HomeMy WebLinkAbout909 CENTRE AVE - CO/LOC - 5/26/2006City of Fort Collins
Temporary Certificate of Occupancy
City of Fort Collins Permit #: B0403110
This is to certify that the building, structure, or land located at 909 CENTRE AVE
Fort Collins, CO has been inspected and temporary occupancy is hereby authorized, effective on 05/26/2006
and conditional upon the following requirements being completed and approved upon final inspection.
BUILDING INSPECTION Requirements to be Completed By: X '_:3z'�6
05/26/2006 ok TCO till August 31, 2006. mwg
If such work is not completed within the time set forth above and approved on final inspection, or unless the time for
completion is extended by the Building and Zoning Office, an order to vacate the premises, or a violation notice for
occupying the building, structure, or land without a Certificate of Occupancy will be issued. Such violation is subject to a
maximum fine of $1000.00 per day for every day of violation.
_ . ,-_/_2_& a�
Contract ner/Lessee Date
Aut o ' y Date of Issuance
NOTE: The issuance of this temporary certificate of occupancy will entitle the owner to place City Utility service in
the owner's name. Construction power rates may be substantially higher than the rate to which the owner is
entitled. Until the owner contacts the City Utility Office and makes the necessary arrangements to transfer
City Utilities to the owner's name, utilities will continue to be furnished at construction rates and both the
owner of the property and the contractor will continue to be liable to the City for all utility bills.
05/26/2006 1:53:50 PM
City of Fort Collins
Temporary Certificate of Occupancy
City of Fort Collins Permit #: B0403110
This is to certify that the building, structure, or land located at 909 CENTRE AVE
Fort Collins, CO has been inspected and temporary occupancy is hereby authorized, effective on 03/10/2006
and conditional upon the following requirements being completed and approved upon final inspection.
BUILDING INSPECTION Requirements to be Completed By: 6 —/1-)
03/10/2006 OK FOR TCO FOR 90 DAYS TO RESOLVE FEE PAYMENT ISSUES AS PER MIKE GEBO TCO
UNTIL JUNE 10, 2006
ZONING Requirements to be Completed By: `�—"� f'o
03/10/2006 OK TO EXTEND ZONING TCO STATUS UNTIL JUNE 1, 2006 (SMALL PORTION OF LANDSCAPING
NOT COMPLETED)
If such work is not completed within the time set forth above and approved on final inspection, or unless the time for
completion is extended by the Building and Zoning Office, an order to vacate the premises, or a violation notice for
occupying the building, structure, or land without a Certificate of Occupancy will be issued. Such violation is subject to a
maximum fine of $1000.00 per day for every day of violation.
ontractor/Owner/L Date
Authorized By - W— Date of Issuance
NOTE: The issuance of this temporary certificate of occupancy will entitle the owner to place City Utility service in
the owner's name. Construction power rates may be substantially higher than the rate to which the owner is
entitled. Until the owner contacts the City Utility Office and makes the necessary arrangements to transfer
City Utilities to the owner's name, utilities will continue to be furnished at construction rates and both the
owner of the property and the contractor will continue to be liable to the City for all utility bills.
03/10/2006 2:52:59 PM
City of Fort Collins
Temporary Certificate of Occupancy
City of Fort Collins Permit #: B0403110
This is to certify that the building, structure, or land located at 909 CENTRE AVE
Fort Collins, CO has been inspected and temporary occupancy is hereby authorized, effective on 09/16/2005
and conditional upon the following requirements being completed and approved upon final inspection.
BUILDING INSPECTION Requirements to be Completed By: 10 - ]y - tr") 07
09/16/2005 REC'D ALL PAPERWORK -CONDITIONS FOR TCO:LOOSE ENDS IN MECH ROOM, EQIUP ONLY AT
90% ETC... 30DAYS.KCH 9/14/05
ZONING Requirements to be Completed By: ), / - ! %o - (-)z5
09/13/2005 small portion of landscaping not complete. ok for TCO. Drahota will call when complete. tco ok for 60
days from issuance. JLN
ENGINEERING Requirements to be Completed By: / 0 - / (r, - o
09/13/2005 Escrow of $2700.00 received for TCO per Wayne Lenard
If such work is not completed within the time set forth above and approved on final inspection, or unless the time for
completion is extended by the Building and Zoning Office, an order to vacate the premises, or a violation notice for
occupying the building, structure, or land without a Certificate of Occupancy will be issued. Such violation is subject to a
maximum fine of $1000.00 per day for every day of violation.
Co tractor/Owner/Lesse Date
Authorized By Date of Issuance
NOTE: The issuance of this temporary certificate of occupancy will entitle the owner to place City Utility service in
the owner's name. Construction power rates may be substantially higher than the rate to which the owner is
entitled. Until the owner contacts the City Utility Office and makes the necessary arrangements to transfer
City Utilities to the owner's name, utilities will continue to be furnished at construction rates and both the
owner of the property and the contractor will continue to be liable to the City for all utility bills.
09/16/2005 11:17:29 AM