construction, AD&C Group, Inc. personnel made periodic site
observations, to observe the construction progress and quality of the
work and to determine whether the items observed were In general
conformance with the design Intent of the construction documents. Our
findings were reported in the.form of inspection memos addressed to the
Architect for distribution and are on file for your information, if
needed. Approximately 70% of the site cast tilt -up wall panels were
observed prior to pouring for reinforcing placement, forming construc-
tion, and weld plate installation. We also observed the wall panel
connections to the foundation and to adjacent panels after erection.
items observed at the time of our observation which required additional
or corrective work were noted.
onald n. trickel • structural engineer • 11290 w. alameda • lakewood colo. 80226 •303 •986154f ,
20 September 1989
Pace Warehouse
Page 2
Based on the conditions observed, we believe the wall panel construc—
tion to be In general conformance to the design intent of the
construction documents.
Please call if you have any questions.
ly yours,
GROUP, INC.
aid N. Frltlkel, P.E.
sident
RNF/co
cc: Wincek Construction
1720 Kirkwood, Bldg. 0, Apt. #8
Ft. Collins, Colorado 80525
20 September 1989
City Building Department
300 LaPort Avenue
Ft. Collins, Colorado 80522
Attention: Debra Kasner
Re: Pace Warehouse
Job No. 1907.0
AD&C Group, Inc. was retained by Vaught Frye Architects as structural
consultants for the design and construction of the new Pace Warehouse
Store, currently being constructed at the site by Wincek Construction
Company. Structural drawings were submitted to the department for per-
mit, bearing the seal and signature of Ronald N. Frlckel. During the
course of construction, AD&C Group, Inc. personnel made periodic site
observations, to observe the construction progress and quality of the
work and to determine whether the items observed were In general
conformance with the design intent of the construction documents. Our
findings were reported in the form of Inspection memos addressed to the
Architect for distribution and are on file for your Information, if
needed. Structural steel, anchor bolts, connections to site cast wall
panels, Joists, Joist girders, metal deck, miscellaneous bridging and
bracing, and welding were periodically observed. Items observed at the
time of our observation which required additional or corrective work
were noted.
•onald n. frickel • structural engineer •11290 w. alameda • lakewood colo. 80226 •303 •986154C
20 September 1989
Pace Warehouse
Page 2
Based on the conditions observed, we believe the structural steel and
metal decking construction to be In general conformance to the design
Intent of the construction documents.
Please call If you have any questions.
Very truly yours,
INC.
Id N. Frlckel, P.E.
ident
RNF/co
cc: Wincek Construction
1720 Kirkwood, Bldg. 0, Apt. #8
Ft. Collins, Colorado 80525