Loading...
HomeMy WebLinkAbout908 CAMPFIRE DR - DISCLOSURES - 1/29/2014 (3)City of Fort Collins Residential Mechanical Systems Performance Report This form Is a record of testing targets and results, with Pass/Fail outcomes. For Information on measurement tools and testing techniques, seethe "Residential New Construction Mechanical Systems Testing Guide! The guide and this form may be periodically updated; check the Building Sar Aces web site for the current version. This form must be completed and signed by an `Approved Agency," and submitted to Building Services as a requirement for receiving a C.O. Color key raa HVAC Measured value to Target orOmR < comparew4h target or Pass %FaA. : Caution Other date 908 Campfire D r D R Horton Four Seasons Heating Inc TesUrlg date(s) 1129114 ,ca 2 LhEx i h ust(Spot)�Ventll,_ h.. _• Bath exhaust Flow box Flow collar 7;-N Passive flow hood Pilot tube traverse of air through Indicated flow to Volumetric flow multiplie Temperature Measurement tool [:,5000', air temperature[' 7-0978� Operation P Minimum Oaslgn Indicated Exhaust Pickup Location Intermittent or Airflow Airflow Flow yolumeutc flow pees fall Continuous Requirement (CFM (CFM) (CFM 5,000') (CFM 6000') 5000') MasterB. ✓intern Conlin'S9 78 Bath p 1 ✓Intermit _ Conlin 50 65 Laundry Room _eIntarmit _Conan 1:50 t}. 76 ❑ y"eu_�i _Intermit _Conlin ❑ p•;-.,:;' _Intermit _Conlin ❑�' v. _ Intermit _Conlin ::.,.. m�tit?i�. ,+ Intermit Conlin ❑ ❑ _ Intermit _ Conlin Kitchen exhaust Oven fuel _Gee Electric Exhaust eldlow Operation _Intermittent Continuous :-i; Measured airflow ❑ NIA — Kitchen hood does not vent outside Mlnimum exhaust airflow requirement 1o0 CFM 5000' Airflow measurement method Flow box _ Flov collar _ Passive flow hood _Pilot tube traverse Temperature of alr through 71 F Indicated flow to Volumetric flow mulOpliei 1 099 measurement tool @ 5000', air temperature Indicated flow 105 CFM Volumetric flow 115 CFM SOW Pass �0 Fail ,i Testing notes (fan speed, masking, flow out of range,...} is"v£ Mtchannl Srsrems Perfmmence Tesere Submina Fwm V20120608 1016 nla ❑ivrlllnn I Init Vr-nhlatic Systems other than sub -structural floor exhaust Minimum exhaust airflow requirement CFM 5000' DeelgnAlrnow Measurement Measurement Location+ (CFM 6000') Method AlrTemparalure (F) Flow box 71 Total exhaust airflow 54 _ Passive flow hood _Flow collar Powder Pilot tube traverse _ Ffow collar Total supply airflow _ Phot tube traverse _ Flow box Passive flow hood Indicated to Measured Airflow Volumetric Flow Indicated Flow Volumsirlc Multiplier (CFM) Flow Pass/Fall (CFM 6000') c_ 53 59 Q. u Ir systems in which supply airflow is circulated by the air handler tan, fan speed for measurement _ Heat Cooling Continuous fan Balanced airflow in balanced systems Average of measured supply CFM $D00' Target flow range and exhaust flows (average+/-76°6) to ,,�0, CFM 5000' Pass Fail Sub -structural floor exhaust 0 N!A — no sub -structural floor exhaust system r Design eirfiow CFM6000' "'. Measured airflow "` '• Airflow measurement method —Flow box _ Flow collar _ Passive flow hood _ Pitot tube traverse Temperaturesu air through nttoo,�F Indicated row to Vdumetric lbw multiplier� measurement tool C $000'. eir temperature Indicated flowCFM Volumetric flow) CFM 6000' 0 Pass 44'Fail Q N/A — no ductwork of air through work or no ductwork outside conditioned apace measurement tool F House conditioned floor area 1af Indicated flow to @ 50 0'. ar to peramulttllre �I � 5000', air temperature Maximum Allmuad nucf I nn4nnn I _.,-__ Test Parameter and Conditions Normalized Leakage Absolute Indicated flow Volumotrle (CFM26/ 100 sl) Leakage (CFM26) (CFM26) Flow (CFM26 6000) Measurement Timing Air Handler Pass/Fell Tolef leakage Rough -in Excluded 4 Total leakage RougMn IncludedEl Total leakage Complete Included 12 , ElLeakage im to outdoors Complete Included 5 - 7' Marhanul Sya1CM$ Padomunca Teiting 6ubmklal Forth V2e120n08 2 a a NEWMEEMEM Filter type Brand Columbus Type I style pleated Thickness Inches MERV(optional) Static pressures (OPTIONAL) Cooling coil Installed _Y N Mode:_' Heating Cooling Continuous Fan Fan speed tap Humidifier bypass _ Open _Closed —All registers open P.- AP filter P.+ P=4 AP AC coil - AP Total ESP = Cooling: Measured air flow through Indoor coil using flow grid NIA- no AC system Installed p Design cooling airflow CFM 500Y Target airflow limits (design +1- 15%) CFM 5000' Measured airflow Cooling fen speed top Flow gdd plate size Temperature of air throug measurement t00FI F Indicated flow to Volumelfic flow multiplier 6000', air temperature C NSOP pa TFSOPF Pa Flow Resistance Correction Facto Measured airflow, no adjustments or correction CFM Adjusted (Indicated) airflow CFM Volumelfic flow CFM 5000' 0 Pass lb']Kf�4 11 Heating: Gas manifold pressure FY OEM manifold pressur speci ficallon, 50 �f3 2 1W c Target manifold pressure limits (spec +1. 6%) 3,::.'-Ao,3,8 IWC Measured manifold 3.5 IWC P,N-g n �ffiFail pa pressure 01 Hosting: Temperature rise OEM temperature rise Umits F Measured temperature, as Return air 82 F Supply air 111 F U-, WM Temp rise F Pass Fall ❑ Caution: Tamp rise within NO'! 10 F of top of range WeNsWUl Systernt ParWMM" T*Sft Submfbl Foan V2012C60A 3old (This section under development, not yet being enforced) 7 Room rF 2, � -VAZ AE ',` i-v� , Register air flows Pass All regislers are cut through finish materials and me n9air 10 t. Fall (Remainder of section underdevelopment, not yet being enforced) Pressure balance Pressure difference limit, room-to-COTO F77Y�pa Room Measured pressure Pass Fall drop (Pal Master 2.5 Room # 1 1.6 0 Room # 2 1 0 IS R AAU N" systerrit POJIm Snvi, Tsinkig Submittitt Form V20120508 406 0 N/A — no natural draft combustion appliances -Worst-case depressurization testing st House setup appliances Outdoor temperature F 4 of bath fens on The" doom are cloud: Vented range hood on Clothes dryer on Air handier on forks on Appliance TYP4 Localloi E pressure BPI depressurization limit Pa Ym outside Measured not CAZ depressurization Pa wrt Wald OK (loss negative) I Caution (more negative) BPI maximum limit seconds Measured spillage duration seconds Pass = duration not exceeding limit Draft pressure BPI limit Pa %%Tt CAZ Measured Pa kvrl CAZ Pass - pressure more negative than limit '.''`CO concentration In und4uted flue gas BPI maximum limit PPM Measured CO ppm Pass - CO level not exceeding limit Caution - CO level 25 to 100 ppm Draft -hood Induced-dran Dran-hood Induced -draft Draft -hood Induced -draft 0 JOK 1 01 OK I C] I Caution caution ❑ Pale I' - loll Fail [:I I Pass -]fn Fail f Fail Pau ❑ Page 1719TFafl El Pass J!ffl',j Fall 0 [Pees —TuFell 100 q. lov lob 0 ass Fell 0 1 Pass 0Fall ':1 0 Pass Fail [Clz 1 'I ❑ Caution 0 1 caution 0 lCaution Mr.hsr%VAI Systems Padvarwaa Tatting SubWad Form V2012050 5016 System controls operating per design Intent t 'r system Pass Fall Local ehaust ❑ :;,+,s '� , Whoto-house ventliallon ::.: ❑ ... . Substructural floor exhaust ❑ -.:.. Heating Cooling Signatures ,` �.�'..s Approved Agency (technician performing inspection and testing documented on this form) j' Name (print) Mark Weidenhamer k>t' �--lMile �SUDervisor lf',Company t:z?'j Signature and Date HVAC contractor (F :-'.Name (print) ." Title Company .',':.::Signature and Date ort Collins license holder) Lynn Cobb Project Manager Four Seasons Heating Inc Lynn Cobb 1/30/14 Nerhsni Systems PeRorme6ce Testing SubMIUM Fo MUMS 6ora