HomeMy WebLinkAbout2251 BAR HARBOR DR - DISCLOSURES - 4/24/2014Date of Test: 4/24/2014
Customer: Journey Homes
7251 W. 20th Street
L-200
Greeley, CO 80634
Test Results
1. Airflow at 50 Pascals:
(50 Pa = 0.2 w.c.)
2. Leakage Area:
3. Building Leakage Curve:
4. Test Settings:
5. Accuracy Level
BUILDING LEAKAGE TEST
GS Services
2000 S. College Ave
suite 308
Fort Collins, CO 80525
Test File: Journey Homes 2251 Bar Harbor BD
Technician: Paul Higman
Project Number:
Building Address: 2251 Bar Harbor
Fort Collins, CO 80524
1060 CFM50 (+/- 1.9 %)
1.98 ACH50
58.3 in2 LBL ELA @ 4 Pa
Flow Coefficient (C) = 18.7 (+/- 13.6 %)
Exponent (n) = 1.033 ( +/- 0.038 )
Correlation Coefficient = 0.99916
Test Standard: RESNET Multi -Point Test
Test Mode: Depressurization
Standard Level of Accuracy Test
Infiltration Estimates
1. Estimated Average Annual Infiltration Rate:
2. Estimated Design Infiltration Rate:
Cost Estimates
1. Estimated Cost of Air Leakage for Heating:
2. Estimated Cost of Air Leakage for Cooling:
0
59.9 CFM
0.11 ACH
Winter: 96.6 CFM Summer: 64.1 CFM
0.18 ACH 0.12 ACH
Paul
Higm
signed by:
:/CN = Paul
Inan C = US
:e: 2014.04.25 08:
51-06'00'
�.y t t
2I M q BUILDING LEAKAGE TEST Page 2 of 4
Date of Test: 4/24/2014 Test File: Journey Homes 2251 Bar Harbor BD
Building Information
Volume
32149
Surface Area
Floor Area
3158
Height'
18
# of Bedrooms
3
# of Occupants
Year of Construction
2014
Wind Shield
M
Heating and Cooling Cost and Efficiency Information
Heating Fuel Gas
Heating Fuel Cost
Heating Efficiency %
Cooling Fuel Cost
Cooling SEER
Location Climate Information
Ventilation Weather Factor
0.87
Energy Climate Factor
17.00
Heating Degree Days
6128
Cooling Degree Days
297
Design Winter Wind Speed
7.3 mph
Design Summer Wind Speed
9.4 mph
Design Winter Temp Diff
73 deg F
Design Summer Temp Diff
15 deg F
Equipment Information
Type
Manufacturer
Model
Serial Number
Custom Calibration Date
Fan
Energy Conservatory
Model 3 (110V)
Default
Micromanometer
Energy Conservatory
DG700
GS Se ces
BUILDING LEAKAGE TEST Page 3 of 4
Date of Test: 4/24/2014 Test File: Journey Homes 2251 Bar Harbor BD
Depressurization Test:
Environmental Data
Indoor Temperature (A°F)
Outdoor Temperature (A°F)
Altitude (ft)
67.0
71.0
4950.0
Data Points - Data Entered Manually
Nominal Baseline Adjusted Fan
Building Pressure Building Pressure Pressure
(Pa) (Pa) (Pa)
-2.5
n/a
n/a
-60.1
-57.9
38.6
-55.6
-53.4
30.7
-50.1
-47.9
238.9
-45.9
-43.6
185.9
-40.1
-37.9
146.1
-34.8
-32.5
111.1
-30.1
-27.9
73.2
-25.1
-22.9
50.1
-20.0
-17.8
30.7
-2.0
n/a
n/a
Time Averaging Period: 10
Nominal Adjusted
Flow Flow Fan
(cfm) (cfm) % Error Configuration
1129
1256
1.9
Ring A
1010
1124
-0.9
Ring A
915
1018
0.5
Ring B
808
899
-2.4
Ring B
717
798
0.3
Ring B
626
696
2.3
Ring B
509
566
-2.3
Ring B
422
470
-0.6
Ring B
331
368
1.2
Ring B
Deviations from Standard RESNET Multi -Point Test - Test Parameters
None
- * n value outside of normally accepted limits.
* n value and/or correlation coefficient limits are not officially part of the RESNET Multi -Point Test
Standard.
'�'�
���5� �g
�� BUILDING LEAKAGE TEST Page 4 of 4
Date of Test:4/24/2014 Test File: Journey Homes 2251 Bar Harbor BD
Comments
House WRT Garage=-45.9pa
FCityof Planning, Development & Transportation Services
.�Ort CO«II1S Community Development& Neighborhood Services
�.�^-l`'`��.
Simulated Performance Alternative (SPA) Cover Sheet �
Submittal and Rating Type
�Stock Plan Permit—Projected Worst-Case Rating Builder Model:
�Lot-specific Permit- Projected Rating Address:
❑� Completed Home—Confirmed Rating Add�ess: 2251 Bar Harbor
Data Required for All SPA Ratings
Builder: �ourney Homes Rating Firm: GS S@NIC@S -
Energy rater: PBUI HIgCT1aCl Date: 4-24-14
Duct Location In uts
Location Su I Return
% Area R-Value % Area R-Value
All within conditioned space 100 0 100 0
Utilit Rates
Ener Source Service char e Rate
Electricity 5 $/month 0.10 $/kWh
Natural gas �5 $/month 0.60 $/therm
Spaces considered outside the thermal boundary:
Additional Information for Stock Plan Permit- Projected Worst-Case Rating
"Worst-case"configuration:
Foundation type(s)
Options included
Orientation of front elevation
eAttach REM/Rate Fort Collins 2012 Annual Energy Cost Compliance report
Attach REM/Rate Energy Code Inspection Checklist
Additional Information for Lot-Specific Permit— Projected Rating
�ttach REM/Rate Fort Collins 2012 Annual Energy Cost Compliance report
ttach REM/Rate Energy Code Inspection Checklist
Additional Information for Completed Home - Confirmed Rating
�Attach REM/Rate Fort Collins 2012 Annual Energy Cost Compliance report
(Utility rates reflected in this report must be City-approved rates on lot-specific permit application date.)
❑Attach Home Energy Rating Certificate
Updated 11/09/2012