HomeMy WebLinkAbout933 CAMPFIRE DR - DISCLOSURES - 10/16/2013ob\wd,33(o
City of Fort Collins
Residential Mechanical Systems Performance Report
This form is a record of testing targets and results, wiM Pass/Fail outcomes. For information on measurement tools and testing techniques, see the "Residoniial New
Construction Mechanical Systems Testing Guide." The guide and this term may be po6cidi;ally updated; check the Building Services web situ !or the current version.
This to. must be completed and signed by an "Approved Agency,' and submitted to Building Services as a requirement for receiving a C.O.
1
Measuredvolueto
r'i
.,�w,..r.
#};
Color ke Y
Target or timd
n"'''r '�it
compare vath target or
Pima i,
t Fa I
Caut on '
Ober data
Bath exhaust
(,Airtbw measurement method 'x Flow box _ Flow collar
#k? —Passive flow hood — Pilot tube traverse
• �' Tempuraluro of air through indicated flow to Volumetric flow multiplier
r•:easuremont tool Q F ,''3a, SOCO', nir temperature
r Manaurad ESheunt Airflow
Minimum
Design
Operation
Airflow
Airflow
Indicated
Flow
VoCFM
�
Pass
Fat]
Exhaust Pickup Location
Intermittent or
Requirement
(CFM
Flow
Sic
(CFM 5,000')
Continuous
(CFM 6000')
5000)
(CFM)
IhVA R DO/ -IN
/nlCnnitConlin
nit Conlin
4}�t�� ;_ :`P1s.,
;
� It C_.ZInte
Intermit Conlin
— —
`p
� �
D
v
_ Intermit Cardin
-".
intermit Conlin
SN t:s
❑ _-
lntennit _Contin
�.
a
r. U
_ Intermit — Cnntm_
intermit _Contin
O
U.
Kitchen exhaust
Oven fuel E
Gas
Electric
Exhaust eir0rnv
Operation _Ir,;ermiden! _Continuous
(}' NIA - Kitchen hand does not vent outside
Minimum exhaust aidtcw requiremen'.7 . — CFM 5000'
Measured airflow
t ` Flow box _ Flow coltflf
Airilovr measurement rne:hod _ Pe flow hood _ Pilot tube traverse
Temperature of air through in::'�catad fltw to @ 500 tric flow muitipliu3
F
measurement tool rLD. 500"u'', air temperature
7. s
Indicated flow[=CFk1 Volumetric flow�CFM 5000' Pass ? 1,Fail
3
l;Testing notes ((an speed, masking,
Q now out of range„ .. )
tnxhenca! Syslm:s Perlm"Ame TeStlna Submiltst Form V20120000 tat s
Systems other than sub -structural floor exhaust
'Minimum exhaust airflowrequirement In z_� ',t u-FM 5000,
of - le,,. �..�>• �.•,r... ,b-d
Indicated to
Measured Alrftuw
Design Alrfiow Measurement Measurement Location+
Volumetric
Flow
Indicated Flow
Volumetric
Flow
PassfFail
(CFM 5000') Method Air Temperature (F)
Multiplier
(CFM)
(CFM 5000')
:q
i
YP� sic flow hood
O
,,YY
.
Total exhaust airflow
G
Flow collar
"�
I�
V
L
,®
Pilot tuba traverse
_ Flow collar
'A
Pilot tube traverse
El
r C
Total supply airflow
_ Flow box
Passive flow hood
'r•',. For systems in which supply airflow, is dreulated by the air handler fan, fan speed for measurement( —Heat Cooling _ Continuous fan
Balanced airflow in balanced systems
Average of measured supp y 'faryet flow range
and exhaust flows 5006' (average +/• 15°iot ' c^* to _ CFM 5000'
Pass 3'•�_�yzc'„-�;; Fail
/Sub -structural floor exhaust .,�1" NtA-- nnsub•structuratfloor exnaust.system
l M A\
1'�: ,'Design airflow C CFM 5000'
Measured -airflow,
Airflow moasuremont me0+od — flow box _ Flow collar
.:f r _ Passive now hxd _ Pilot tube traverse
l Temperature of air throughF Indicated low to Volcmetrc flow muiHplie
measurement toot Q 5000', air tempendun
Indicated flow�CFM Volumetric nowCFM 5000' ❑ Pass Fail
Temperatugh
ure of airthrtool
" N/A — no ductwork or no ductwork out�sideecc�o.^dnioned space Lure of amen tool F
House conditioned floor arsal js; Indicated fitry to Volum
etric flow muitipiiar��
L 1 metr air tampereture
Maximum Allowed Duct Leakage Measured Duct Leakage
Teat Parameter and Conditions
Normalized Lockage
Absolute
Indicated Flow
Volumetric
(CFM251100 at)
Luakago
(CFM25)
(CFM25)
Flow
(CFM25 5000')
Measurement
Timing I
Air Handler
Pass/Fall
'iotaileaka a
9
Rou h-In
9
(Excluded
A
❑
^
F
Total leakage
Rough -in
included
Total leakage
Complete
Included
12
l
❑
[Q}
Leakage to outdoors
Complete
included
MeclaNcl Srslan, eCftfll.l Taming SubmFlal'fen11 V20120MB .off
Type I style P IGe f.( Thickness[==inches
Static pressures (OPTIONAL)
Coxing coil installed _ Y _ N
Mode: Heating
— Cooling
Continuous Fan
P=4�
Fan speed tea
Humidifier bypass _ Open _Clcsed
_ AJI registers open
P=-
i
P=+
AP filter= —
P=-
MERV (optional)t-- J—t
AP AC coil =
Cooling: Measured air flow through indoor coil using flow grid ❑ N/A- no AC system installed
C� e , d
; Design cooling airflow, �O „', CFtd 5000' range: airflowlimits (design 41- 15%) 5000'
:.Measured airflow
. ,. Cooling fan sly ed tap
Temperature of air lhrouc F
measurement, tool b
NSOP Pa TFSOpE?� z Pa
'. Measured au9lo�w, no adjustments or correction F �7 t. ICFM
Volumetric flow`---'CFM 5000.....Pass
Heating: Gas manifold pressure
Flow arid plate sire
Indicated flaw to Volumetric f:ow multipiier
(3 5000'. air temperature
Row Resistance Correction Facteri i - O 3
Adjusted (indicated) airflow IS'q 7 CFNI
f �❑��-,�Fall
x OEM manifold pressure
' specificati n, 5000' IWC Target manifold pressure limits (spee+7- 5-A) ,3 -AfWC
k" Fail
Measured manifold pressure3 , L� WCN'� pass � ;�.'�§❑�
Heating: Temperature rise
J
OEM temperatuie rise limits F
'zMeasured temperature. rise
r�� r
f {: Return air F Supply air
y ' 11
Tamp dsaF W7
U — F
rrI'd a
?ass kQ� Fail
,._.
❑ Caution! Temp rise within
10 F of top of range
mwhardca, s"wms Panor rai rominp'submMal Faaa V20121160e 3016
(This section under development, not yet being enforced)
Register air flows
Al registers are cut through finish materials and moving air Pass :"E]U Fail
J;.
(Remainder of section under development, not yet being enforced)
Pressure balance
Pressure oifferance limit. room -to -core
[-- '-- A16 �' I Pa
I
Room
Measured pressure
i Pass
Fall
drop (Pal
C1
;V,
46,
-0-
q
mvhml Syttems ftrfarmance TLOsi S,omrtw Fanns 12012MO9 405
c
N/A - no natural draft combustion appliances Outdoor temperature�F
Worst -case depressurization testing
1 (House setup
1. j
,. Tested appliances
g'-=i Appliance
S
Type
fry
r"
Location
r-
CAZ pressure`c BPI depressurization limit Pa krt outside
t,..;
r reasured nal CAZ depressurization Pa wrt outside
�rt
F OK (lass negative) I Caution (more negative)
These doors are dosed:
Dra+ft•hood
v.induceddwh
Draft -hood
, Inducaddraft
__Draft -hood
induced -draft
❑ �AK Caution ❑ OK 10TCauflcin
❑
OK ❑'
Caution
,�� SpilWge
BOO`
a60 <-;
_.
=`
80 =�
BPI maximum seconds
Measured spillage duration seconds
Pass = duration not exceeding limit
❑
Pass I,
Fall
❑
Pass
iE] Fail
(❑
Pass
°r: t
Pail
Dr aft pressure .
BPI limit Pa Hrt CAZ
I
Measured Paw CAZ
- Pass = pressure mare negative than limit
CO concentration inundiluted flue gas
BPI maximum limit ppm
_ Measured CO ppm
Pass =CO level not exceeding limit
Caution = CO level 25 to 100 ppm
[] Pass
❑i Fail
❑ Pr ass[]-
Fail ❑
Pass
❑i S,i Fail
,.. 100' 100_ '-
____
ADO
�J I Pass ❑� Fait ❑
__
Pass jj j j Fail
❑ Pass ?❑.
Fcii!
[y]' Caution �,Jr
Caution
r ❑ Caution
Mecmukel systems peesrmens Temp submetat Form v2ciNsos 5 of fi
Systen contralti operating per design inteni
t3 z
rz+w
•a
Local exhaust
Whele-hcuse ventilation
h� anti.
Sub-stnuctQral floor exhaust
L4
lieafirg
c �
� '
�m e,
C¢aHng
�y
c
m,
Approved Agency (technician performing inspection and testing documented on this form)
--.. .-- --....---._._...:....
ice:-Name(print) 13Gr na Y�. .�/: r
' Title
Company OV SCJy/S:O. 1'{Y�.R 'f-Jile
4 Signature and Data li..�.c�,
HVAC contractor (Fort Collins license holder)
('- Name (prat)LV � L —_"
n v+. tes+_—
�7�tcT /(iranuAnPY"
: Tdle
Company
Signature and Onto
fll,=n'MiS)52Si Pzr*"'*M2 ft%6iO fuSvidh' Form V2a1ffi`,3U iof